[{"name":"SP-211107","title":"LS from TSG RAN: Draft LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.1801-2","source":"TSG RAN","contact":"Meng XIANJIE","contact-id":57634,"tdoctype":"LS in","for":"Action","abstract":"For 3GPP review: Overall description: ITU-R Working Party 5A kindly invites external organizations to provide updated and\/or new material, and any other relevant information, for the draft revision of Recommendation ITU R M.1801-2. Also, please indicate if any of the standards in Recommendation ITU-R M.1801-2 could be removed from the next revision should any of them have fallen into disuse. In RAN #92e, RAN ITU AH proposed that further consider a potential Reply LS to ITU-R WP5A, if an answer is needed and in case provide it to RAN#93e. Actions: TSG RAN asks TSG SA to review this document and provide feedbacks to the PCG, by September 17, 2021. It is reminded that before final submission to ITU-R, in footnote 1 of this document, the source PCG doc number has to be updated as soon as it is available. The submission deadline for the submission of the material to ITU-R is November 8th. 3GPP PCG#47e is asked to approve this document to allow Individual Members to submit it to ITU-R WP5A.","secretary_remarks":"For review and forwarding to PCG. CC#4: This LS was endorsed and will be forwarded to the PCG.","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13250,"status":"endorsed","reservation_date":"2021-09-16 07:15:12","uploaded":"2021-09-16 07:15:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"RP-212580","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211107.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-211108","title":"LS from TSG RAN: DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 6","source":"TSG RAN","contact":"Giovanni Romano","contact-id":10718,"tdoctype":"LS in","for":"Action","abstract":"For 3GPP review: in: TSG SA feedback LS before: September 17, 2021 to: 3GPP PCG Overall description: ITU-R Working Party 5D (WP 5D) informed 3GPP on their schedule towards Revision 6 of Recommendation M.2012. Actions: TSG RAN asks TSG SA to review this document and provide feedbacks to the PCG, by September 17, 2021. It is reminded that before final submission to ITU-R, in footnote 1 of this document, the source PCG doc number has to be updated as soon as it is available. The submission deadline for the submission of the material to ITU-R is January 31st, 2022. Therefore, 3GPP PCG#47e is asked to approve and provide the approved version of the material to ATIS. The final version of the document will be submitted to ITU-R WP5D by ATIS on behalf of 3GPP OPs.","secretary_remarks":"For review and forwarding to PCG. CC#4: This LS was endorsed and will be forwarded to the PCG.","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13260,"status":"endorsed","reservation_date":"2021-09-16 07:15:13","uploaded":"2021-09-16 07:15:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"RP-212538","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211108.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-211109","title":"LS from TSG RAN: DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision \u2018After Year 2021\u2019","source":"TSG RAN","contact":"Giovanni Romano","contact-id":10718,"tdoctype":"LS in","for":"Action","abstract":"For 3GPP review: in: TSG SA feedback LS before: September 17, 2021 to: 3GPP PCG Overall description: ITU-R Working Party 5D (WP 5D) informed 3GPP on their schedule for updating Recommendation ITU-R M.2150 to Revision 'After Year 2021'. Actions: TSG RAN asks TSG SA to review this document and provide feedbacks to the PCG, by September 17, 2021. It is reminded that before final submission to ITU-R, in footnote 1 of this document, the source PCG doc number has to be updated as soon as it is available. The submission deadline for the submission of the material to ITU-R is January 31st, 2022. Therefore, 3GPP PCG#47e is asked to approve and provide the approved version of the material to ATIS. The final version of the document will be submitted to ITU-R WP5D by ATIS on behalf of 3GPP OPs.","secretary_remarks":"For review and forwarding to PCG. CC#4: This LS was endorsed and will be forwarded to the PCG.","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13270,"status":"endorsed","reservation_date":"2021-09-16 07:15:13","uploaded":"2021-09-16 07:15:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"RP-212576","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211109.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-211110","title":"LS from TSG RAN: DRAFT LTI on 3GPP activities on 'Satellite IOT'","source":"TSG RAN","contact":"Giovanni Romano","contact-id":10718,"tdoctype":"LS in","for":"Action","abstract":"For 3GPP review: in: TSG SA feedback LS before: September 17, 2021 to: 3GPP PCG Overall description: WP4B requires information on 3GPP activities relevant to the topic of deployment scenarios and network architectures that are being considered to efficiently provide M2M\/IoT applications over satellite systems. This document provides the 3GPP proposal, stating that 3GPP completed the Study Item, initiated a Work Item within the framework of Release 17 and provides the link to the TR 38.829 Study on Narrow-Band Internet of Things (NB-IoT ) \/ enhanced Machine Type Communication (eMTC ) support for Non-Terrestrial Networks (NTN ) Actions: TSG RAN asks TSG SA to review this document and provide feedbacks to the PCG, by September 17, 2021. It is reminded that before final submission to ITU-R, in footnote 1 of this document, the source PCG doc number has to be updated as soon as it is available. The submission deadline for the submission of the material to ITU-R is October 18th, before PCG#47e. Therefore, 3GPP PCG#47e is asked to approve this document by correspondence by October 11th. The final version of the document will be submitted to ITU-R WP4B by 3GPP Individual Members on behalf of TSG RAN.","secretary_remarks":"For review and forwarding to PCG. CC#4: This LS was endorsed and will be forwarded to the PCG.","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13280,"status":"endorsed","reservation_date":"2021-09-16 07:15:13","uploaded":"2021-09-16 07:15:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"RP-212578","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211110.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-211111","title":"LS from TSG RAN: LS on how to handle satellite specific specifications in future submissions to ITU related to terrestrial-only technologies","source":"TSG RAN","contact":"Giovanni Romano","contact-id":10718,"tdoctype":"LS in","for":"Action","abstract":"TSG RAN#93e endorsed the following principle on how to manage satellite-specific technical specification in future submissions to ITU related to terrestrial-only technologies: Satellite specific technical specifications will not be submitted to ITU for inclusion in future submissions related to terrestrial-only technologies. Action: TSG RAN respectfully asks TSG SA and 3GPP PCG to take the above information into account.","secretary_remarks":"CC#4: This was left open for the Monday CC#5. Noted","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13290,"status":"noted","reservation_date":"2021-09-16 14:34:37","uploaded":"2021-09-16 14:35:05","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, 3GPP PCG","Cc":"","lsoriginalls":"RP-212537","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211111.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-211116","title":"LS on EPS support for IoT NTN in Rel-17","source":"TSG RAN","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"LS in","for":"Action","abstract":"TSG RAN would like to thank SA WG2 for their LS on EPS support for IoT NTN in Rel-17. TSG RAN notes that SA WG2 does not plan to define new functionality in Rel-17 to support discontinuous coverage. TSG RAN would like to emphasize that support for discontinuous coverage (incl. related impact on paging, (e)DRX, PSM, and PLMN search) is considered minimum essential functionality in TSG RAN with work under way in RAN WGs. Bearing in mind the scope of SA WG2 WID, TSG RAN would like to ask: - TSG SA, SA WG2 to reconsider supporting new functionality to support discontinuous coverage; - TSG CT\/CT WG1 to consider whether low-hanging fruit solutions are feasible at NAS relying on existing functionality to support discontinuity in coverage, or, should TSG SA, SA WG2 decide to introduce new functionality to support discontinuous coverage, to align with TSG SA, SA WG2. - TSG SA\/SA WG2\/CT\/CT WG1 to inform TSG RAN on the outcome of the discussion above. TSG RAN may adjust the scope of its Work Item depending on the outcome of the above discussions in TSG SA, SA WG2, CT, CT WG1. TSG RAN notes that SA WG2 decided not to support WUS, assuming it was not discussed in RAN for Rel-17 IoT NTN. TSG RAN would like to emphasize that work to support WUS in IoT NTN is indeed ongoing, with RAN WG2 concluding the existing WUS mechanism can be reused without enhancement (except for minor enhancements if needed to support discontinuous coverage). TSG RAN would therefore like to ask TSG SA, SA WG2, CT and CT WG1 to ensure WUS is not excluded. Action: TSG RAN would like to ask TSG SA, SA WG2, TSG CT and CT WG1 to take note of the information above.","secretary_remarks":"CC#4: This LS was noted.","agenda_item_sort_order":73,"ainumber":"20.1","ainame":"General project management issues","tdoc_agenda_sort_order":13300,"status":"noted","reservation_date":"2021-09-17 07:48:19","uploaded":"2021-09-17 07:50:23","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1, TSG CT, TSG SA, SA WG2","Cc":"","lsoriginalls":"RP-212617","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_93E_Electronic_2021_09\/Docs\/SP-211116.zip","group":"SP","meeting":"SP-93-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]