[{"name":"SP-240575","title":"New WID: Study on AI\/ML E2E framework","source":"Deutsche Telekom, AT&T, BT, CAICT, CATT, China Mobile, CKH IOD UK LIMITED, DISH Network, ETRI, KDDI, KPN, KT corp., LG Uplus, MATRIXX Software, NEC, NTT DOCOMO, NVIDIA, Orange, Qualcomm, SK Telecom, Spark NZ, Telecom Italia, Telenor, Telstra, T Mobile USA, UScellular, Verizon, vivo, Vodafone)","contact":"Johannes Achter","contact-id":94365,"tdoctype":"SID new","for":"Approval","abstract":"Proposed new Plenary level Study Item on AI\/ML e2e framework","secretary_remarks":"Revised to SP-240950.","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10730,"status":"revised","reservation_date":"2024-06-03 13:28:25","uploaded":"2024-06-07 13:29:38","revisionof":"","revisedto":"SP-240950","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240575.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240612","title":"Presentation of TR 23.700-66 to TSG SA for approval","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"draft TR","for":"Approval","abstract":"Abstract of document: This Technical Report investigates and identifies potential enhancements on 5GS to improve energy efficiency and to support energy saving in the network, focusing on the following objectives: - Potential enhancement to support exposure of network energy related information. Whether and what information is exposed, how it is exposed (e.g., charging) and at what granularity, e.g., at RAN level, Core Network level, network slice level, UE level, PDU session level, and\/or QoS flow level. Whether and how renewable energy or carbon emission information for such granularities can be exposed by an MNO. - Potential enhancements for subscription and policy control to enable network energy savings as service criteria. - Potential enhancements to support network energy saving and efficiency, including 5GC(NFs) and NG-RAN interactions, analytics, etc. Impacts on the UE are not ruled out in the study. Changes since last presentation to TSG SA: This is the first presentation to TSG SA for information and approval (i.e. one-step approval). The TR is considered 100% complete Outstanding Issues: RAN dependent solutions require feedbacks from RAN WGs for normative work alignments. Contentious Issues: The decision on whether new functionality to collect and calculate and the energy related information to be exposed will be defined by SA WG2 or SA WG5 will need coordination in SA plenary","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":11620,"status":"noted","reservation_date":"2024-06-04 07:46:47","uploaded":"2024-06-10 12:41:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.700-66","crspecversion":"1.0.0","workitem":[{"winame":"FS_EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240612.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240718","title":"Way Forward for SA WG2 EnergySys","source":"Samsung, Lenovo, CATT, China Mobile, ETRI, Hisillicon, Huawei, Intel, InterDigital, KPN, KT Corp., LG Uplus, MediaTek, NEC, NTT DOCOMO, OPPO, ORANGE, Rakuten Mobile, SK Telecom, Toyota, Vivo, ZTE","contact":"Jicheol Lee","contact-id":87580,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward Proposal for SA2 EnergySys","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10800,"status":"noted","reservation_date":"2024-06-05 10:38:32","uploaded":"2024-06-11 09:10:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240718.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240719","title":"WID on Energy Efficiency and Energy Saving","source":"Samsung, Lenovo, CATT, China Mobile, ETRI, Hisilicon, Huawei, Intel, InterDigital, KPN, KT Corp., LG Uplus, MediaTek, NEC, NTT DOCOMO, OPPO, ORANGE, Rakuten Mobile, SK Telecom, Toyota, vivo, ZTE","contact":"Jicheol Lee","contact-id":87580,"tdoctype":"WID new","for":"Approval","abstract":"Justification: Energy consumption is a significant source of operations costs for Mobile Network Operators (MNOs) and depending on the energy generation mix that is used to power networks, it can also have impact on the environment. There has been increasing work in 3GPP on improving energy efficiency and energy saving. Some solutions studied how to optimize energy consumption by adapting the network itself, e.g. activating and deactivating parts of the network. Such change to the network topology and components of the network could be performed transparent to the network architecture in some cases, or it may have implications in other cases, e.g. reselection of the appropriate network functions. Stage 1 requirements for energy as a service criteria have been identified in Rel-19 EnergyServ by SA WG1. While the goal of energy efficiency is to reduce energy for the same services, the goal of energy usage control as service criteria will be to supervise services in an energy-aware manner, ensuring the services are offered as intended by service providers, network operators or subscribers, with energy constraints and no performance consequences. Several functional requirements have been identified that promise increased control over energy usage to achieve service objectives for mobile network operators, service providers and their customers in the SA WG1 Rel-19 EnergyServ. Examples of these functional requirements include the ability to control energy usage based on the operator policies such as 'energy credit limits' and 'maximum energy usage rate' applying to services provided for a UE or group of UEs. Also, 3GPP has already undertaken work in different working groups to provide recommendations on energy saving and introduce actual OAM or Radio Network enhancements to save energy. SA plenary has issued also a 3GPP-wide recommendation on considering Energy efficiency as an important design criterion for the technical solutions 3GPP defines in their specifications (see SP-211621). SA WG2 will also be required to investigates options for improved system behaviour targeting energy saving and energy efficiency. This work item is to complete the design of stage 2 solutions and document the normative specifications, based on the conclusions of the FS_EnergySys study.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10910,"status":"noted","reservation_date":"2024-06-05 10:53:13","uploaded":"2024-06-11 09:10:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240719.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240731","title":"Considerations of E2E AIML Framework","source":"OPPO","contact":"Tricci So","contact-id":90593,"tdoctype":"discussion","for":"Endorsement","abstract":"Proposal to present the basic considerations when proposing the study of the E2E AI\/ML framework. After thorough considerations and analysis. There are many aspects that need to be clarified before further discussions on the objectives of the SID.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10750,"status":"noted","reservation_date":"2024-06-06 08:00:24","uploaded":"2024-06-10 15:15:52","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240731.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240775","title":"On AI\/ML Model LCM","source":"MediaTek Inc.","contact":"Mehrdad Shariat","contact-id":97826,"tdoctype":"discussion","for":"Discussion","abstract":"This contribution discusses life-cycle management for AI\/ML models.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10760,"status":"noted","reservation_date":"2024-06-06 16:04:52","uploaded":"2024-06-11 16:21:27","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240775.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240864","title":"Samsung views on E2E AI\/ML FWK","source":"Samsung","contact":"Suresh Chitturi","contact-id":61003,"tdoctype":"discussion","for":"Discussion","abstract":"This contribution discusses life-cycle management for AI\/ML models, including the ongoing work in SA WGs, and raises aspects that need to be considered in scoping the potential SA-level SID.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10770,"status":"noted","reservation_date":"2024-06-11 03:50:17","uploaded":"2024-06-11 17:45:25","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240864.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240872","title":"Summary on E2E AIML Framework in SA WG2","source":"vivo","contact":"Xiaobo Wu","contact-id":104426,"tdoctype":"discussion","for":"Information","abstract":"Summary on E2E AIML Framework in SA2","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10780,"status":"noted","reservation_date":"2024-06-11 08:13:56","uploaded":"2024-06-12 10:39:49","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240872.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240890","title":"Work split between SA WG2 and SA WG5 for the Energy Efficiency topic","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"discussion","for":"Approval","abstract":"This contribution proposes a methodology in order to determine the work split between SA WG2 and SA WG5 for FS_EnergySys for Rel-19","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10810,"status":"noted","reservation_date":"2024-06-11 10:10:10","uploaded":"2024-06-11 19:06:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240890.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240899","title":"Discussion on Working Scope Separation for Energy as Service Criteria between SA WG2 and SA WG5","source":"Lenovo, KDDI","contact":"Dimitrios Karampatsis","contact-id":70692,"tdoctype":"discussion","for":"Agreement","abstract":"This paper introduces a discussion related to the distinction of the working scope for the work on energy as service criteria between SA WG2 and SA WG5.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10820,"status":"noted","reservation_date":"2024-06-11 12:35:24","uploaded":"2024-06-11 19:11:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240899.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240900","title":"Input to the TSG SA level discussion on potential study on AI\/ML E2E framework","source":"NEC, Intel, CATT, Deutsche Telekom, Ericsson, Telecom Italia","contact":"Hassan Al-kanani","contact-id":47274,"tdoctype":"discussion","for":"Endorsement","abstract":"Input for TSG SA level discussion on potential study on AI\/ML E2E framework","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10790,"status":"revised","reservation_date":"2024-06-11 13:13:17","uploaded":"2024-06-11 21:55:04","revisionof":"","revisedto":"SP-240954","release":"Rel-19","crspec":"28.105","crspecversion":"","workitem":[{"winame":"AIML_MGT"},{"winame":" FS_AIML_MGT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240900.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240910","title":"New WID on Energy Efficiency and Energy Saving","source":"Nokia","contact":"Alessio Casati","contact-id":82456,"tdoctype":"WID new","for":"Approval","abstract":"This document proposes text changes to S2-2406584r03 which was considered but not approved during the email approval of SA WG2#163. It is input to the discussion in relationship to SP-240719.","secretary_remarks":"Related to SP-240719. Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":11050,"status":"noted","reservation_date":"2024-06-11 17:04:30","uploaded":"2024-06-11 17:18:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240910.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240918","title":"Analysis of Status of SA WG2 study FS_EnergySys & Proposed Way Forward","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"Analysis of the current status including work needed further and proposal to not approve the TR 13.700-66.","secretary_remarks":"Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10830,"status":"noted","reservation_date":"2024-06-11 21:25:04","uploaded":"2024-06-11 22:37:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240918.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240950","title":"New WID: Study on AI\/ML E2E framework","source":"Deutsche Telekom, AT&T, BT, CAICT, CATT, China Mobile, CKH IOD UK LIMITED, DISH Network, ETRI, KDDI, KPN, KT corp., LG Uplus, MATRIXX Software, NEC, NTT DOCOMO, NVIDIA, Orange, Qualcomm, SK Telecom, Spark NZ, Telecom Italia, Telenor, Telstra, T Mobile USA, UScellular, Verizon, vivo, Vodafone)","contact":"Johannes Achter","contact-id":94365,"tdoctype":"SID new","for":"Approval","abstract":"Proposed new Plenary level Study Item on AI\/ML e2e framework","secretary_remarks":"Revision of SP-240575","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10740,"status":"revised","reservation_date":"2024-06-18 10:25:03","uploaded":"2024-06-21 00:31:16","revisionof":"SP-240575","revisedto":"SP-240970","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240950.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240951","title":"Way Forward for SA WG2 EnergySys","source":"TSG SA","contact":"Jicheol Lee","contact-id":87580,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward Proposal for SA2 EnergySys","secretary_remarks":"Created at meeting.","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":10840,"status":"revised","reservation_date":"2024-06-18 10:25:03","uploaded":"2024-06-21 00:31:16","revisionof":"","revisedto":"SP-240972","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240951.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240954","title":"Input to the TSG SA level discussion on potential study on AI\/ML E2E framework","source":"NEC, Intel, CATT, Deutsche Telekom, Ericsson, Telecom Italia","contact":"Maurice Pope","contact-id":648,"tdoctype":"discussion","for":"Endorsement","abstract":"Input for TSG SA level discussion on potential study on AI\/ML E2E framework","secretary_remarks":"Revision of SP-240900. Noted","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":11064,"status":"noted","reservation_date":"2024-06-21 09:37:57","uploaded":"2024-06-21 09:41:17","revisionof":"SP-240900","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240954.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240970","title":"New WID: Study on AI\/ML E2E framework","source":"Deutsche Telekom, AT&T, BT, CAICT, CATT, China Mobile, CKH IOD UK LIMITED, DISH Network, ETRI, KDDI, KPN, KT corp., LG Uplus, MATRIXX Software, NEC, NTT DOCOMO, NVIDIA, Orange, Qualcomm, SK Telecom, Spark NZ, Telecom Italia, Telenor, Telstra, T Mobile USA, UScellular, Verizon, vivo, Vodafone)","contact":"Maurice Pope","contact-id":648,"tdoctype":"SID new","for":"Approval","abstract":"Proposed new Plenary level Study Item on AI\/ML e2e framework","secretary_remarks":"Revision of SP-240950. Approved","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":11094,"status":"approved","reservation_date":"2024-06-21 09:37:59","uploaded":"2024-06-21 09:41:17","revisionof":"SP-240950","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240970.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-240972","title":"Way Forward for SA WG2 EnergySys","source":"TSG SA","contact":"Maurice Pope","contact-id":648,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward Proposal for SA2 EnergySys","secretary_remarks":"Revision of SP-240951. Endorsed","agenda_item_sort_order":14,"ainumber":"3.3","ainame":"Issues highlighted for early treatment in Rel-19 or later","tdoc_agenda_sort_order":11098,"status":"endorsed","reservation_date":"2024-06-21 09:37:59","uploaded":"2024-06-21 09:41:17","revisionof":"SP-240951","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_104_Shanghai_2024-06\/Docs\/SP-240972.zip","group":"SP","meeting":"SP-104","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]