[{"name":"S2-2506321","title":"[WT#2, Interworking with 5GS] Principles for Interworking with 5GS","source":"InterDigital Inc.","contact":"Michael Starsinic","contact-id":72107,"tdoctype":"pCR","for":"Approval","abstract":"This p-CR propose add some details on what can be studied for interworking with 5GS: How to minimize the use of combined network nodes and how to deal with the case where a UE is associated with a 6G Service and moves to the 5G network.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25000,"status":"not treated","reservation_date":"2025-11-08 14:22:19","uploaded":"2025-08-15 19:17:21","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506321.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506421","title":"[WT#2] Migration and Interworking","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes WT update and Key Issue description for WT#2 in TR 23.801 for SA WG2 6G Study.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25010,"status":"not treated","reservation_date":"2025-08-13 01:59:25","uploaded":"2025-08-15 10:43:44","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506421.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506444","title":"[WT#2, 3GPP access Interworking] Study of 3GPP access interworking","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Revised in drafting session to S2-2507896.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25020,"status":"revised","reservation_date":"2025-08-13 07:41:29","uploaded":"2025-08-15 08:28:17","revisionof":"","revisedto":"S2-2507896","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506444.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506525","title":"[WT#2] Interworking and migration in 6G","source":"Ofinno","contact":"DongYeon Kim","contact-id":111210,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes the WT scope and introduces a new KI associated with WT#2 to support interworking and migration in 6G.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25050,"status":"not treated","reservation_date":"2025-08-13 18:45:41","uploaded":"2025-08-14 15:32:33","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506525.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506584","title":"[WT#2, Migration and Interworking] Scope and New Key Issue for migration and interworking","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25060,"status":"not treated","reservation_date":"2025-08-14 01:13:33","uploaded":"2025-08-15 12:27:39","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506584.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506642","title":"[WT#2, migration and interworking] migration and interworking","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25070,"status":"not treated","reservation_date":"2025-08-14 06:29:40","uploaded":"2025-08-15 17:57:19","revisionof":"","revisedto":"S2-2508354","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506642.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506649","title":"[WT#2] 6G Migration Paths","source":"Samsung, AT&T","contact":"Sang-Jun Moon","contact-id":30993,"tdoctype":"pCR","for":"Approval","abstract":"This contribution lists all possible 6G migration paths and considers feasible paths.","secretary_remarks":"Revised to S2-2507447","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25200,"status":"revised","reservation_date":"2025-08-14 07:05:03","uploaded":"2025-08-15 13:01:47","revisionof":"","revisedto":"S2-2507447","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506649.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506762","title":"[WT#2] Discussion and proposal for Interworking and Migration","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"pCR","for":"Approval","abstract":"This paper discusses the detailed scope for WT#2, specifically for interworking and migration with TN case. Based on the discussion, a detailed key issues is proposed.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25080,"status":"not treated","reservation_date":"2025-08-14 11:25:15","uploaded":"2025-08-15 12:03:25","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506762.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506809","title":"[WT#2, Migration and Interworking] Study items for migration and interworking","source":"NTT DOCOMO","contact":"Haruhi Echigo","contact-id":88497,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes scope and key issues of the WT#2: Study migration and interworking of the 6G SID.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25090,"status":"not treated","reservation_date":"2025-08-14 13:08:59","uploaded":"2025-08-14 13:11:39","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506809.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506875","title":"[WT#2] Migration and Interworking","source":"Apple","contact":"Ralf Rossbach","contact-id":85308,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides technical reasoning, gap and impact analysis behind WT#2 for Migration and Interworking and updates to the scoping of the WT. Additionally, the contribution proposes corresponding initial KI description in topic areas where WT#2","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25100,"status":"not treated","reservation_date":"2025-08-14 16:32:06","uploaded":"2025-08-15 22:29:52","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506875.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506928","title":"[WT#2, Migration and Interworking] Support for migration and interworking","source":"China Telecom","contact":"Zhuoyi Chen","contact-id":87689,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25110,"status":"not treated","reservation_date":"2025-08-15 01:41:22","uploaded":"2025-08-15 08:47:09","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506928.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506994","title":"[WT#2, Interworking and Migration] Inter-System interworking and migration consideration","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This paper discusses the interworking and migration aspect of 6G system. It proposes the related architecture assumption and requirement. Then the related KI are also proposed.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25120,"status":"not treated","reservation_date":"2025-08-15 04:40:20","uploaded":"2025-08-15 12:43:55","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506994.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507194","title":"WT#2, Migration and Interworking, and study proposal","source":"CATT","contact":"Chunshan Xiong","contact-id":94840,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25130,"status":"not treated","reservation_date":"2025-08-15 09:42:20","uploaded":"2025-08-15 14:28:33","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507194.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507230","title":"[WT#2, Migration and interworking] Key Issues for Migration and Interworking","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Revised in drafting session to S2-2507897.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25140,"status":"revised","reservation_date":"2025-08-15 11:00:28","uploaded":"2025-08-15 15:14:41","revisionof":"","revisedto":"S2-2507897","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507230.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507375","title":"[WT#2] Justification: of work task scope for interworking","source":"Nokia, T-Mobile US","contact":"Lazaros Gkatzikis","contact-id":107626,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25180,"status":"not treated","reservation_date":"2025-08-15 16:23:30","uploaded":"2025-08-15 16:45:43","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507375.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507399","title":"[WT#2] Update to WT#2 and new Key issue to clarify migration options for multi-RAT connectivity.","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":84607,"tdoctype":"pCR","for":"Approval","abstract":"This contribution elaborates on the need to study migration options in the CN for multi-RAT connectivity.","secretary_remarks":"Not Handled","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25190,"status":"not treated","reservation_date":"2025-08-15 17:02:58","uploaded":"2025-08-15 18:01:34","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507399.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507447","title":"[WT#2] 6G Migration Paths","source":"Samsung, AT&T","contact":"Sang-Jun Moon","contact-id":30993,"tdoctype":"pCR","for":"Approval","abstract":"This contribution lists all possible 6G migration paths and considers feasible paths.","secretary_remarks":"Revision of S2-2506649. Postponed in parallel session.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25210,"status":"postponed","reservation_date":"2025-08-15 22:24:52","uploaded":"2025-08-15 22:28:40","revisionof":"S2-2506649","revisedto":"S2-2508796","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507447.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507896","title":"[WT#2, 3GPP access Interworking KI part] Study of 3GPP access interworking.","source":"MediaTek Inc. (pen holder)","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"This contribution covers proposals of Key Issues for WT 2.","secretary_remarks":"Revision of S2-2506444. Revised in parallel session to S2-2507982.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25030,"status":"revised","reservation_date":"2025-08-28 10:38:47","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2506444","revisedto":"S2-2507982, S2-2508806","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507896.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507897","title":"[WT#2, Migration and Interworking WT scope] Work Task Scope of Migration and Interworking .","source":"Xiaomi (pen holder)","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"pCR","for":"Approval","abstract":"This contribution summarizes the work task scope from all contributions for WT#2.","secretary_remarks":"Revision of S2-2507230. Revised in parallel session to S2-2507981.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25150,"status":"revised","reservation_date":"2025-08-28 10:38:47","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2507230","revisedto":"S2-2507981","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507897.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507981","title":"[WT#2, Migration and Interworking WT scope] Work Task Scope of Migration and Interworking .","source":"Xiaomi (pen holder), OPPO(?), MediaTek Inc(?), Ofinno(?), LG Electronics(?), vivo(?), Samsung(?), ZTE(?), NTT DOCOMO(?), Apple(?), China Telecom, Huawei(?), HiSilicon(?), CATT(?), Nokia(?), T-Mobile US(?), Qualcomm(?), AT&T(?), InterDigital Inc(?)","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"pCR","for":"Approval","abstract":"This contribution summarizes the work task scope from all contributions for WT#2.","secretary_remarks":"Revision of S2-2507897. Revised to S2-2508129.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25160,"status":"revised","reservation_date":"2025-08-28 10:39:28","uploaded":"2025-09-01 14:21:10","revisionof":"S2-2507897","revisedto":"S2-2508129","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507981.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507982","title":"[WT#2, 3GPP access Interworking KI part] Study of 3GPP access interworking.","source":"MediaTek Inc. (pen holder)","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"This contribution covers proposals of Key Issues for WT 2.","secretary_remarks":"Revision of S2-2507896. Noted","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25040,"status":"noted","reservation_date":"2025-08-28 10:39:28","uploaded":"2025-09-01 14:21:10","revisionof":"S2-2507896","revisedto":"","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507982.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2508129","title":"[WT#2, Migration and Interworking WT scope] Work Task Scope of Migration and Interworking .","source":"Xiaomi (pen holder), OPPO(?), MediaTek Inc(?), Ofinno(?), LG Electronics(?), vivo(?), Samsung(?), ZTE(?), NTT DOCOMO(?), Apple(?), China Telecom, Huawei(?), HiSilicon(?), CATT(?), Nokia(?), T-Mobile US(?), Qualcomm(?), AT&T(?), InterDigital Inc(?)","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"pCR","for":"Approval","abstract":"This contribution summarizes the work task scope from all contributions for WT#2.","secretary_remarks":"Revision of S2-2507981. This was postponed.","agenda_item_sort_order":159,"ainumber":"20.6.2","ainame":"Study on Architecture for 6G System (FS_6G_ARC) - WT#2","tdoc_agenda_sort_order":25170,"status":"postponed","reservation_date":"2025-08-30 06:07:37","uploaded":"2025-09-01 14:21:10","revisionof":"S2-2507981","revisedto":"S2-2508473, S2-2508555, S2-2508899, S2-2508946, S2-2509159, S2-2509210","release":"Rel-20","crspec":"23.801-01","crspecversion":"0.0.0","workitem":[{"winame":"FS_6G_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2508129.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]