[{"name":"SP-190224","title":"TSG SA report to TSG RAN #83","source":"TSG SA Chairman","contact":"Erik Guttman","contact-id":18782,"tdoctype":"report","for":"Information","abstract":"TSG SA report to TSG RAN #83. Topics for SA-RAN Coordination: - Joint SA-RAN determination of the Rel-17 schedule. - Identification of overall schedule impact of a 'gradual' stage 3 freeze. Note that the time between Stage 2 freeze and Stage 3 RAN WG2 \/ RAN WG3 freeze increases from 2 to 3 quarters. This increases the risk of late input by RAN WG2 \/ RAN WG3 to SA WG2. - LSs on topics identified for RAN-SA coordination have been sent, asking feedback (this is not a complete list): - S2-1902904: LS on QoS Support for eV2X over Uu interface (To: RAN WG2, RAN WG3) - S2-1902908: LS on EPS Additional RRM Policy Index (To: RAN, RAN WG2, RAN WG3, CT, CT WG4) - S2-1902903: LS on Completion of FS_RACS study (To: RAN, RAN WG2, RAN WG3, CT WG1, CT WG4) - Action for RAN \/ WGs: Please prioritize responses to LSs where SA WGs ask advice in order to assure timely completely of the related features.","secretary_remarks":"Noted","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"Reports from TSG SA ad-hoc meetings and workshops (Reports related to features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10040,"status":"noted","reservation_date":"2019-03-19 04:33:01","uploaded":"2019-03-19 04:34:02","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_83\/Docs\/SP-190224.zip","group":"SP","meeting":"SP-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]