[{"name":"R5-192916","title":"Handling of FR2 UL CA test cases","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"In the latest NSA conformance specification TS 38.521-3, there is almost no test case for FR2 NSA with more than one CC (e.g. DC_1A_257F). The purpose of this contribution is to decide WF and to list up remaining issues about these NSA combinations in order to satisfy market demand.\nProposal\nProposal 1\t: Define conformance specs (TS 38.521-2, 38.521-3) for following EN-DC combinations based on assumptions in Table 2.2.1-1 and 2.2.2-1.\n?\tInter-band EN-DC combinations including FR2\n?\tBW class is D, E, F (100MHz x 2\/3\/4 CCs).","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29160,"status":"revised","reservation_date":"2019-03-29 05:37:13","uploaded":"2019-04-03 15:13:46","revisionof":"","revisedto":"R5-193318","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192916.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192917","title":"Handling of Low PSD test cases in RAN5","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29170,"status":"revised","reservation_date":"2019-03-29 05:38:25","uploaded":"2019-04-03 12:35:52","revisionof":"","revisedto":"R5-193429","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192917.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192930","title":"TP Analysis for FR2 Tx Spurious emissions UE band co-existence test case","source":"Qualcomm Finland RFFE Oy","contact":"Hemish Parikh","contact-id":61982,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29300,"status":"withdrawn","reservation_date":"2019-03-29 22:04:13","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192982","title":"On testability of Rx spurious emission test case","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29820,"status":"withdrawn","reservation_date":"2019-04-01 07:40:12","uploaded":"2019-04-03 14:57:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192982.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192983","title":"On the MU contributor gNB uncertainty on absolute level","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29830,"status":"noted","reservation_date":"2019-04-01 07:40:18","uploaded":"2019-04-03 14:57:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192983.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192984","title":"On the SNR for FR2 TRx test cases","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29840,"status":"noted","reservation_date":"2019-04-01 07:40:18","uploaded":"2019-04-03 14:57:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192984.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192985","title":"Discussion on testability of ACS and IBB","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29850,"status":"noted","reservation_date":"2019-04-01 07:40:18","uploaded":"2019-04-03 14:57:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192985.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-192995","title":"Discussion on TT of UL-MIMO test cases","source":"Huawei, Hisilicon","contact":"Chunying Gu","contact-id":65493,"tdoctype":"discussion","for":"Endorsement","abstract":"Associated CRs R5-192996, R5-192997, R5-192999\nAt RAN5#79 TT WF was agreed in R5-183952\n\u2013\tThe SA FR1 TT values should not exceed the value adopted in pure LTE (TS 36.521-1 BW = 20 MHz f = 4.2 GHz). It is assumed that the amount of uncertainty exceeding the E-UTRAN shall not be considered.\nAt RAN5#4-NR-Adhoc meeting, the MU&TT were discussed and the agreed values were captured in R5-190956. However, for several test cases with the requirements defined as the sum or the average power of each antenna, the TT are still FFS. This paper provides some consideration on those test cases.\nObservation 1: For LTE UL-MIMO test cases, the TT values are less than theoretical MU values.\nObservation 2: For NR UL-MIMO test cases, if FR1 TT WF is adopted, a UE may pass the single antenna test cases with any of its antennas, but fail the UL-MIMO test cases because of the more stringent TT.\nProposal 1: It is proposed to change the FR1 TT WF as below:\n\u2013\tThe SA FR1 TT values should not exceed the value adopted in pure LTE (TS 36.521-1 BW = 20 MHz f = 4.2 GHz) unless otherwise stated. It is assumed that the amount of uncertainty exceeding the E-UTRAN shall not be considered.\n\u2013\tFor UL-MIMO test cases with the requirements defined as the sum or the average power of each antenna, the SA FR1 TT values should not exceed theoretical MU (RSS of 2 non-UL-MIMO MUs) in pure LTE (TS 36.521-1 BW = 20 MHz f = 4.2 GHz).\nProposal 2: It is proposed to capture the TT values in the table into the specification.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29950,"status":"noted","reservation_date":"2019-04-01 09:45:44","uploaded":"2019-04-02 09:21:20","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-192995.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193057","title":"FR1 TT for UL-MIMO (transmit power)","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"FR1 TT, Proposal in this contribution will be implemented by R5-192910 (CR_0327).\nFR1 TT (Test Tolerance) for UL-MIMO was already completed except for transmit power cases (e.g. MOP), while corresponding MU (Measurement Uncertainty) was already completed including transmit power cases. The purpose of this contribution is to propose FR1 TT value for UL-MIMO (transmit power).\nProposal 1\t: Define TT for UL-MIMO transmit cases as described in Table 2.1.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30570,"status":"revised","reservation_date":"2019-04-02 09:11:44","uploaded":"2019-04-03 12:35:52","revisionof":"","revisedto":"R5-193482","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193057.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193058","title":"Review on RAN4 LS about Multi-band relaxation","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"MB. Proposals in this contribution are implemented by R5-193059 (CR_0125).\nDuring RAN5#NR4 (Jan-2019), LS capturing RAN5 assumptions for Multi-band relaxation (MB relaxation) was sent to RAN4, and reply LS was approved during RAN4#90 (Feb-2019). The purpose of this contribution is to review this RAN4 LS and discuss how to apply MB relaxation into conformance test.\n3\tProposal\nProposal 1\t: Apply MB relaxation into conformance test with following assumptions\n\t- 1) UE declaration, 2) Verdict per band, 3) Verdict per test point.\nProposal 2\t: To select Option 1.\n\t- Option 1\t: Core specification needs not to be updated.\n\t- Option 2\t: Core specification needs to be updated to include RAN4 assumptions above.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30580,"status":"noted","reservation_date":"2019-04-02 09:13:03","uploaded":"2019-04-03 12:35:52","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193058.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193060","title":"Review on RAN4 pending issues after RAN4#90","source":"NTT DOCOMO, INC.","contact":"Takahiro Arai","contact-id":65225,"tdoctype":"discussion","for":"Endorsement","abstract":"This contribution will be updated during RAN5#NR5 after corresponding RAN4 LS approval.\nRAN4 pending issues was updated after Feb-2019 meeting.\nReply LS from RAN4 was approved on 5th April based on the latest TS 38.101-1, 2, 3 (draft_v15.4.0).\nRAN5 response is drafted in attached XLS, while some specific items require additional discussion in RAN5.\nThe purpose of this document is to share complicated items and achieve RAN5 conclusion.\nIn addition, new pending issues added during RAN5#NR5 will also be captured in this contribution.\nTBD","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30600,"status":"revised","reservation_date":"2019-04-02 09:16:00","uploaded":"2019-04-03 12:35:52","revisionof":"","revisedto":"R5-193319","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193060.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193062","title":"Test configuration table for EN-DC TRx tests with CCs > 2","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30620,"status":"revised","reservation_date":"2019-04-02 09:27:16","uploaded":"2019-04-03 02:34:06","revisionof":"","revisedto":"R5-193472","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193062.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193063","title":"Consideration on MU contributions of Tx\/Rx spurious emission","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Endorsement","abstract":"Related CR R5-193069 (38.903)\nIn this contribution we discuss on measurement uncertainty (MU) contributions of FR2 Tx\/Rx spurious emission tests with in-direct far field (IFF) test system","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30630,"status":"noted","reservation_date":"2019-04-02 09:55:27","uploaded":"2019-04-03 04:40:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193063.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193064","title":"Influence of the XPD for IFF below 23.45 GHz","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Endorsement","abstract":"In this contribution we discuss a value of MU contribution \u201cInfluence of the XPD\u201d for IFF system at FR2 spurious region below 23.45 GHz.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30640,"status":"noted","reservation_date":"2019-04-02 09:55:27","uploaded":"2019-04-03 04:40:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193064.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193065","title":"Influence of the calibration antenna feed cable MU at spurious region","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Endorsement","abstract":"In this contribution we discuss a value of MU contribution \u201cInfluence of the calibration antenna feed cable\u201d for IFF  system at FR2 spurious region.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30650,"status":"noted","reservation_date":"2019-04-02 09:55:27","uploaded":"2019-04-03 04:40:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193065.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193066","title":"QoQZ MU at spurious region","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Discussion","abstract":"Report of the QoQZ evaluation result at spurious region (6 GHz, 12.75 GHz, 66 GHz and 80 GHz.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30660,"status":"withdrawn","reservation_date":"2019-04-02 09:55:27","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193067","title":"Mismatch MU at spurious region","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Endorsement","abstract":"In this paper we discuss Mismatch MU at spurious region. (up to 66 GHz)","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30670,"status":"noted","reservation_date":"2019-04-02 09:55:27","uploaded":"2019-04-03 04:50:45","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193067.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193068","title":"Network analyzer MU at spurious region","source":"Anritsu","contact":"Osamu Yamashita","contact-id":66204,"tdoctype":"discussion","for":"Endorsement","abstract":"In this paper we discuss Network analyzer MU at spurious region. (up to 66 GHz)","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30680,"status":"noted","reservation_date":"2019-04-02 09:55:27","uploaded":"2019-04-03 04:57:48","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193068.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193097","title":"TRP Integration with Offset Feed Antennas for IFF System","source":"Keysight Technologies UK Ltd","contact":"Thorsten Hertel","contact-id":77978,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30970,"status":"noted","reservation_date":"2019-04-02 20:03:40","uploaded":"2019-04-02 23:19:51","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193097.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193098","title":"On DUT Re-Positioning for TRP measurements of the 2nd harmonic","source":"Keysight Technologies UK Ltd","contact":"Thorsten Hertel","contact-id":77978,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30980,"status":"noted","reservation_date":"2019-04-02 20:06:16","uploaded":"2019-04-02 23:19:51","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193098.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193100","title":"Technical Analysis of FR2 Test Tolerance values for Spherical Coverage","source":"Apple Inc., Intel, Oppo, Xiaomi, MediaTek Inc., vivo","contact":"Wisuit Sinsathitchai","contact-id":69661,"tdoctype":"discussion","for":"Endorsement","abstract":"TS38.521-2 [1] Section 6.2.1 specifies the following five Figures of Merits for UE Maximum Output Power and Reference Sensitivity TCs:\na.\tMax EIRP\nb.\tMax TRP\nc.\tMin Peak EIRP\nd.\tMin EIRP at 85\/60\/50\/20%-tile CDF\ne.\tMax EIS\nIn Contribution R5-183909[2], the discussion about TT calculation from MU in FR2 is started, the proposals and observations for TT definition from MU in FR2 are defined.\nProposal 1: Adopt TT = 0.65 * MU for EIRP\/EIS Spherical Coverage FR2a and FR2b for DUT size = 15 cm and 30 cm for Power Class 3.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31000,"status":"revised","reservation_date":"2019-04-02 20:34:36","uploaded":"2019-04-02 22:07:33","revisionof":"","revisedto":"R5-193484","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193100.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193101","title":"On measurement grid and its MU for FR2 spurious emissions","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31010,"status":"noted","reservation_date":"2019-04-03 01:05:38","uploaded":"2019-04-03 02:14:49","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193101.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193104","title":"SNR estimation update for FR2 priority 1 and 2 TRx TCs","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31040,"status":"noted","reservation_date":"2019-04-03 02:36:14","uploaded":"2019-04-03 03:50:12","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193104.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193105","title":"On the impact from noise for EIRP spherical coverage","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31050,"status":"not treated","reservation_date":"2019-04-03 03:07:09","uploaded":"2019-04-03 03:50:12","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193105.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193106","title":"On the noise impact to FR2 OBW","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31060,"status":"not treated","reservation_date":"2019-04-03 04:01:10","uploaded":"2019-04-03 04:17:53","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193106.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193108","title":"On the FR2 ACLR MU","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31080,"status":"withdrawn","reservation_date":"2019-04-03 05:07:32","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193109","title":"On the treatment of FR2 MU depending on UL power level","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31090,"status":"withdrawn","reservation_date":"2019-04-03 05:14:38","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193131","title":"Discussion on minimum test time for PDSCH and PDCCH with more simulation results","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31310,"status":"withdrawn","reservation_date":"2019-04-03 06:08:36","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"38.521-4","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193132","title":"Discussion on FR1 SDR test case structure","source":"Qualcomm Korea","contact":"Vijay Balasubramanian","contact-id":43758,"tdoctype":"discussion","for":"Discussion","abstract":"The latest RAN4 performance spec [1] has mostly finalized the requirements for sustained downlink data rate test for FR1 SA mode. Applicability for FR1 DC is pending RAN4 discussion. Also as mentioned in the LS to RAN5 [4], the SDR test duration and DL RMC for different SDR usecases are left for RAN5 to decide. \nThis paper is for discussing how to test and structure SDR test in RAN5 spec.\nObservation1: Instead of different UE categories defined in LTE, NR has a single max data rate equation. There are UE capabilities (num layers, modulation order, scaling factor, numerology) that governs the max data rate a UE can support.\nProposal1: Define a single test case for single carrier encompassing FDD\/TDD and other UE capability parameters.\nObservation2: With NSA mode, the number of RMC will further increase as even LTE RMC need to be defined for various BW, UE categories, UE releases. There definitely is a need to minimize the possible combinations.\nProposal2a: Adopt the proposed combinations for which DL RMC, UL RMC, PDCP param will be provided in the Annex section of 38.521-4 spec. \nProposal2b: As per the RAN4 LS [4], RAN5 to define the DL RMC and any associated UL RMC for the proposed combinations in prop2a\nProposal3: Keep test duration for SDR test to 300 subframes (+ time needed to finish HARQ or RLC retransmissions).\nProposal4: Fix Es power level for the FR1 SDR test case to -112 dBm\/Hz.\nProposal5: Define a SDR for CA section and split as per number of DL CCs.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31320,"status":"revised","reservation_date":"2019-04-03 06:10:46","uploaded":"2019-04-09 12:27:54","revisionof":"","revisedto":"R5-193486","release":"","crspec":"38.521-4","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193132.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193148","title":"Discussion on TPs for Asymmetric CH BWs in Reference Sensitivity Requirements in FR1","source":"Dish Network","contact":"Jussi Kuusisto","contact-id":39729,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31480,"status":"noted","reservation_date":"2019-04-03 07:10:11","uploaded":"2019-04-03 09:46:43","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.521-1","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193148.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193167","title":"OTA TX spurious emission at FR2 \u2013 DUT repositioning","source":"MVG Industries, Sony","contact":"Alessandro Scannavini","contact-id":52688,"tdoctype":"discussion","for":"Discussion","abstract":"During last 5G UE RF NR MU meeting, there were discussions focused on OTA measurements of spurious emission. Specifically, it was proposed to reposition the DUT so that the main beam (in band) was toward the measurement antenna when measuring power at the","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31670,"status":"noted","reservation_date":"2019-04-03 07:47:56","uploaded":"2019-04-03 07:52:51","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193167.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193184","title":"On ACLR measurement uncertainty","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31840,"status":"withdrawn","reservation_date":"2019-04-03 08:53:59","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193185","title":"On gNB uncertainty on absolute level MU","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31850,"status":"noted","reservation_date":"2019-04-03 08:54:58","uploaded":"2019-04-03 13:54:09","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193185.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193186","title":"On Refsens MU","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31860,"status":"noted","reservation_date":"2019-04-03 08:56:47","uploaded":"2019-04-03 13:55:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193186.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193187","title":"On noise impact","source":"Keysight Technologies UK Ltd","contact":"Emilio Ruiz","contact-id":62021,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31870,"status":"noted","reservation_date":"2019-04-03 08:57:34","uploaded":"2019-04-08 02:47:58","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193187.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193227","title":"On MU for FR1 UL CA","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32270,"status":"withdrawn","reservation_date":"2019-04-03 09:22:46","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193228","title":"Test points for Wideband Intermodulation for EN-DC including FR1 (3 CCs)","source":"Anritsu","contact":"Hiroyuki Baba","contact-id":65585,"tdoctype":"discussion","for":"Endorsement","abstract":"This paper provides the analysis for test points for wideband intermodulation for EN-DC including FR1(3 CCs).\nProposal 1 : Define test points so that all NR band experience PCC(SCG) regardless of the NR exceptional\/non-exceptional(tested with LTE anchor agnostic) \nProposal 2 : Define test point so that all LTE bands associated with LTE exceptional requirement experience PCC(MCG)\nOvseravation1 : Reduction of test points can be considered if the combination generates too many test points by means of e.g. merging multiple test points to single test points (by e.g. change some parameters) as was done in LTE CA.\nProposal 3 : Adopt default test points as specified in Table 3 for Wideband Intermodulation TCs for EN-DC in FR1 (3 CCs)","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32280,"status":"revised","reservation_date":"2019-04-03 09:22:48","uploaded":"2019-04-08 17:34:19","revisionof":"","revisedto":"R5-193473","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193228.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193235","title":"Discussion on VNA uncertainty for spurious emission test","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32350,"status":"withdrawn","reservation_date":"2019-04-03 09:29:11","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193236","title":"On mismatch uncertainty for ACLR","source":"ROHDE & SCHWARZ","contact":"Edwin Menzel","contact-id":65839,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32360,"status":"not treated","reservation_date":"2019-04-03 09:29:11","uploaded":"2019-04-03 14:57:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193236.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193262","title":"Discussion on TT and the impact on UE fail rate for EIRP CDF","source":"Ericsson, Telecom Italia, Orange","contact":"Mikael Zir\u00e9n","contact-id":81237,"tdoctype":"discussion","for":"Endorsement","abstract":"At the RAN5#81 meeting it was agreed that for FR2 MOP test use TT=0.65*MU to achieve a 10% fail rate for a marginal UE [1].\nAt the RAN5#82 meeting the TT for EIRP CDF test was under discussion, but no agreement could be reached. Proposals were TT=0.65*MU [2] and TT=2 dB [3]. \nDuring the discussion it was argued that the impact on the UE fail rate with same TT as the EIRP test is less due to that EIRP CDF verdict is a combined one based on hundreds of individual measurements, but no formal input document was presented.\nThis paper provides justification why the UE fail rate can be lower in EIRP CDF test than in EIRP test, thereby allowing a lower TT than in the EIRP test without a negative effect on UE fail rate.\n3\tConclusion\nThe TT of 3.5 dB that gave 8% UE fail rate in EIRP test, gives significantly lower UE fail rate when considering multiple measurement points unless all measurement errors in the measurement grid are correlated (same error in all points). \nThe exact UE fail rate depends on the correlation between measurement error across grid points, but it will always be lower than in the EIRP test unless all measurement errors are 100% correlated. \nProposal\nProposal 1: Reduce TT to 2.0 dB (or TT=0.4*MU) for EIRP CDF test as this still gives a 0% UE fail rate if measurement errors are statistically independent. For the unrealistic worst case of 100% correlated measurements this mean 21% UE fail rate for a UE with zero margin to the core requirement.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32620,"status":"revised","reservation_date":"2019-04-03 11:16:06","uploaded":"2019-04-03 14:48:26","revisionof":"","revisedto":"R5-193483","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193262.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193318","title":"Handling of FR2 UL CA test cases","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29161,"status":"noted","reservation_date":"2019-04-15 13:35:03","uploaded":"2019-04-15 13:37:57","revisionof":"R5-192916","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193318.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193319","title":"Review on RAN4 pending issues after RAN4#90","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30601,"status":"noted","reservation_date":"2019-04-15 13:35:04","uploaded":"2019-04-15 13:37:57","revisionof":"R5-193060","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193319.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193383","title":"WF on Low PSD issue","source":"NTT DOCOMO","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"NOTE\nThis WF to be applied only for Priority 1,2 Low PSD cases (Off power, SEM, ACLR, Rx Spurious).\n\u201cRelaxation\u201d = \u201cRelax_1 (Required relaxation value to avoid Low PSD)\u201d + \u201cRelax_2 (legacy TT based on MU)\u201d\nTest requirement = Min req. + Relaxation = Min req. + Relax_1 + Relax_2 (Relax_1 = 0 in LTE, FR1)\nProcess for how to treat Low PSD items\nRequired relaxation value (Relax_1) to be analyzed \/ endorsed by MU contributors per TC.\nFollowing inputs to be prepared by operators using attached XLS format\nUpper limit of acceptable relaxation value per TC\nAcceptable options per TC\nTC list of regulatory items for each regulatory bodies (e.g. FCC, CE)\nRAN5 concludes which option to be applied for each TC considering inputs above.\nConclusion will be defined TC by TC, and applied relaxation value and options will be updated in the future.\nAction points\n[May-19, RAN5#83]\tOperators to be submit there views (acceptable relaxation value, options) with attached XLS\nPossible options for how to treat Low PSD items are listed as below.\nOption 1\t: Test with relaxation\nOption 2\t: Test without relaxation\nOption 3a\t: Don\u2019t test (Test requirement including relaxation to be captured in TS 38.521-2)\nOption 3b\t: Don\u2019t test (Test requirement not including relaxation to be captured in TS 38.521-2)\nOption 4\t: Don\u2019t test (TC to be removed from TS 38.521-2)\nLS from RAN4 (R4-1905100) was received with following RAN4 intention.\nRegarding regulatory items, testing even with relaxation is required.\nRAN4 would like to respectfully suggest re-evaluation of the current test method towards removal of relaxation due to testability limitations. Re-evaluation of alternative test methods are not precluded.\nRAN4 prefers that core requirements that ensure regulatory compliance be verified with no relaxation. RAN4 further advises that these regulatory-facing test cases have higher priority for resolution. \nRAN4 defers to RAN5 judgment, however, on relaxations needed during verification, to accommodate testability issues.\nSome contributions to estimate required relaxation (Relax_1) were treated.\nOff power, Rx Spurious, ACLR (absolute, relative), [SEM (FR2b)] are categorized as Low PSD.\nSEM (FR2a) is not categorized as Low PSD while SEM (FR2b) is TBD.\nDiscussions in MU session\nFrom perspective of operator, Option 4 (Don\u2019t test \/ To remove TC) can not be acceptable.\nOption 2 (Test without relaxation) is unrealistic for TCs which require much relaxation since MU becomes much larger.\nRelaxation can be acceptable even to regulatory items depended on value and TC.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":339800,"status":"noted","reservation_date":"2019-04-15 13:36:19","uploaded":"2019-04-15 13:37:57","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193383.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193384","title":"WF on MB relaxation","source":"NTT DOCOMO","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"[#21] Based on RAN4 LS (R5-192901), RAN5 applies MB relaxation into conformance test with following assumptions.\nMB relaxation value for each FR2 band are based on \u201cUE declaration\u201d.\n\u201cVerdict per band\u201d, which is same approach as legacy LTE.\nThis document captures how to implement MB relaxation into conformance test with aspects.\nUE declaration\nHow to get verdict\nSpecification structure\nMU, TT, Low PSD\nImpact on certification bodies\n[#22] Time plan\nPre meeting discussions\t: 1) Proposed approach to remaining issues, 2) Raise additional issues\n[RAN5#83]\t(May-2019)\t: CR implementation to reflect agreements in this WF\n[RAN5#84]\t(Aug-2019)\t: Completion target of MB relaxation\n[#31] Process of UE declaration\nUE manufacturers declare each MB relaxation value to satisfy core requirement.\nTest houses, labs implement declared value into TE by manual since there is no capability for this relaxation.\nTE concludes verdict considering implemented declared value.\nRemaining issues\nHow to declare MB relaxation value\nOne option is to use applicability spec TS 38.522.\nWhether declared value can be updated during UE development\nOption 1\t: UE declared value shall not be updated.\nOption 2\t: UE declared value can be modified during UE development period.\nAssumption\nNumber of Test point\t\t: 3 (1 env x 3 freq ranges x 1 ChBW x 1 SCS) according to Table 6.2.1.1.4.1-1\nFR2 bands supported by UE\t: Band n257, 258, 261 (MB relaxation ?MBP is 1.7 dB)\nUE declaration\t\t: 1.0 dB (n257), 0.7 dB (n258), 0.0 dB (n261)\n[#41] How to get Verdict\nWhether testing all FR2 bands at the same time is required?\n[#71] MU\nNo updates are needed for MB TCs. (MUMB = MUSB)\n[#72] TT\nNo updates are needed for MB TCs. (TTMB = TTSB)\nRemaining issues\nWhether SNR estimation to be done TC by TC.\nCurrent analysis is based on assumption that maximum MB relaxation value (e.g. 1.7 dB) is applied.\nTBD\nIs there any  impact on certification bodies by introducing MB relaxation with RAN4 assumptions?\nRemaining issues\nWhether RAN5 conclusions to be shared to GCF CAG, PTCRB by LS.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":339900,"status":"noted","reservation_date":"2019-04-15 13:36:19","uploaded":"2019-04-15 13:37:57","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193384.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193385","title":"LS on RAN4-RAN5 5G-NR RF pending issues after RAN5#5-5G-NR Adhoc","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"Response to:\tR4-1902713\nRelease:\tN\/A\nWork Item:\t5GS_NR_LTE-UEConTest\nRAN5 thanks RAN4 for LS after RAN4#90 (Feb-2019) about NR RF pending issues. During RAN5#5-5G-NR Adhoc (Apr-2019), RAN5 has updated remaining pending issues with attached document.\nIn order to complete RAN5 work related to these dependencies on time (RAN5#83, May-2019), it is highly beneficial that RAN4 5G-NR pending issues are completed during upcoming RAN4 meeting. Please refer the attached documents for dependencies in detail.\nActions: RAN5 asks RAN4 to take the above information into consideration and to complete corresponding items by RAN5#83 (May-2019) in order not to delay RAN5 NR work any more.","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":340000,"status":"approved","reservation_date":"2019-04-15 13:36:19","uploaded":"2019-04-15 13:37:57","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R4-1902713","lsto":"TSG WG RAN4","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193385.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193429","title":"Handling of Low PSD test cases in RAN5","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":29171,"status":"noted","reservation_date":"2019-04-15 13:37:18","uploaded":"2019-04-15 13:37:57","revisionof":"R5-192917","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193429.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193448","title":"Noc level for FR1 Demodulation tests","source":"Qualcomm Incorporated","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":344800,"status":"noted","reservation_date":"2019-04-15 13:37:38","uploaded":"2019-04-15 13:37:57","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2019-04-08_5G-NR_Adhoc_5\/Docs\/R5-193448.zip","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193472","title":"Test configuration table for EN-DC TRx tests with CCs > 2","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30621,"status":"noted","reservation_date":"2019-04-15 13:38:06","uploaded":null,"revisionof":"R5-193062","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193473","title":"Test points for Wideband Intermodulation for EN-DC including FR1 (3 CCs)","source":"Anritsu","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32281,"status":"noted","reservation_date":"2019-04-15 13:38:06","uploaded":null,"revisionof":"R5-193228","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193482","title":"FR1 TT for UL-MIMO (transmit power)","source":"NTT DOCOMO, INC.","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":30571,"status":"noted","reservation_date":"2019-04-15 13:38:16","uploaded":null,"revisionof":"R5-193057","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193483","title":"Discussion on TT and the impact on UE fail rate for EIRP CDF","source":"Ericsson, Telecom Italia, Orange","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":32621,"status":"noted","reservation_date":"2019-04-15 13:38:16","uploaded":null,"revisionof":"R5-193262","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193484","title":"Technical Analysis of FR2 Test Tolerance values for Spherical Coverage","source":"Apple Inc., Intel, Oppo, Xiaomi, MediaTek Inc., vivo","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31001,"status":"noted","reservation_date":"2019-04-15 13:38:16","uploaded":null,"revisionof":"R5-193100","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193486","title":"Discussion on FR1 SDR test case structure","source":"Qualcomm Korea","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":40,"ainumber":"4.1.16","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":31321,"status":"noted","reservation_date":"2019-04-15 13:38:18","uploaded":null,"revisionof":"R5-193132","revisedto":"","release":"","crspec":"38.521-4","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R5","meeting":"R5-ah-35450","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]