[{"name":"R4-2407018","title":"CR for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-03-05 18:06:52","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407019","title":"TDOC for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"discussion","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-03-05 18:10:21","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":[{"winame":"TEI17"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407022","title":"Clarification of multiple carrier operation for n100\/n101","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"discussion","for":"Discussion","abstract":"Clarification of multiple carrier operation for n100\/n101","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-06-05 09:19:25","uploaded":"2024-05-07 12:47:50","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407022.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407023","title":"Clarification on multiple carrier operation for n100\/n101, R17","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"CR","for":"Agreement","abstract":"Clarification on multiple carrier operation for n100\/n101, R17. MCC: Parsing Failure as change request number wrong on CR cover for TDoc R4-2407023. Database value : 0600. CR cover value : blank. A revision is required. ","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-06-05 09:27:51","uploaded":"2024-05-07 12:47:50","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2-Core"}],"crnumber":600.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407023.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407024","title":"Clarification on multiple carrier operation for n100\/n101, R17","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"CR","for":"Agreement","abstract":"Clarification on multiple carrier operation for n100\/n101, R17. MCC: Parsing Failure as change request number wrong on CR cover for TDoc R4-2407024. Database value : 0434. CR cover value :  blank. A revision is required. ","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-06-05 09:33:16","uploaded":"2024-05-07 12:47:50","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2-Core"}],"crnumber":434.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407024.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407121","title":"Clarification of multiple carrier operation for n100\/n101","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"discussion","for":"Discussion","abstract":"Clarification of multiple carrier operation for n100\/n101","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2024-07-05 14:07:34","uploaded":"2024-05-07 14:32:00","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407121.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407122","title":"Clarification on multiple carrier operation for n100\/n101, R17","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"CR","for":"Agreement","abstract":"Clarification on multiple carrier operation for n100\/n101, R17. MCC: The Chair marked this as not pursued.","secretary_remarks":"Source modified on 5\/7\/2024. Original source : Union Inter. Chemins de Fer","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-07-05 14:15:05","uploaded":"2024-05-07 14:32:19","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2-Core"}],"crnumber":601.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407122.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407123","title":"Clarification on multiple carrier operation for n100\/n101, R17","source":"Union Inter. Chemins de Fer","contact":"Dick Martens","contact-id":66311,"tdoctype":"CR","for":"Agreement","abstract":"Clarification on multiple carrier operation for n100\/n101, R17. MCC: The session chair marked this as not pursued.","secretary_remarks":"Source modified on 5\/7\/2024. Original source : Union Inter. Chemins de Fer","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-07-05 14:25:55","uploaded":"2024-05-07 14:32:56","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW_Ph2-Core"}],"crnumber":435.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407123.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407151","title":"(NR_newRAT-Core) CR for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-07-05 17:46:41","uploaded":"2024-05-12 20:12:16","revisionof":"","revisedto":"R4-2409942","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":603.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407151.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407152","title":"TDOC for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-07-05 17:57:55","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":604.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407216","title":"(NR_newRAT-Core) TDOC for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"discussion","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2024-08-05 18:17:24","uploaded":"2024-05-12 20:12:16","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407216.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407381","title":"(NR_NTN_solutions) CR for TS 38.104: Modification of HAPS operationg bands description","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"CR","for":"Agreement","abstract":"CR to capture HAPS additional operating bands based on the result of WRC-23.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-10-05 08:43:29","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":605.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407382","title":"(NR_NTN_Solutions) Considerations on HAPS additional operating bands","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"discussion","for":"Discussion","abstract":"This contribution proposes additional frequency bands for HAPS operation based on the results of the ITU's  WRC-23.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-10-05 08:53:04","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407383","title":"(NR_NTN_solutions) CR for TS 38.104: Modification of HAPS operationg bands description","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"CR","for":"Agreement","abstract":"CR to capture HAPS additional operating bands based on the result of WRC-23.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-10-05 09:02:29","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":606.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407384","title":"(NR_NTN_Solutions) Considerations on HAPS additional operating bands","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"discussion","for":"Discussion","abstract":"This contribution proposes additional frequency bands for HAPS operation based on the results of the ITU's WRC-23.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2024-10-05 09:16:01","uploaded":"2024-05-13 00:40:06","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407384.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407385","title":"(NR_NTN_solutions) CR for TS 38.104: Modification of HAPS operationg bands description","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"CR","for":"Agreement","abstract":"CR to capture HAPS additional operating bands based on the result of WRC-23.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-10-05 09:19:14","uploaded":"2024-05-13 00:37:39","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":607.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407385.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407386","title":"(NR_NTN_solutions) CR for TS 38.104: Modification of HAPS operationg bands description","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Yusuke Segawa","contact-id":105879,"tdoctype":"CR","for":"Agreement","abstract":"CR to capture HAPS additional operating bands based on the result of WRC-23. MCC: The Chair marked this as withdrawn.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-10-05 09:22:50","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":608.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407418","title":"(NR_newRAT-Core) CR for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 15:25:38","uploaded":"2024-05-23 23:11:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":611.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241382","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407418.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407420","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.105 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.104.","secretary_remarks":"Source modified on 5\/10\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:53","uploaded":"2024-05-10 16:09:23","revisionof":"","revisedto":"","release":"Rel-15","crspec":"37.105","crspecversion":"15.19.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Core"}],"crnumber":287.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407420.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"9.7.6.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407421","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.105 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.104.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:54","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-16","crspec":"37.105","crspecversion":"16.15.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Core"}],"crnumber":288.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407421.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"9.7.6.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407422","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.105 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.104.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:55","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.105","crspecversion":"17.9.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Core"}],"crnumber":289.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407422.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"9.7.6.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407423","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.105 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.104.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:56","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"37.105","crspecversion":"18.4.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Core"}],"crnumber":290.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407423.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"9.7.6.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407424","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.145-2 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.141.","secretary_remarks":"Source modified on 5\/10\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:57","uploaded":"2024-05-10 16:12:21","revisionof":"","revisedto":"","release":"Rel-15","crspec":"37.145-2","crspecversion":"15.17.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Perf"}],"crnumber":379.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407424.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.7.6.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407425","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.145-2 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.141.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:59","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-16","crspec":"37.145-2","crspecversion":"16.17.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Perf"}],"crnumber":380.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407425.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.7.6.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407426","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.145-2 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.141.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:05:59","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.145-2","crspecversion":"17.11.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Perf"}],"crnumber":381.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407426.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.7.6.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407427","title":"(AAS_BS_LTE_UTRA-Core) CR to TS 37.145-2 on correction for single RAT E-UTRA operation","source":"Nokia","contact":"Man Hung Ng","contact-id":95559,"tdoctype":"CR","for":"Agreement","abstract":"Align the OTA spurious emission requirement for single RAT E-UTRA operaton with the corresponding requirement is TS 36.141.","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 16:06:00","uploaded":"2024-05-23 05:51:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"37.145-2","crspecversion":"18.5.0","workitem":[{"winame":"AAS_BS_LTE_UTRA-Perf"}],"crnumber":382.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241389","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407427.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.7.6.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407463","title":"(NR_IAB-Perf) CR for TS 38.176-2, Correction on notes for scaling factor for IAB-MT type 1-O","source":"CATT","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 5\/13\/2024. Original source : CATT","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 19:02:37","uploaded":"2024-05-13 13:23:34","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.176-2","crspecversion":"16.9.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":54.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407463.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.7.3.5.1, 6.7.5.5.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407464","title":"(NR_IAB-Perf) CR for TS 38.176-2, Correction on notes for scaling factor for IAB-MT type 1-O","source":"CATT","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 19:02:38","uploaded":"2024-05-23 23:11:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.176-2","crspecversion":"17.8.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":55.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407464.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407465","title":"(NR_IAB-Perf) CR for TS 38.176-2, Correction on notes for scaling factor for IAB-MT type 1-O","source":"CATT","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-10-05 19:02:38","uploaded":"2024-05-23 23:11:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.176-2","crspecversion":"18.4.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":56.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407465.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2407502","title":"CR for TS 38.174, Correction on specification suffix information for IAB","source":"CATT","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"MCC: Session chair marked this as noted\/not pursued.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : CATT","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-10-05 19:02:46","uploaded":"2024-05-13 13:23:40","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.174","crspecversion":"18.4.0","workitem":[{"winame":"NR_IAB-Core"}],"crnumber":106.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2407502.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.12","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408197","title":"CR to 38.108: Minimum requirements for unwanted emissions for SAN (rel-17)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 07:07:43","uploaded":"2024-05-13 15:03:33","revisionof":"","revisedto":"R4-2409985","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":63.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408197.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408198","title":"CR to 38.108: Minimum requirements for unwanted emissions for SAN (rel-18)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 07:07:43","uploaded":"2024-05-13 15:03:33","revisionof":"","revisedto":"R4-2409986","release":"Rel-18","crspec":"38.108","crspecversion":"18.2.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":64.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408198.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408203","title":"CR to 38.176-1: Correction of test tolerance value for IAB-MT total power dynamic range (rel-16)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 07:07:47","uploaded":"2024-05-13 15:03:31","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.176-1","crspecversion":"16.8.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":51.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408203.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408204","title":"CR to 38.176-1: Correction of test tolerance value for IAB-MT total power dynamic range (rel-17)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 07:07:48","uploaded":"2024-05-23 23:11:12","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.176-1","crspecversion":"17.8.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":52.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408204.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408205","title":"CR to 38.176-1: Correction of test tolerance value for IAB-MT total power dynamic range (rel-18)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 07:07:48","uploaded":"2024-05-23 23:11:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.176-1","crspecversion":"18.4.0","workitem":[{"winame":"NR_IAB-Perf"}],"crnumber":53.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408205.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408472","title":"(TEI17) CR to 37.104 on Removal of Additional spurious emission limits for GSM (BC2)","source":"Ericsson","contact":"Johan Skold","contact-id":10425,"tdoctype":"CR","for":"Agreement","abstract":"The GSM additional limits for BC2 are not anymore relevant, since they use non-standard measurement bandwidths based on work that predates the present international recommendations for unwanted emissions and are thus not aligned. Removing them will make the MSR BS specification better aligned with the international recommendation in SM.329-12 and ultimately with the Radio Regulations. The \u201cAdditional minimum requirement for BC2 (Category B)\u201d for spurious emissions is removed.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Ericsson","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 08:38:41","uploaded":"2024-05-13 12:13:50","revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.104","crspecversion":"17.12.0","workitem":[{"winame":"TEI17"}],"crnumber":1014.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241388","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408472.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":false,"clauses_affected":"6.6.1.1, 6.6.1.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408473","title":"(TEI17) CR to 37.104 on Removal of Additional spurious emission limits for GSM (BC2)","source":"Ericsson","contact":"Johan Skold","contact-id":10425,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The author stated that this was withdrawn and replaced by 9982. The GSM additional limits for BC2 are not anymore relevant, since they use non-standard measurement bandwidths based on work that predates the present international recommendations for unwanted emissions and are thus not aligned. Removing them will make the MSR BS specification better aligned with the international recommendation in SM.329-12 and ultimately with the Radio Regulations. The \u201cAdditional minimum requirement for BC2 (Category B)\u201d for spurious emissions is removed.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 08:38:52","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.104","crspecversion":"17.12.0","workitem":[{"winame":"TEI17"}],"crnumber":1015.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408474","title":"(TEI17) CR to 37.141 on Removal of Additional spurious emission limits for GSM (BC2)","source":"Ericsson","contact":"Johan Skold","contact-id":10425,"tdoctype":"CR","for":"Agreement","abstract":"The GSM additional limits for BC2 are not anymore relevant, since they use non-standard measurement bandwidths based on work that predates the present international recommendations for unwanted emissions and are thus not aligned. Removing them will make the MSR BS specification better aligned with the international recommendation in SM.329-12 and ultimately with the Radio Regulations. The \u201cAdditional minimum requirement for BC2 (Category B)\u201d for spurious emissions is removed.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Ericsson","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 08:38:53","uploaded":"2024-05-13 12:13:50","revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.141","crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":1085.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241388","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2408474.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":false,"clauses_affected":"6.6.1.5, 6.6.1.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2408475","title":"(TEI17) CR to 37.141 on Removal of Additional spurious emission limits for GSM (BC2)","source":"Ericsson","contact":"Johan Skold","contact-id":10425,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The author stated that this was withdrawn and replaced by 9983.  The GSM additional limits for BC2 are not anymore relevant, since they use non-standard measurement bandwidths based on work that predates the present international recommendations for unwanted emissions and are thus not aligned. Removing them will make the MSR BS specification better aligned with the international recommendation in SM.329-12 and ultimately with the Radio Regulations. The \u201cAdditional minimum requirement for BC2 (Category B)\u201d for spurious emissions is removed.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 08:38:53","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.141","crspecversion":"17.13.0","workitem":[{"winame":"TEI17"}],"crnumber":1086.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409067","title":"(NR_unlic_enh-Core) CR to TS 38.104 NR-U Nominal channel spacing","source":"Nokia, Skyworks Solutions, Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Nokia, Skyworks Solutions, Inc.","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 11:46:16","uploaded":"2024-05-13 15:31:55","revisionof":"","revisedto":"R4-2409962","release":"Rel-16","crspec":"38.104","crspecversion":"16.19.0","workitem":[{"winame":"NR_unlic_enh-Core"}],"crnumber":627.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409067.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.4.1.1, 5.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409068","title":"(NR_unlic_enh-Core) CR to TS 38.104 NR-U Nominal channel spacing","source":"Nokia, Skyworks Solutions, Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 24\/05\/2024. Original source : Nokia, Skyworks Solutions, Inc.","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 11:46:17","uploaded":"2024-05-24 05:11:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_unlic_enh-Core"}],"crnumber":628.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241492","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409068.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.4.1.1, 5.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409069","title":"(NR_unlic_enh-Core) CR to TS 38.104 NR-U Nominal channel spacing","source":"Nokia, Skyworks Solutions, Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 24\/05\/2024. Original source : Nokia, Skyworks Solutions, Inc.","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 11:46:18","uploaded":"2024-05-24 05:11:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_unlic_enh-Core"}],"crnumber":629.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241492","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409069.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.4.1.1, 5.4.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409070","title":"(NR_IAB-Core) CR to TS 38.174: maintenance to IAB requirements","source":"Nokia, Qualcomm Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 11:46:19","uploaded":"2024-05-13 15:31:55","revisionof":"","revisedto":"R4-2409943","release":"Rel-16","crspec":"38.174","crspecversion":"16.10.0","workitem":[{"winame":"NR_IAB-Core"}],"crnumber":112.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409070.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409071","title":"(NR_IAB-Core) CR to TS 38.174: maintenance to IAB requirements","source":"Nokia, Qualcomm Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Nokia, Qualcomm Inc.","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 11:46:19","uploaded":"2024-05-23 23:11:12","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.174","crspecversion":"17.7.0","workitem":[{"winame":"NR_IAB-Core"}],"crnumber":113.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409071.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.3, 9.4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409395","title":"(NR_NTN_solutions-Core) CR to TS 38.108: Channel raster to resource element mapping","source":"Huawei, HiSilicon","contact":"Liehai Liu","contact-id":47239,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 13:32:13","uploaded":"2024-05-13 15:06:13","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":68.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409395.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.4.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409396","title":"(NR_NTN_solutions-Core) CR to TS 38.108: Channel raster to resource element mapping","source":"Huawei, HiSilicon","contact":"Liehai Liu","contact-id":47239,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 23\/05\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 13:32:14","uploaded":"2024-05-23 05:51:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.108","crspecversion":"18.2.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":69.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409396.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.4.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409436","title":"(NR_ext_to_71GHz-Perf) CR to 37.941: 71 GHz Extension, update on missing Rx MU","source":"Keysight Technologies UK Ltd","contact":"Takao Miyake","contact-id":76264,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 13:56:13","uploaded":"2024-05-13 15:27:41","revisionof":"","revisedto":"","release":"Rel-17","crspec":"37.941","crspecversion":"17.3.0","workitem":[{"winame":"NR_ext_to_71GHz-Perf"}],"crnumber":52.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241396","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409436.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409437","title":"(NR_ext_to_71GHz-Perf) CR to 37.941: 71 GHz Extension, update on missing Rx MU","source":"Keysight Technologies UK Ltd","contact":"Takao Miyake","contact-id":76264,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 13:56:14","uploaded":"2024-05-23 23:11:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"37.941","crspecversion":"18.0.0","workitem":[{"winame":"NR_ext_to_71GHz-Perf"}],"crnumber":53.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241396","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409437.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409448","title":"CR to TS 38.104: Clarification on multiple carrier operation for n100\/n101, Rel 17","source":"Vodafone,Orange, Telecom Italia, Deutsche Telekom   ","contact":"Wael Boukley Hasan","contact-id":94076,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:15:56","uploaded":"2024-05-13 14:47:47","revisionof":"","revisedto":"R4-2409944","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_FR1_lessthan_5MHz_BW_Ph2"}],"crnumber":633.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409448.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409465","title":"CR to TS 38.141-1: Clarification on multiple carrier operation for n100\/n101, Rel 17","source":"Vodafone, Orange, Telecom Italia, Deutsche Telekom   ","contact":"Wael Boukley Hasan","contact-id":94076,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:26:06","uploaded":"2024-05-13 14:47:47","revisionof":"","revisedto":"R4-2409945","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_FR1_lessthan_5MHz_BW_Ph2"}],"crnumber":447.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409465.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409466","title":"Consideration of multiple carrier operation for n100\/n101","source":"Vodafone, Orange, Telecom Italia, Deutsche Telekom   ","contact":"Wael Boukley Hasan","contact-id":94076,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2024-05-13 14:33:32","uploaded":"2024-05-13 14:47:47","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409466.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409519","title":"CR to TS 38.104: Clarifications on RMR terminology and related operating bands","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarifications on RMR and related operating bands.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:44:58","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2409946","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":636.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409519.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 3.3, 5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409520","title":"CR to TS 38.104: Clarifications on RMR terminology and related operating bands","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarifications on RMR and related operating bands.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:44:59","uploaded":"2024-06-04 13:51:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":637.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241398","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409520.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 3.3, 5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409521","title":"CR to TS 38.141-1: Clarification on RMR terminology","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarification on RMR terminology.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 14:45:00","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":450.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409521.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409522","title":"CR to TS 38.141-1: Clarification on RMR terminology","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarification on RMR terminology. MCC: The session chair marked this withdrawn.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 14:45:01","uploaded":"2024-06-04 13:51:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.141-1","crspecversion":"18.5.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":451.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409522.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409530","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-16.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:09","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2409947","release":"Rel-16","crspec":"38.104","crspecversion":"16.19.0","workitem":[{"winame":"NR_newRAT-Core"},{"winame":" NR_n30-Core"}],"crnumber":638.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409530.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409531","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-17.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:10","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2409948","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_newRAT-Core"},{"winame":" NR_n30-Core"}],"crnumber":639.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409531.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409532","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-18.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:12","uploaded":"2024-06-04 13:41:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":640.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241382","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409532.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409533","title":"Follow-up discussion on multiple carrier operation for n100\/n101 bands","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"discussion","for":"Discussion","abstract":"In this contribution, we provide further analysis and proposals related to the \u201cmultiple carriers using wideband technologies\u201d in bands n100 and n101.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2024-05-13 14:45:14","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409533.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409534","title":"CR to TS 38.104: Clarification on multiple carrier operation for n100\/n101","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion, in this CR we provide clarification on \u201cmultiple carriers\u201d wording for FRMCS BS operation in bands n100 and\/or n101, reusing text from ECC (20)02, Decised 4. MCC: The session chair marked this as not pursued.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-05-13 14:45:14","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":641.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409534.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409535","title":"CR to TS 38.104: Clarification on multiple carrier operation for n100\/n101","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion, in this CR we provide clarification on \u201cmultiple carriers\u201d wording for FRMCS BS operation in bands n100 and\/or n101, reusing text from ECC (20)02, Decised 4. MCC: The CAT F CR was not pursued.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 14:45:15","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":642.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409536","title":"CR to TS 38.141-1: Clarification on multiple carrier operation for n100\/n101","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion, in this CR we provide clarification on \u201cmultiple carriers\u201d wording for FRMCS BS operation in bands n100 and\/or n101, reusing text from ECC (20)02, Decised 4. MCC: The session chair marked this as not pursued.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-05-13 14:45:15","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":452.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409536.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409537","title":"CR to TS 38.141-1: Clarification on multiple carrier operation for n100\/n101","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion, in this CR we provide clarification on \u201cmultiple carriers\u201d wording for FRMCS BS operation in bands n100 and\/or n101, reusing text from ECC (20)02, Decised 4. MCC: The CAT F CR was not pursued.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 14:45:16","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.141-1","crspecversion":"18.5.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":453.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409538","title":"Draft LS on multiple carrier operation for n100\/n101 bands","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"LS out","for":"Approval","abstract":"LS to ETSI TC RT asking for feedback on multiple carrier operation for n100\/n101 bands.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:17","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2409963","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI TC RT","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409538.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409548","title":"CR to TS 38.108: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF specification.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:23","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2410023","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":73.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409548.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"1, 3.1, 4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409549","title":"CR to TS 38.108: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF specification.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:25","uploaded":"2024-06-04 16:41:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.108","crspecversion":"18.2.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":74.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409549.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409550","title":"CR to TS 38.181: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF test specification.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:26","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2410000","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":23.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409550.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"1, 3.1, 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409551","title":"CR to TS 38.181: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF test specification.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:27","uploaded":"2024-06-04 16:41:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.181","crspecversion":"18.1.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":24.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409551.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409552","title":"CR to TS 38.108: Correction of the FR1-NTN frequency range","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Removal of outstanding [], and other editorial corrections to follow drafting rules.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2024-05-13 14:45:29","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":75.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409552.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409554","title":"CR to TS 38.106: removal of environmental annex","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"This is formal CR based on technical content which was Endorsed in R4-2405930. Content of the environmental annex is covered in TS 38.115-1 annex B, as well as in TS 38.115-2. There is need to duplicate it in the Core specifications (similar as for NR BS specifications).","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:31","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.106","crspecversion":"17.8.0","workitem":[{"winame":"NR_netcon_repeater-Core"}],"crnumber":79.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241468","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409554.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"A","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409555","title":"CR to TS 38.106: removal of environmental annex","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"This is formal CR based on technical content which was Endorsed in R4-2405930. Content of the environmental annex is covered in TS 38.115-1 annex B, as well as in TS 38.115-2. There is need to duplicate it in the Core specifications (similar as for NR BS specifications).","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:32","uploaded":"2024-06-04 16:41:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.106","crspecversion":"18.4.0","workitem":[{"winame":"NR_netcon_repeater-Core"}],"crnumber":80.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241468","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409555.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"A","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409557","title":"CR to TS 38.181: test condition corrections","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In relation to the Ka band related discussion on SAN test conditions, in this CR we provide improvements to the specification of environmental requirements for the SAN equipment.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 14:45:33","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"R4-2409965","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":25.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409557.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.6, annex B","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409558","title":"CR to TS 38.181: test condition corrections","source":"Huawei, HiSilicon, NEC","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In relation to the Ka band related discussion on SAN test conditions, in this CR we provide improvements to the specification of environmental requirements for the SAN equipment.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon, NEC","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:34","uploaded":"2024-06-04 17:01:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.181","crspecversion":"18.1.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":26.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409558.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.6, annex B","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409559","title":"CR to TS 38.181: Correction for OTA ICS test setup","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide correction for OTA ICS test setup, to fix cross-reference and remove [].","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:35","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":27.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409559.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"10.9.4.2, D.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409560","title":"CR to TS 38.181: Correction for OTA ICS test setup","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide correction for OTA ICS test setup, to fix cross-reference and remove [].","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:37","uploaded":"2024-06-04 17:01:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.181","crspecversion":"18.1.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":28.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409560.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"10.9.4.2, D.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409562","title":"CR to TS 38.181: removal of [] for MU\/TT values","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we remove outstanding [] from MU and TT values.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:38","uploaded":"2024-05-13 15:45:33","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":29.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409562.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.1.1, 4.1.2.2, 4.1.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409563","title":"CR to TS 38.181: removal of [] for MU\/TT values","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we remove outstanding [] from MU and TT values.","secretary_remarks":"Source modified on 04\/06\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 14:45:40","uploaded":"2024-06-04 17:01:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.181","crspecversion":"18.1.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":30.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409563.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.1.1, 4.1.2.2, 4.1.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409675","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation core requirements in certain region","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 15:20:05","uploaded":"2024-05-13 15:26:53","revisionof":"","revisedto":"R4-2409949","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":643.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409675.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409676","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation requirements in certain region","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 15:20:06","uploaded":"2024-05-13 15:26:53","revisionof":"","revisedto":"R4-2409950","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":454.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409676.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409677","title":"(NR_bands_R17_BWs-Core) CR for OTA Tx intermodulation requirements in band n79","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 15:20:06","uploaded":"2024-05-13 15:26:53","revisionof":"","revisedto":"R4-2409951","release":"Rel-17","crspec":"38.141-2","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":590.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409677.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409678","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation core requirements in band n79 R18 mirror","source":"NTT DOCOMO, INC.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Title modified on 27\/05\/2024. Original title : (NR_bands_R17_BWs-Core) CR for Tx intermodulation core requirements in certain region R18<br\/><br\/>Source modified on 27\/05\/2024. Original source : NTT DOCOMO, Inc.","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 15:20:07","uploaded":"2024-05-27 13:21:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.104","crspecversion":"18.5.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":644.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409678.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.5, 6.7.2.2, 6.7.3.3, 9.8.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409679","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation requirements in certain region R18","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 15:20:08","uploaded":"2024-05-27 13:31:20","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.141-1","crspecversion":"18.5.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":455.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409679.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409680","title":"(NR_bands_R17_BWs-Core) CR for OTA Tx intermodulation requirements in band n79 R18","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 15:20:09","uploaded":"2024-05-27 13:31:20","revisionof":"","revisedto":"","release":"Rel-18","crspec":"38.141-2","crspecversion":"18.5.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":591.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409680.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409779","title":"CR to TS 38.141-1: Clarification on RMR terminology","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarification on RMR terminology.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-13 16:05:42","uploaded":"2024-05-13 16:13:46","revisionof":"","revisedto":"R4-2409966","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":456.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409779.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"3.1, 3.3","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409780","title":"CR to TS 38.108: Correction of the FR1-NTN frequency range","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Removal of outstanding [], and other editorial corrections to follow drafting rules.","secretary_remarks":"Source modified on 5\/13\/2024. Original source : Huawei, HiSilicon","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-13 16:05:42","uploaded":"2024-05-13 16:13:46","revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":77.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409780.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409942","title":"(NR_newRAT-Core) CR for Total power dynamic range (TPDR)","source":"Charter, Ericsson, Nokia","contact":"Yuda Luz","contact-id":95852,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-23 23:11:13","revisionof":"R4-2407151","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":603.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241383","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409942.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409943","title":"(NR_IAB-Core) CR to TS 38.174: maintenance to IAB requirements","source":"Nokia, Qualcomm Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-23 23:11:13","revisionof":"R4-2409070","revisedto":"","release":"Rel-16","crspec":"38.174","crspecversion":"16.10.0","workitem":[{"winame":"NR_IAB-Core"}],"crnumber":112.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241397","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409943.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409944","title":"CR to TS 38.104: Clarification on multiple carrier operation for n100\/n101, Rel 17","source":"Vodafone,Orange, Telecom Italia, Deutsche Telekom","contact":"Wael Boukley Hasan","contact-id":94076,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The WIC listed as NR_FR1_lessthan_5MHz_BW_Ph2-Core, but was updated to NR_FR1_lessthan_5MHz_BW-Core as the more appropriate WIC.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409448","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"},{"winame":" NR_FR1_lessthan_5MHz_BW-Core"}],"crnumber":633.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241398","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409944.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409945","title":"CR to TS 38.141-1: Clarification on multiple carrier operation for n100\/n101, Rel 17","source":"Vodafone, Orange, Telecom Italia, Deutsche Telekom","contact":"Wael Boukley Hasan","contact-id":94076,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The WIC listed as NR_FR1_lessthan_5MHz_BW_Ph2-Perf is for different release as it probably should have been NR_FR1_lessthan_5MHz_BW-Perf instead. Nevertheless, 3GU is aligned with CR coversheet.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409465","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"},{"winame":" NR_FR1_lessthan_5MHz_BW-Perf"}],"crnumber":447.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241398","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409945.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409946","title":"CR to TS 38.104: Clarifications on RMR terminology and related operating bands","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarifications on RMR and related operating bands.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409519","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":636.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241398","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409946.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409947","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-16.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409530","revisedto":"R4-2410013","release":"Rel-16","crspec":"38.104","crspecversion":"16.19.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":638.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409947.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409948","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-17.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409531","revisedto":"R4-2410014","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":639.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409948.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409949","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation core requirements in certain region","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 07:01:15","revisionof":"R4-2409675","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":643.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409949.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409950","title":"(NR_bands_R17_BWs-Core) CR for Tx intermodulation requirements in certain region","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 07:01:15","revisionof":"R4-2409676","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":454.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409950.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409951","title":"(NR_bands_R17_BWs-Core) CR for OTA Tx intermodulation requirements in band n79","source":"NTT DOCOMO, Inc.","contact":"Chui Inami","contact-id":97183,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 07:01:15","revisionof":"R4-2409677","revisedto":"","release":"Rel-17","crspec":"38.141-2","crspecversion":"17.13.0","workitem":[{"winame":"NR_bands_R17_BWs-Core"}],"crnumber":590.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241393","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409951.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409961","title":"(NR_NTN_solutions) CR for TS 38.104: Modification of HAPS operationg bands description","source":"SoftBank Corp., Deutsche Telekom, NTT DOCOMO, KDDI","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"MCC: The session chair marked this as not pursued.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"not pursued","reservation_date":"2024-05-14 07:25:35","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_NTN_solutions"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409962","title":"(NR_unlic_enh-Core) CR to TS 38.104 NR-U Nominal channel spacing","source":"Nokia, Skyworks Solutions, Inc.","contact":"Bartlomiej Golebiowski","contact-id":84085,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 05:11:12","revisionof":"R4-2409067","revisedto":"","release":"Rel-16","crspec":"38.104","crspecversion":"16.19.0","workitem":[{"winame":"NR_unlic_enh-Core"}],"crnumber":627.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241492","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409962.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409963","title":"LS on multiple carrier operation for n100\/n101 bands","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"LS out","for":"Approval","abstract":"LS to ETSI TC RT asking for feedback on multiple carrier operation for n100\/n101 bands.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409538","revisedto":"R4-2410001","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI TC RT","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409963.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409965","title":"CR to TS 38.181: test condition corrections","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In relation to the Ka band related discussion on SAN test conditions, in this CR we provide improvements to the specification of environmental requirements for the SAN equipment.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2024-05-14 07:25:35","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409557","revisedto":"R4-2410003","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":25.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409965.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409966","title":"CR to TS 38.141-1: Clarification on RMR terminology","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we provide clarification on RMR terminology.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:36","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2409779","revisedto":"","release":"Rel-17","crspec":"38.141-1","crspecversion":"17.13.0","workitem":[{"winame":"NR_RAIL_EU_900MHz-Perf"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Perf"}],"crnumber":456.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241398","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409966.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409982","title":"(TEI17) CR to 37.104 on Removal of Additional spurious emission limits for GSM (BC2)","source":"Ericsson","contact":"Achraf Khsiba","contact-id":92474,"tdoctype":"CR","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:36","uploaded":"2024-05-24 05:11:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"37.104","crspecversion":"18.5.0","workitem":[{"winame":"TEI17"}],"crnumber":1016.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-241388","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409982.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409985","title":"CR to 38.108: Minimum requirements for unwanted emissions for SAN (rel-17)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:36","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2408197","revisedto":"","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":63.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409985.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2409986","title":"CR to 38.108: Minimum requirements for unwanted emissions for SAN (rel-18)","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:36","uploaded":"2024-05-24 02:51:19","revisionof":"R4-2408198","revisedto":"","release":"Rel-18","crspec":"38.108","crspecversion":"18.2.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":64.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2409986.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410000","title":"CR to TS 38.181: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF test specification.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 05:11:12","revisionof":"R4-2409550","revisedto":"","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":23.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410000.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410001","title":"LS on multiple carrier operation for n100\/n101 bands","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":62578,"tdoctype":"LS out","for":"Approval","abstract":"LS to ETSI TC RT asking for feedback on multiple carrier operation for n100\/n101 bands.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 05:11:12","revisionof":"R4-2409963","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"NR_RAIL_EU_900MHz-Core"},{"winame":" NR_RAIL_EU_1900MHz_TDD-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ECC WG FM","Cc":"TSG RAN, ETSI TC RT","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410001.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410003","title":"CR to TS 38.181: test condition corrections","source":"Huawei, HiSilicon, NEC","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In relation to the Ka band related discussion on SAN test conditions, in this CR we provide improvements to the specification of environmental requirements for the SAN equipment.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 05:11:12","revisionof":"R4-2409965","revisedto":"","release":"Rel-17","crspec":"38.181","crspecversion":"17.4.0","workitem":[{"winame":"NR_NTN_solutions-Perf"}],"crnumber":25.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"RP-241387","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410003.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410008","title":"Way Forward on multiple carrier operation for n100\/n101 bands","source":"Huawei","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 05:11:12","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410008.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410013","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-16.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 07:01:16","revisionof":"R4-2409947","revisedto":"","release":"Rel-16","crspec":"38.104","crspecversion":"16.19.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":638.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"RP-241383","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410013.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410014","title":"CR to TS 38.104: Alignment with UE specification for n30 and n77 notes in Table 5.2-1","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"In this CR we introduce new Notes in Table 5.2-1 for band n30 and band n77, aligned with TS 38.101-1 Rel-17.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 07:01:16","revisionof":"R4-2409948","revisedto":"","release":"Rel-17","crspec":"38.104","crspecversion":"17.13.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":639.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"RP-241383","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410014.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2410023","title":"CR to TS 38.108: Corrections for non-regenerative payload and gateway","source":"Huawei, HiSilicon","contact":"Michal Szydelko","contact-id":65553,"tdoctype":"CR","for":"Agreement","abstract":"Based on related discussion on Rel-19 regenerative payload (NR_NTN_Ph3-Core WI), in this CR we introduce corrections for non-regenerative payload and gateway terminology in SAN RF specification.","secretary_remarks":"","agenda_item_sort_order":6,"ainumber":"4.2","ainame":"BS RF requirements and BS conformance testing","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2024-05-14 07:25:37","uploaded":"2024-05-24 07:01:16","revisionof":"R4-2409548","revisedto":"","release":"Rel-17","crspec":"38.108","crspecversion":"17.7.0","workitem":[{"winame":"NR_NTN_solutions-Core"}],"crnumber":73.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-241386","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_111\/Docs\/R4-2410023.zip","group":"R4","meeting":"R4-111","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]