[{"name":"S2-2600030","title":"LS from RAN WG2: LS on Voice over NB-IoT NTN","source":"RAN WG2","contact":"Xiaodong Yang","contact-id":70365,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 has further discussed Voice over NB-IoT NTN in R20, and the following agreements have benn reached: 1. From RAN WG2 perspective UP solution (i.e., via DRB) is recommended for both IMS signalling and voice packet transmission over NB-IoT via GSO. 2. RAN WG2 understands that whether\/How to further down-select between UP non-IP and UP IP for voice packet is up to SA WG2. 3. RAN WG2 continues to assume that a UE can use only one solution (CP based or UP based) at a time. Action: RAN WG2 respectfully asks RAN, SA WG2, SA WG4, and CT WG1 to take the above information into consideration.","secretary_remarks":"Postponed","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13200,"status":"postponed","reservation_date":"2026-01-14 14:27:34","uploaded":"2026-01-20 15:56:29","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN, SA WG2, SA WG4, CT WG1","Cc":"","lsoriginalls":"R2-2509213","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600030.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600040","title":"LS from SA WG1: Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC","source":"SA WG1","contact":"Francesco Pica","contact-id":57089,"tdoctype":"LS in","for":"Action","abstract":"SA WG1 thanks sa2 for their LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC, and the question addressed to SA WG1: Question 11 (To SA WG1): Can SA WG1 confirm, whether support for more than one IMS voice calls and support for DTMF is required for IMS voice over NB-IoT NTN? SA WG1's view is that - support for more than one (simultaneous) IMS voice call is not required in this Release. - support for Dual-Tone Multi-Frequency (DTMF) is required. The above is clarified in the attached CR. Action: Take the above into account.","secretary_remarks":"Postponed","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13530,"status":"postponed","reservation_date":"2026-01-14 14:27:34","uploaded":"2026-01-20 15:56:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG2, SA WG4, CT WG1, SA WG3, RAN WG1","lsoriginalls":"S1-254508","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600040.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600270","title":"KI#1: Concluusion: negotation of Non-IP mechanism .","source":"MediaTek Inc, vivo.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusion for KI#1.","secretary_remarks":"Revised in parallel session to S2-2601185.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13310,"status":"revised","reservation_date":"2026-01-27 02:30:10","uploaded":"2026-01-27 10:34:56","revisionof":"","revisedto":"S2-2601185","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600270.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600382","title":"Interim conclusion for KI#2 IMS enhancement for GEO NB-IoT NTN access.","source":"IPLOOK","contact":"weizhi wu","contact-id":95677,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13770,"status":"not treated","reservation_date":"2026-01-27 09:32:51","uploaded":"2026-01-27 09:47:45","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600382.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600455","title":"Conclusion proposal for KI#1 and KI#2 on support of 'non-IP'.","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"pCR","for":"Approval","abstract":"Proposes conclusion proposals for KI#1 and KI#2 that can accommodate most prominent solution options for support of 'non-IP'.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13350,"status":"not treated","reservation_date":"2026-01-27 11:31:21","uploaded":"2026-01-30 18:34:29","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600455.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600456","title":"Conclusions for KI#3.","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"pCR","for":"Approval","abstract":"Proposes conclusions for KI#3 (support for IMS emergency calls).","secretary_remarks":"Revision of (Unhandled) S2-2510266. Revised in parallel session to S2-2601192.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13860,"status":"revised","reservation_date":"2026-01-27 11:32:55","uploaded":"2026-01-30 18:34:29","revisionof":"S2-2510266","revisedto":"S2-2601192","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.1.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600456.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600617","title":"Interim conclusion for KI#3 Support of IMS emergency call over NB-IoT NTN via GEO satellite connecting to EPC.","source":"IPLOOK","contact":"weizhi wu","contact-id":95677,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#3 of FS_5GSAT_Ph4_ARC regarding Support of IMS emergency call over NB-IoT NTN via GEO satellite connecting to EPC.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13890,"status":"not treated","reservation_date":"2026-01-28 03:11:47","uploaded":"2026-01-28 03:21:16","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600617.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600633","title":"[KI#1 Conclusion] Dedicated Bearer Support.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"Updated conclusions to clarify aspects about the EPS Bearers","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13480,"status":"noted","reservation_date":"2026-01-28 16:40:59","uploaded":"2026-01-30 15:44:36","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600633.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600634","title":"Dedicated bearer establishment for IMS Voice calls","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Information","abstract":"Summary of change: Describe the overall feature, as part of the introduction to IMS Voice over NB-IoT(GEO). Describe the MME behaviour when receiving the RRC establishment cause.","secretary_remarks":"For information?. Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13630,"status":"not treated","reservation_date":"2026-01-28 16:40:59","uploaded":"2026-01-30 15:44:36","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.401","crspecversion":"19.5.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":3955.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600634.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.x, 5.3.4.1, 5.4.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600635","title":"Conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Revised in parallel session to S2-2601190.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13720,"status":"revised","reservation_date":"2026-01-28 16:40:59","uploaded":"2026-01-30 15:44:36","revisionof":"","revisedto":"S2-2601190","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600635.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600636","title":"Conclusion for KI#3 and KI#4 for emergency calls over NB-IoT NTN.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"Conclusion for KI#3 and KI#4 for emergency calls over NB-IoT NTN.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13900,"status":"not treated","reservation_date":"2026-01-28 16:40:59","uploaded":"2026-01-30 15:44:36","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600636.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600637","title":"Conclusion for KI#5 UE-satellite-UE communication for non-IMS service.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"Conclusion of KI#5 UE-satellite-UE communication for non-IMS service.","secretary_remarks":"Revision of (Unhandled) S2-2510565. Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":14010,"status":"not treated","reservation_date":"2026-01-28 16:40:59","uploaded":"2026-01-30 15:44:36","revisionof":"S2-2510565","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600637.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600642","title":"[DRAFT] LS with questions on IMS voice over NB-IoT NTN","source":"Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"LS with questions IMS emergency over NB-IoT NTN","secretary_remarks":"Revised in parallel session to S2-2601187.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13210,"status":"revised","reservation_date":"2026-01-28 20:08:18","uploaded":"2026-01-30 18:34:29","revisionof":"","revisedto":"S2-2601187","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG1, RAN WG2, RAN WG3","Cc":"CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600642.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600643","title":"[DRAFT] LS out to GSMA on use of IMS APN for support of IMS voice over NB-IoT via GEO satellite connecting to EPC","source":"Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"LS out to GSMA on use of IMS APN for support of IMS voice over NB-IoT via GEO satellite connecting to EPC","secretary_remarks":"Revised in parallel session to S2-2601243 (withdrawn). Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13840,"status":"revised","reservation_date":"2026-01-28 20:10:52","uploaded":"2026-01-30 18:34:29","revisionof":"","revisedto":"S2-2601243","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA Networks Roaming Group","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600643.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600684","title":"KI#2: Evaluation and conclusions.","source":"Qualcomm Incorporated","contact":"Kefeng Zhang","contact-id":103832,"tdoctype":"pCR","for":"Approval","abstract":"Evaluation and conclusions on KI#2: IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Revision of (Unhandled) S2-2510404. Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13700,"status":"not treated","reservation_date":"2026-01-29 05:39:00","uploaded":"2026-01-30 07:51:18","revisionof":"S2-2510404","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.1.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600684.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600686","title":"KI#4: Conclusions.","source":"Qualcomm Incorporated","contact":"Kefeng Zhang","contact-id":103832,"tdoctype":"pCR","for":"Approval","abstract":"Conclusions on KI#4: Location service for IMS emergency call and regulatory services over NB-IoT NTN.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13960,"status":"not treated","reservation_date":"2026-01-29 05:45:45","uploaded":"2026-01-30 07:51:18","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600686.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600720","title":"Conclusion on IMS signaling transport for GEO NB-IoT NTN access.","source":"Vivo, China Mobile, MediaTek Inc., Qualcomm Incorporated, China Unicom, China Telecom, CATT, Ericsson, Samsung, OPPO, Xiaomi, Spreadtrum, SHARP","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion on IMS signaling transport for GEO NB-IoT NTN access.","secretary_remarks":"Revised in parallel session to S2-2601188.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13260,"status":"revised","reservation_date":"2026-01-29 10:30:06","uploaded":"2026-01-30 10:39:16","revisionof":"","revisedto":"S2-2601188","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600720.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600721","title":"KI#1_Delete ENs in interim conclusion of KI#1.","source":"Vivo, MediaTek Inc.","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to delete 2 ENs in interim conclusion of KI#1.","secretary_remarks":"Revised in parallel session to S2-2601240.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13550,"status":"revised","reservation_date":"2026-01-29 10:30:06","uploaded":"2026-01-30 10:39:16","revisionof":"","revisedto":"S2-2601240","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600721.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600722","title":"KI#1_Update conclusions.","source":"Vivo","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to update conclusion of KI#1.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13430,"status":"not treated","reservation_date":"2026-01-29 10:30:06","uploaded":"2026-01-30 10:39:16","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600722.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600734","title":"Conclusion on KI#1 for voice bearer pre-establishment.","source":"Vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides conclusion of KI#1 IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13470,"status":"not treated","reservation_date":"2026-01-29 13:43:56","uploaded":"2026-01-30 14:03:05","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600734.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600735","title":"Conclusions for KI#2.","source":"Vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13710,"status":"not treated","reservation_date":"2026-01-29 13:46:14","uploaded":"2026-01-30 14:03:05","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600735.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600755","title":"KI#1 conclusion update: non-IP and new-RTP negotiation.","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion for KI#1 in TR 23.700-19, v1.2.0 regarding how to negotiate the use of non-IP between UE and EPC and how to negotiate the use of new RTP between UE and IMS.","secretary_remarks":"Merged into S2-2601448","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13360,"status":"merged","reservation_date":"2026-01-29 15:59:56","uploaded":"2026-01-30 21:01:17","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600755.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600756","title":"KI#1 conclusion update: mobility between NB-IoT(GEO) and WB-EUTRAN.","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion for KI#1 in TR 23.700-19, v1.2.0, to conclude that MME disconnects IMS PDN connection when idle mode mobility between NB-IoT (GEO) and WB-EUTRAN.","secretary_remarks":"Revised in parallel session to S2-2601208.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13500,"status":"revised","reservation_date":"2026-01-29 16:00:16","uploaded":"2026-01-30 21:01:17","revisionof":"","revisedto":"S2-2601208","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600756.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600757","title":"KI#4 conclusion: Reuse Geolocation in SIP INVITE for PSAP selection.","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#4 in TR 23.700-19, v1.2.0.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13970,"status":"not treated","reservation_date":"2026-01-29 16:00:16","uploaded":"2026-01-30 21:01:17","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600757.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600758","title":"KI#1 conclusion on QoS for NB-IoT (GEO).","source":"Ericsson, T-Mobile USA, Vodafone","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution discusses what QCI is to be used for IMS voice and proposes a conclusion.","secretary_remarks":"Revised in parallel session to S2-2601186.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13400,"status":"revised","reservation_date":"2026-01-29 16:00:16","uploaded":"2026-01-30 21:01:17","revisionof":"","revisedto":"S2-2601186","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600758.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600789","title":"Interim Conclusion for KI#2.","source":"Skylo Technologies, ViaSat, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Revision of (Postponed) S2-2510964. Revised in parallel session to S2-2601189.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13650,"status":"revised","reservation_date":"2026-01-29 21:25:11","uploaded":"2026-01-30 23:10:02","revisionof":"S2-2510964","revisedto":"S2-2601189","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600789.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600791","title":"Discussion on non-IP delivery of binary-encoded signaling.","source":"Skylo Technologies, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"discussion","for":"Decision","abstract":"This paper discusses non-IP delivery of binary-encoded signalling","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13640,"status":"not treated","reservation_date":"2026-01-29 21:28:38","uploaded":"2026-01-30 23:09:53","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600791.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600797","title":"Conclusion for KI#3 Support of IMS emergency call over NB-IoT NTN via GEO satellite connecting to EPC.","source":"China Mobile","contact":"Hanbai Wang","contact-id":102986,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#3 of FS_5GSAT_Ph4_ARC.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13910,"status":"not treated","reservation_date":"2026-01-30 01:37:24","uploaded":"2026-01-30 07:20:26","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600797.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600798","title":"Conclusion for KI#4 Support of IMS emergency call over NB-IoT NTN via GEO satellite connecting to EPC.","source":"China Mobile","contact":"Hanbai Wang","contact-id":102986,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#4 of FS_5GSAT_Ph4_ARC.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13980,"status":"not treated","reservation_date":"2026-01-30 01:39:02","uploaded":"2026-01-30 07:20:26","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600798.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600808","title":"KI#1: Conclusion Update to resolve ENs based on SA WG1 requirement.","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes conclusion update for KI#1 in TR 23.700-19.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13540,"status":"not treated","reservation_date":"2026-01-30 02:19:21","uploaded":"2026-01-30 11:16:28","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600808.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600809","title":"KI#1: Conclusion update for Non-IP Negotiation and RoHC disable.","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes conclusion update for KI#1 in TR 23.700-19.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13370,"status":"not treated","reservation_date":"2026-01-30 02:21:03","uploaded":"2026-01-30 11:16:28","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600809.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600810","title":"KI#2_ conclusions for roaming.","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to conclude the GEO voice roaming issues.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13800,"status":"not treated","reservation_date":"2026-01-30 02:41:31","uploaded":"2026-01-30 15:38:32","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600810.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600818","title":"Conclusions for Key Issue #2: IMS enhancement for GEO NB-IoT NTN access.","source":"OPPO","contact":"Yang Xu","contact-id":74478,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposed conclusions for KI#2 regarding Procedure simplification and SIP message compression.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13760,"status":"not treated","reservation_date":"2026-01-30 04:06:21","uploaded":"2026-01-30 04:07:36","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600818.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600841","title":"Conclusion KI#1 update on IMS signalling transport .","source":"Samsung","contact":"Youngkyo Baek","contact-id":46395,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion on IMS signalling transport for GEO NB-IoT NTN access.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13290,"status":"not treated","reservation_date":"2026-01-30 06:57:45","uploaded":"2026-01-30 07:31:52","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600841.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600842","title":"KI#1: Conclusion: negotiation of 'non-IP' mechanism.","source":"Samsung","contact":"Youngkyo Baek","contact-id":46395,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes a conclusion for KI#1 negotation of 'non-IP' machanism.","secretary_remarks":"Revised to S2-2600874 (withdrawn). Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13380,"status":"not treated","reservation_date":"2026-01-30 07:01:41","uploaded":"2026-01-30 07:31:52","revisionof":"","revisedto":"S2-2600874","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600842.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600867","title":"Conclusion for KI#1 on UE Subscription.","source":"ZTE, vivo","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the UE subscription of voice over GEO.","secretary_remarks":"Revised in parallel session to S2-2601241.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13590,"status":"revised","reservation_date":"2026-01-30 07:09:42","uploaded":"2026-01-30 07:17:51","revisionof":"","revisedto":"S2-2601241","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600867.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600868","title":"Conclusion for KI#1 on IMS signaling packet transport mechanism.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the IMS signalling packet transport mechanism.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13300,"status":"not treated","reservation_date":"2026-01-30 07:09:42","uploaded":"2026-01-30 07:17:51","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600868.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600869","title":"Conclusion for KI#1 on dedicated bearer pre-establishment.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the pre-establishing dedicated bearer.","secretary_remarks":"Revised in parallel session to S2-2601239 (withdrawn). Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13450,"status":"revised","reservation_date":"2026-01-30 07:09:42","uploaded":"2026-01-30 07:17:51","revisionof":"","revisedto":"S2-2601239","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600869.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600870","title":"Interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding the IMS optimization.","secretary_remarks":"Revised in parallel session to S2-2601191.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13810,"status":"revised","reservation_date":"2026-01-30 07:09:42","uploaded":"2026-01-30 07:17:51","revisionof":"","revisedto":"S2-2601191","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600870.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600871","title":"Analysis on Pre-establishing Dedicated Bearer Options","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"discussion","for":"Discussion","abstract":"This DP compares different pre-establishment options and propose to choose category 1 as an optional enhancement.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13440,"status":"not treated","reservation_date":"2026-01-30 07:09:42","uploaded":"2026-01-30 07:17:51","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600871.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600918","title":"Solution #16 update to remove Editor s note and update flow for pre-defining SDP.","source":"MediaTek Inc.","contact":"Yu-Ching (Jin) Tung","contact-id":98927,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to update solution#16 to remove Editor s note.","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":14020,"status":"not treated","reservation_date":"2026-01-30 09:18:07","uploaded":"2026-01-30 09:22:59","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600918.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600919","title":"Interim conclusion for KI#2 IMS enhancement for GEO NB-IoT NTN access on pre-defining static SDP lines.","source":"MediaTek Inc.","contact":"Yu-Ching (Jin) Tung","contact-id":98927,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding IMS enhancement for GEO NB-IoT NTN access by pre-defining static SDP fields to avoid retransmission of repeated SDP.","secretary_remarks":"Revised in parallel session to S2-2601242.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13780,"status":"revised","reservation_date":"2026-01-30 09:20:02","uploaded":"2026-01-30 09:22:59","revisionof":"","revisedto":"S2-2601242","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600919.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600934","title":"Add conclusion for KI#4.","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"pCR","for":"Approval","abstract":"This pCR is proposed to add conclusion for KI#4.","secretary_remarks":"Revised in parallel session to S2-2601193.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13920,"status":"revised","reservation_date":"2026-01-30 09:56:19","uploaded":"2026-01-30 10:10:41","revisionof":"","revisedto":"S2-2601193","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600934.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2600958","title":"23.700-19: KI#1 Conclusion on Idle mode mobility between GEO and E-UTRAN.","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to make concludsion on Idle mode mobility between GEO and E-UTRAN","secretary_remarks":"Not Handled","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13490,"status":"not treated","reservation_date":"2026-01-30 10:14:18","uploaded":"2026-01-30 15:38:32","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2600958.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601072","title":"Proposed Conclusions on KI#5: UE-SAT-UE communication for non-IMS services.","source":"TNO, Novamint, Thales","contact":"Relja Djapic","contact-id":83525,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusions for KI#5.","secretary_remarks":"Revised in parallel session to S2-2601184.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13990,"status":"revised","reservation_date":"2026-01-30 14:26:26","uploaded":"2026-01-30 14:30:39","revisionof":"","revisedto":"S2-2601184","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601072.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601099","title":"[DRAFT] LS out to SA WG3 on security aspects for non-IP delivery of IMS signalling","source":"Skylo Technologies","contact":"Peng Tan","contact-id":109870,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13390,"status":"noted","reservation_date":"2026-01-30 18:24:34","uploaded":"2026-01-30 23:09:41","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601099.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601111","title":"Conclusion Principle For Key Issue #1 Related to Generic Parameter.","source":"T-Mobile USA","contact":"Christopher Joul","contact-id":31136,"tdoctype":"pCR","for":"Approval","abstract":"This document provides a conclusion principle for KI#1 suggesting that the parameter does not include the orbit.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13620,"status":"noted","reservation_date":"2026-01-30 19:36:53","uploaded":"2026-01-30 20:11:03","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601111.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601184","title":"Proposed Conclusions on KI#5: UE-SAT-UE communication for non-IMS services.","source":"TNO, Novamint, Thales","contact":"Relja Djapic","contact-id":83525,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusions for KI#5.","secretary_remarks":"Revision of S2-2601072. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":14000,"status":"approved","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2601072","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601184.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601185","title":"KI#1: Concluusion: negotation of Non-IP mechanism .","source":"MediaTek Inc, vivo.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusion for KI#1.","secretary_remarks":"Revision of S2-2600270. Revised in parallel session to S2-2601448, merging S2-2600755","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13320,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600270","revisedto":"S2-2601448","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601185.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601186","title":"KI#1 conclusion on QoS for NB-IoT (GEO).","source":"Ericsson, T-Mobile USA, Vodafone","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution discusses what QCI is to be used for IMS voice and proposes a conclusion.","secretary_remarks":"Revision of S2-2600758. Revised in parallel session to S2-2601450.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13410,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600758","revisedto":"S2-2601450","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601186.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601187","title":"[DRAFT] LS with questions on IMS voice over NB-IoT NTN","source":"Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"LS with questions IMS emergency over NB-IoT NTN","secretary_remarks":"Revision of S2-2600642. Revised in parallel session to S2-2601459.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13220,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600642","revisedto":"S2-2601459","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG1, RAN WG2, RAN WG3","Cc":"CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601187.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601188","title":"Conclusion on IMS signaling transport for GEO NB-IoT NTN access.","source":"Vivo, China Mobile, MediaTek Inc., Qualcomm Incorporated, China Unicom, China Telecom, CATT, Ericsson, Samsung, OPPO, Xiaomi, Spreadtrum, SHARP","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion on IMS signaling transport for GEO NB-IoT NTN access.","secretary_remarks":"Revision of S2-2600720. Revised in parallel session to S2-2601449.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13270,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600720","revisedto":"S2-2601449","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601188.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601189","title":"Interim Conclusion for KI#2.","source":"Skylo Technologies, ViaSat, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Revision of S2-2600789. Corrupt file. Revised in parallel session to S2-2601245.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13660,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600789","revisedto":"S2-2601245","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601189.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601190","title":"Conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Revision of S2-2600635. Revised in parallel session to S2-2601455, merging S2-2601242","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13730,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600635","revisedto":"S2-2601455","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601190.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601191","title":"Interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding the IMS optimization.","secretary_remarks":"Revision of S2-2600870. Revised in parallel session to S2-2601456.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13820,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600870","revisedto":"S2-2601456","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601191.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601192","title":"Conclusions for KI#3.","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"pCR","for":"Approval","abstract":"Proposes conclusions for KI#3 (support for IMS emergency calls).","secretary_remarks":"Revision of S2-2600456. Revised in parallel session to S2-2601457.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13870,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600456","revisedto":"S2-2601457","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.1.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601192.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601193","title":"Add conclusion for KI#4.","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"pCR","for":"Approval","abstract":"This pCR is proposed to add conclusion for KI#4.","secretary_remarks":"Revision of S2-2600934. Revised in parallel session to S2-2601458.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13930,"status":"revised","reservation_date":"2026-02-16 09:16:28","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600934","revisedto":"S2-2601458","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601193.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601208","title":"KI#1 conclusion update: mobility between NB-IoT(GEO) and WB-EUTRAN.","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion for KI#1 in TR 23.700-19, v1.2.0, to conclude that MME disconnects IMS PDN connection when idle mode mobility between NB-IoT (GEO) and WB-EUTRAN.","secretary_remarks":"Revision of S2-2600756. Revised in parallel session to S2-2601451.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13510,"status":"revised","reservation_date":"2026-02-16 09:16:36","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600756","revisedto":"S2-2601451","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601208.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601239","title":"Conclusion for KI#1 on dedicated bearer pre-establishment.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the pre-establishing dedicated bearer.","secretary_remarks":"Revision of S2-2600869. Withdrawn","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13460,"status":"withdrawn","reservation_date":"2026-02-16 09:16:49","uploaded":null,"revisionof":"S2-2600869","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601240","title":"KI#1_Delete ENs in interim conclusion of KI#1.","source":"Vivo, MediaTek Inc.","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to delete 2 ENs in interim conclusion of KI#1.","secretary_remarks":"Revision of S2-2600721. Revised in parallel session to S2-2601452.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13560,"status":"revised","reservation_date":"2026-02-16 09:16:49","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600721","revisedto":"S2-2601452","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601240.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601241","title":"Conclusion for KI#1 on UE Subscription.","source":"ZTE, vivo","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the UE subscription of voice over GEO.","secretary_remarks":"Revision of S2-2600867. Revised in parallel session to S2-2601453.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13600,"status":"revised","reservation_date":"2026-02-16 09:16:49","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600867","revisedto":"S2-2601453","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601241.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601242","title":"Interim conclusion for KI#2 IMS enhancement for GEO NB-IoT NTN access on pre-defining static SDP lines.","source":"MediaTek Inc.","contact":"Yu-Ching (Jin) Tung","contact-id":98927,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding IMS enhancement for GEO NB-IoT NTN access by pre-defining static SDP fields to avoid retransmission of repeated SDP.","secretary_remarks":"Revision of S2-2600919. Merged into S2-2601455","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13790,"status":"merged","reservation_date":"2026-02-16 09:16:49","uploaded":"2026-02-16 09:31:05","revisionof":"S2-2600919","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601242.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601243","title":"[DRAFT] LS out to GSMA on use of IMS APN for support of IMS voice over NB-IoT via GEO satellite connecting to EPC","source":"Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"LS out to GSMA on use of IMS APN for support of IMS voice over NB-IoT via GEO satellite connecting to EPC","secretary_remarks":"Revision of S2-2600643. Withdrawn","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13850,"status":"withdrawn","reservation_date":"2026-02-16 09:16:49","uploaded":null,"revisionof":"S2-2600643","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA Networks Roaming Group","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601244","title":"Outcome of show of hands on KI#1 and KI#2","source":"Session Chair","contact":"Maurice Pope","contact-id":648,"tdoctype":"discussion","for":"Discussion","abstract":"Outcome of show of hands on KI#1 and KI#2","secretary_remarks":"Created at meeting. Revised in parallel session to S2-2601247.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13240,"status":"revised","reservation_date":"2026-02-16 09:16:49","uploaded":"2026-02-16 09:31:06","revisionof":"","revisedto":"S2-2601247","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601244.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601245","title":"Interim Conclusion for KI#2.","source":"Skylo Technologies, ViaSat, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Revision of S2-2601189. Revised in parallel session to S2-2601454.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13670,"status":"revised","reservation_date":"2026-02-16 09:16:49","uploaded":"2026-02-16 09:31:06","revisionof":"S2-2601189","revisedto":"S2-2601454","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601245.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601247","title":"Outcome of show of hands on KI#1 and KI#2","source":"Session Chair","contact":"Maurice Pope","contact-id":648,"tdoctype":"discussion","for":"Discussion","abstract":"Outcome of show of hands on KI#1 and KI#2","secretary_remarks":"Revision of S2-2601244. Noted in parallel session","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13250,"status":"noted","reservation_date":"2026-02-16 09:16:50","uploaded":"2026-02-16 09:31:06","revisionof":"S2-2601244","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601247.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601448","title":"KI#1: Concluusion: negotation of Non-IP mechanism .","source":"MediaTek Inc, vivo.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusion for KI#1.","secretary_remarks":"Revision of S2-2601185, merging S2-2600755. Revised in parallel session to S2-2601474.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13330,"status":"revised","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601185","revisedto":"S2-2601474","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601448.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601449","title":"Conclusion on IMS signaling transport for GEO NB-IoT NTN access.","source":"Vivo, China Mobile, MediaTek Inc., Qualcomm Incorporated, China Unicom, China Telecom, CATT, Ericsson, Samsung, OPPO, Xiaomi, Spreadtrum, SHARP","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion on IMS signaling transport for GEO NB-IoT NTN access.","secretary_remarks":"Revision of S2-2601188. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13280,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601188","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601449.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601450","title":"KI#1 conclusion on QoS for NB-IoT (GEO).","source":"Ericsson, T-Mobile USA, Vodafone","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution discusses what QCI is to be used for IMS voice and proposes a conclusion.","secretary_remarks":"Revision of S2-2601186. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13420,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601186","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601450.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601451","title":"KI#1 conclusion update: mobility between NB-IoT(GEO) and WB-EUTRAN.","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an updated conclusion for KI#1 in TR 23.700-19, v1.2.0, to conclude that MME disconnects IMS PDN connection when idle mode mobility between NB-IoT (GEO) and WB-EUTRAN.","secretary_remarks":"Revision of S2-2601208. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13520,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601208","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601451.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601452","title":"KI#1_Delete ENs in interim conclusion of KI#1.","source":"Vivo, MediaTek Inc.","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to delete 2 ENs in interim conclusion of KI#1.","secretary_remarks":"Revision of S2-2601240. Revised in parallel session to S2-2601475.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13570,"status":"revised","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601240","revisedto":"S2-2601475","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601452.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601453","title":"Conclusion for KI#1 on UE Subscription.","source":"ZTE, vivo","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a conclusion for KI#1 of FS_5GSAT_Ph4_ARC regarding the UE subscription of voice over GEO.","secretary_remarks":"Revision of S2-2601241. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13610,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601241","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601453.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601454","title":"Interim Conclusion for KI#2.","source":"Skylo Technologies, ViaSat, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Revision of S2-2601245. Revised in parallel session to S2-2601476.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13680,"status":"revised","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601245","revisedto":"S2-2601476","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601454.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601455","title":"Conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Revision of S2-2601190, merging S2-2601242. Revised in parallel session to S2-2601477.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13740,"status":"revised","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601190","revisedto":"S2-2601477","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601455.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601456","title":"Interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC.","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes an interim conclusion for KI#2 of FS_5GSAT_Ph4_ARC regarding the IMS optimization.","secretary_remarks":"Revision of S2-2601191. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13830,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601191","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601456.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601457","title":"Conclusions for KI#3.","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"pCR","for":"Approval","abstract":"Proposes conclusions for KI#3 (support for IMS emergency calls).","secretary_remarks":"Revision of S2-2601192. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13880,"status":"approved","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601192","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.1.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601457.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601458","title":"Add conclusion for KI#4.","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"pCR","for":"Approval","abstract":"This pCR is proposed to add conclusion for KI#4.","secretary_remarks":"Revision of S2-2601193. Revised in parallel session to S2-2601478.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13940,"status":"revised","reservation_date":"2026-02-16 09:18:26","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601193","revisedto":"S2-2601478","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601458.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601459","title":"LS with questions on IMS voice over NB-IoT NTN","source":"SA WG2","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG1, RAN WG2. CC: CT WG1, SA WG4, RAN WG3.","secretary_remarks":"Revision of S2-2601187. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13230,"status":"approved","reservation_date":"2026-02-16 09:18:27","uploaded":"2026-02-16 09:31:07","revisionof":"S2-2601187","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG1, RAN WG2","Cc":"CT WG1, SA WG4, RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601459.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601474","title":"KI#1: Concluusion: negotation of Non-IP mechanism .","source":"MediaTek Inc, vivo.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes conclusion for KI#1.","secretary_remarks":"Revision of S2-2601448. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13340,"status":"approved","reservation_date":"2026-02-16 09:18:32","uploaded":"2026-02-16 09:41:04","revisionof":"S2-2601448","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601474.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601475","title":"KI#1_Delete ENs in interim conclusion of KI#1.","source":"Vivo, MediaTek Inc.","contact":"Lin Shu","contact-id":110681,"tdoctype":"pCR","for":"Approval","abstract":"The contribution proposes to delete 2 ENs in interim conclusion of KI#1.","secretary_remarks":"Revision of S2-2601452. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13580,"status":"approved","reservation_date":"2026-02-16 09:18:32","uploaded":"2026-02-16 09:41:04","revisionof":"S2-2601452","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601475.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601476","title":"Interim Conclusion for KI#2.","source":"Skylo Technologies, ViaSat, Boost Mobile Network, EchoStar","contact":"Peng Tan","contact-id":109870,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes Interim conclusions for KI#2","secretary_remarks":"Revision of S2-2601454. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13690,"status":"approved","reservation_date":"2026-02-16 09:18:32","uploaded":"2026-02-16 09:41:04","revisionof":"S2-2601454","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601476.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601477","title":"Conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides conclusions for KI#2 IMS enhancement for GEO NB-IoT NTN access.","secretary_remarks":"Revision of S2-2601455. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13750,"status":"approved","reservation_date":"2026-02-16 09:18:32","uploaded":"2026-02-16 09:41:04","revisionof":"S2-2601455","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.0.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601477.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2601478","title":"Add conclusion for KI#4.","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"pCR","for":"Approval","abstract":"This pCR is proposed to add conclusion for KI#4.","secretary_remarks":"Revision of S2-2601458. Agreed in parallel session. Block approved","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":13950,"status":"approved","reservation_date":"2026-02-16 09:18:32","uploaded":"2026-02-16 09:41:04","revisionof":"S2-2601458","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_173_Goa_2026-02\/Docs\/S2-2601478.zip","group":"S2","meeting":"S2-173","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]