[{"name":"S2-1903049","title":"LS from TSG CT: LS on Handling of non-essential corrections (non-FASMO) CRs and non-backwards compatible CRs","source":"TSG CT","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"TSG CT plenary has discussed the handling of non-essential corrections (non-FASMO) CRs and non-backwards compatible CRs under the 5GS_Ph1 work item. 5GS Phase1 work is frozen since some time ago, and it is therefore necessary to have a stable release by not agreeing any non-essential corrections (non-FASMO), if possible. The stability of the work ensures time-to-market, interoperability testing and deployment on time as well as signals the robustness of the work developed by 3GPP externally. Finally, there is still a number of late introduced requirements into the frozen 5GS Phase1 work. TSG CT plenary would like to indicate that the CT WGs may not accept new stage 2 functionality to 5GS Phase1 if it is not backward compatible. Action: TSG CT Plenary asks SA, SA WG2, SA WG3, SA WG5 to take note of the fact that new late introduced requirements to 5GS Phase1 work may not be considered in the frozen release by CT WGs if the introduced functionality is not backwards compatible.","secretary_remarks":"Noted","agenda_item_sort_order":6,"ainumber":"4.1","ainame":"Common issues and Incoming LSs","tdoc_agenda_sort_order":10030,"status":"noted","reservation_date":"2019-03-29 08:08:04","uploaded":"2019-03-29 10:31:48","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, CT WG1, CT WG3, CT WG4, CT WG6, SA WG2, SA WG3, SA WG5","Cc":"","lsoriginalls":"CP-190218","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_132_XiAn\/Docs\/S2-1903049.zip","group":"S2","meeting":"S2-132","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1903083","title":"LS from TSG SA: LS on Information on MEC work on 5G","source":"TSG SA","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Information","abstract":"TSG SA thank ETSI ISG MEC for their LS on Information on MEC work on 5G. SA WG2 received the above LS (MEC(18)000529r1\/S2-1901415), and have asked TSG SA to review that LS and provide a response to ETSI ISG MEC. 3GPP has already specified a number of capabilities that enable edge computing in 5GS and has now initiated further work on edge computing in 3GPP networks, with approved study items in SA WG6 and SA WG2 (attached). In addition SA WG5 are progressing a study item on management aspects of edge computing (FS_MAN_EC). This work is captured in 3GPP TR 28.803. ETSI ISG MEC is requested to take this information into account, and ETSI ISG MEC member companies are invited to bring related inputs to the above mentioned 3GPP study items.","secretary_remarks":"Noted","agenda_item_sort_order":6,"ainumber":"4.1","ainame":"Common issues and Incoming LSs","tdoc_agenda_sort_order":10040,"status":"noted","reservation_date":"2019-03-29 08:08:04","uploaded":"2019-03-29 10:31:48","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI ISG MEC","Cc":"SA WG2, SA WG5, SA WG6","lsoriginalls":"SP-190251","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_132_XiAn\/Docs\/S2-1903083.zip","group":"S2","meeting":"S2-132","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1903085","title":"LS from TSG SA: Reply LS on D2D enabler for public safety communications in 5GS","source":"TSG SA","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Information","abstract":"TSG SA thanks SA WG6 about the LS on D2D enabler for public safety communications in 5GS. TSG SA would like to inform SA WG6 and RAN, that SA#83 approved SA WG2 study item on System enhancement for Proximity based Services in 5GS in SP-190186. The study item has target completion date June 2020 (i.e. is planned for rel.17). This study item contains objectives to support Public Safety Proximity services.","secretary_remarks":"Noted","agenda_item_sort_order":6,"ainumber":"4.1","ainame":"Common issues and Incoming LSs","tdoc_agenda_sort_order":10050,"status":"noted","reservation_date":"2019-03-29 08:08:04","uploaded":"2019-03-29 10:31:48","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG6, TSG RAN","Cc":"SA WG2","lsoriginalls":"SP-190260","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_132_XiAn\/Docs\/S2-1903085.zip","group":"S2","meeting":"S2-132","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]