[{"name":"SP-250423","title":"LS from TSG RAN: LS on AI\/ML UE sided data collection","source":"TSG RAN","contact":"Diana Pani","contact-id":83914,"tdoctype":"LS in","for":"Action","abstract":"TSG RAN respectfully thanks SA WG2\/SA WG5 for their response LSs on AI\/ML UE side data collection. TSG RAN continued further discussions in RAN#106 and has agreed to a way forward in RP-243307. More specifically, TSG RAN has agreed to the following: From RAN perspective, transfer of data over UP for Solution 2 in SA WG2 should be studied and provide feedback on fulfilment of visibility and controllability requirements. Transfer of data over UP for Solution 3 can be studied by SA WG5. RAN has already concluded that transfer of data over CP for Solution 2 and 3 can meet the visibility and controllability RAN requirements, even though some scalability concerns have been raised for high amount of data transfer. RAN is not expecting SA WG2 and SA WG5 to study the transfer of data over CP for now. {. . .} Action: TSG RAN kindly asks TSG SA to start studying the transfer of data over UP for solution 2 in SA WG2 and transfer of data over UP for solution 3 in SA WG5 and provide feedback to TSG RAN and RAN WG2.","secretary_remarks":"Revision of postponed SP-250003 from SA#107. Noted","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10250,"status":"noted","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-07 06:45:56","revisionof":"SP-250003","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, SA WG2, SA WG5","Cc":"RAN WG2, SA WG3","lsoriginalls":"RP-243316","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250423.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250427","title":"LS from CT WG1: LS on the conclusion of FS_MINT_Ph2","source":"CT WG1","contact":"Mingxue Li","contact-id":80903,"tdoctype":"LS in","for":"Action","abstract":"CT WG1 has studied on MINT support in EPS for 5G-only national roaming UE based on the service requirements that SA WG1 had specified for Rel-19. As decided in TSG SA#104 (as described in SP-241013), it was confirmed that CT WG1 should consult SA WG2 on the architectural impacts and consult SA for final decision on how to proceed with normative work before concluding the study. CT WG1 has intensively studied for three WG meetings after the SID was approved in TSG CT#107, and it resulted in 8 key issues with 10 potential solutions as described in TR 24.812 v19.0.0. In CT WG1 #154 meeting, CT WG1 has captured conclusions for all the Key Issues in clause 8 of TR 24.812 v19.1.0, which requires approval in TSG CT#108 in June 2025. CT WG1 would like to ask SA to take above information into consideration and to provide guidance on how to proceed with normative work. CT WG1 would like to ask SA WG2 to take above information into consideration and to update their specifications accordingly, if needed. Action: CT WG1 kindly asks SA to take above information into consideration and to provide guidance on how to proceed with normative work.","secretary_remarks":"Response drafted in SP-250721. Final response in SP-250807","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10330,"status":"replied to","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-07 06:45:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, SA WG2","Cc":"TSG CT","lsoriginalls":"C1-252559","lsreply":"SP-250807","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250427.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250428","title":"LS from RAN WG2: LS on AI\/ML UE sided data collection","source":"RAN WG2","contact":"jun chen","contact-id":100816,"tdoctype":"LS in","for":"Information","abstract":"RAN WG2 would like to thank SA WG5 for their LS in R2-2501759\/S5-250828 on AI\/ML UE sided data collection. For the SA WG5 assumption that the UP tunnel associated with data transfer is between UE and gNB for the solution 3, RAN WG2 has discussed the assumption and has made the following agreement: From RAN WG2 point of view UP tunnel between UE and gNB is not considered for 5GA R19\/20, as currently the UP tunnel doesn't terminate in the gNB","secretary_remarks":"Noted","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10240,"status":"noted","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-07 06:45:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG5","Cc":"TSG SA, SA WG2, SA WG3, TSG RAN","lsoriginalls":"R2-2503168","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250428.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250429","title":"LS from SA WG2: Reply LS on OSAppID usage by AppToken use case","source":"SA WG2","contact":"Fernando Pascual Blanco","contact-id":109881,"tdoctype":"LS in","for":"Action","abstract":"SA WG2 thanks GSMA TSGNS for their LS on OSAppID usage by AppToken use case. SA WG2 provides the following updates to GSMA TSGNS. {. . .} Action: SA WG2 kindly asks SA to take above SA WG2 information into account and accordingly to respond GSMA TSGNS LS that was received in TSGNS44_003v6 (S2-2502797).","secretary_remarks":"Responses drafted in SP-250571, SP-250710. Final response in SP-250782.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10270,"status":"replied to","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-07 06:45:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"SA WG3","lsoriginalls":"S2-2504468","lsreply":"SP-250782","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250429.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250431","title":"LS from SA WG3: Reply LS on OSAppID usage by App Token use case","source":"SA WG3","contact":"Yousif Targali","contact-id":82316,"tdoctype":"LS in","for":"Action","abstract":"SA WG3 provides the following updates to TSG SA and kindly asks SA to consolidate the responses from SA WG2 and SA WG3, and respond to GSMA TSGNS LS that was received in TSGNS44_003v6 (S3-251229). SA WG3 discussed the GSMA TSGNS LS questions on OSAppID usage by App Token and would like to provide the following answers: TSGNS asks SA WG2: 2. Would SA WG2 prefer an alternate mechanism to preserve end user privacy? [SA WG3 Answer] Subscriber privacy in 3GPP systems is in scope of SA WG3. SA WG3 has not discussed any alternative mechanisms for this use case. Therefore, SA WG3 will not be able to provide any feedback on alternative mechanism. TSGNS asks SA WG3 to consider the security implications of the proposed mechanism [SA WG3 Answer] SA WG3 was not able to reach an agreement whether there are privacy or security issues with the liaised GSMA procedure. Action: SA WG3 kindly asks TSG SA to take the above information into account and coordinate the reply LS to GSMA TSGNS group.","secretary_remarks":"Responses drafted in SP-250571, SP-250710. Final response in SP-250782.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10280,"status":"replied to","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-07 06:45:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"SA WG2","lsoriginalls":"S3-251789","lsreply":"SP-250782","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250431.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250436","title":"LS from SA WG1: Reply LIAISON on Public Warning System based on digital signature mechanisms","source":"SA WG1","contact":"Pengtai Qin","contact-id":92402,"tdoctype":"LS in","for":"Information","abstract":"SA WG1 would like to thank CCSA for their LS. Answer from SA WG1: SA WG1 has agreed attached CR to incorporate CPAS requirements into TS 22.268.","secretary_remarks":"Response drafted in SP-250781. Final response in SP-250853","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10210,"status":"replied to","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-27 12:43:21","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CCSA","Cc":"TSG SA, TSG CT, CT WG1","lsoriginalls":"S1-252944","lsreply":"SP-250853","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250436.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250437","title":"LS from SA WG2: Reply LS on AI\/ML UE sided data collection","source":"SA WG2","contact":"Xiaobo Wu","contact-id":104426,"tdoctype":"LS in","for":"Information","abstract":"SA WG2 thanks TSG RAN for the LS on AI\/ML UE sided data collection. Regarding the following request from RAN: 'TSG RAN kindly asks TSG SA to start studying the transfer of data over UP for solution 2 in SA WG WG2 and transfer of data over UP for solution 3 in SA WG WG5 and provide feedback to TSG RAN and RAN WG WG2.' SA WG2 would like to provide the following information: 1) A new Rel-20 5G-A SA WG2 SID SP-250413 on Core Network Enhanced Support for Artificial Intelligence (AI) \/ Machine Learning (ML) Phase 2 (FS_AIML_CN_Ph2) has been approved in SA#107. 2) SA WG2 started the study in SA WG2#168 meeting with progress captured in TR 23.700-04. No conclusion has been reached yet, however SA WG2 is currently discussing potential solutions. 3) The TR 23.700-04 is planned to be sent for information at TSG#109, Sep 2025 and for approval at TSG#110, Dec 2025. Once the conclusion has been reached for AI\/ML UE sided data collection based on above, SA WG2 will update TSG RAN.","secretary_remarks":"Noted","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10260,"status":"noted","reservation_date":"2025-05-07 06:44:59","uploaded":"2025-05-27 12:43:21","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN","Cc":"TSG SA, SA WG3, SA WG5, RAN WG1, RAN WG2","lsoriginalls":"S2-2505713","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250437.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250571","title":"[DRAFT] Reply LS on OSAppID usage by AppToken use case","source":"TELEFONICA S.A.","contact":"Jesus Martin","contact-id":48535,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OSAppID usage by AppToken use case. This LS recaps the answers provided by SA2 and SA3","secretary_remarks":"Response to SP-250429, SP-250431. Revised, merging SP-250710 to SP-250782.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10290,"status":"revised","reservation_date":"2025-05-30 08:22:35","uploaded":"2025-06-03 16:32:25","revisionof":"","revisedto":"SP-250782","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA TSGNS","Cc":"SA WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250571.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250710","title":"[DRAFT] Reply LS on OSAppID usage by AppToken use case","source":"Google","contact":"Ellen C. Liao","contact-id":107199,"tdoctype":"LS out","for":"Approval","abstract":"To: GSMA TSGNS. CC: SA WG2, SA WG3","secretary_remarks":"Response to SP-250429, SP-250431. Merged into SP-250782","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10310,"status":"merged","reservation_date":"2025-06-03 00:27:35","uploaded":"2025-06-03 17:37:48","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA TSGNS","Cc":"SA WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250710.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250711","title":"LS from SA WG2: Response to LS on the conclusion of FS_MINT_Ph2","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"SA WG2 thanks CT WG1 for the LS on the conclusion of FS_MINT_Ph2. SA WG2 has discussed the conclusions of TR 24.812 v19.0.0 and approved CRs to TR 24.812 in CT WG1#154 meeting, and provides the following feedback: -The concluded solutions are based on the same mechanism as introduced in Rel-17 MINT work, with the additional of RAT restriction handling. -SA WG2 assumes that the UEs, that are subject to 5G-only roaming agreement and entitled to receive disaster roaming service from a 4G VPLMN, have EPS subscription in HSS\/UDM and allowed to receive service via the 4G VPLMN based on disaster roaming agreement. -SA WG2 further considers that it's critical for MME to provide disaster roaming indication to HPLMN entity when 4G serving MME provides disaster roaming service to the UE (e.g. similar mechanism as 5G serving AMF provides the disaster roaming indication to the HPLMN NFs when provides the disaster roaming service to UE in Rel-17 MINT work). SA WG2 agreed that the SA WG2 specification would be updated to align with the normative work of FS_MINT_Ph2 in CT WG1. NOTE: There may be alternative solutions (e.g. network sharing). SA WG2 endorsed Rel-20 WID NetShare_ph2-ARC which considers using Indirect Network Sharing in 5GS for disaster condition. Action: SA WG2 has no concerns with the conclusions of TR 24.812 v19.0.0 and approved CRs to TR 24.812 in CT WG1#154 meeting. SA WG2 kindly asks SA to provide guidance on how to proceed with normative work.","secretary_remarks":"Response drafted in SP-250721. Final response in SP-250807","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10320,"status":"replied to","reservation_date":"2025-06-03 05:36:26","uploaded":"2025-06-03 05:43:14","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1, TSG SA","Cc":"TSG CT","lsoriginalls":"S2-2505932","lsreply":"SP-250807","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250711.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250721","title":"[DRAFT] Reply LS on the conclusion of FS_MINT_Ph2","source":"China Telecom","contact":"Biao Long","contact-id":100068,"tdoctype":"LS out","for":"Approval","abstract":"Response to LS on the conclusion of FS_MINT_Ph2 (SP-250711\/ S2-2505932) and LS on the conclusion of FS_MINT_Ph2 (SP-250427 \/ C1-252559).","secretary_remarks":"Response to SP-250711, SP-250427. Revised to SP-250783.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10340,"status":"revised","reservation_date":"2025-06-03 08:58:10","uploaded":"2025-06-03 09:00:19","revisionof":"","revisedto":"SP-250783","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1, SA WG2","Cc":"TSG CT","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250721.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250781","title":"[DRAFT] Reply LIAISON on Public Warning System based on digital signature mechanisms","source":"TSG SA","contact":"Francesco Pica","contact-id":57089,"tdoctype":"LS out","for":"Approval","abstract":"To: CCSA, SA WG1. CC: TSG CT, CT WG1. Attachments: SP-250823","secretary_remarks":"Created at meeting. Response to SP-250436. Revised to SP-250853.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10220,"status":"revised","reservation_date":"2025-06-10 16:48:47","uploaded":"2025-06-13 11:11:08","revisionof":"","revisedto":"SP-250853","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CCSA, SA WG1","Cc":"TSG CT, CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250781.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250782","title":"Reply LS on OSAppID usage by AppToken use case","source":"TSG SA","contact":"Jesus Martin","contact-id":48535,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OSAppID usage by AppToken use case. This LS recaps the answers provided by SA2 and SA3","secretary_remarks":"Revision of SP-250571, merging SP-250710. This LS OUT was approved","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10300,"status":"approved","reservation_date":"2025-06-10 16:48:47","uploaded":"2025-06-10 16:52:24","revisionof":"SP-250571","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SP-250429","lsto":"GSMA TSGNS","Cc":"SA WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250782.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250783","title":"Reply LS on the conclusion of FS_MINT_Ph2","source":"China Telecom","contact":"Biao Long","contact-id":100068,"tdoctype":"LS out","for":"Approval","abstract":"Response to LS on the conclusion of FS_MINT_Ph2 (SP-250711\/ S2-2505932) and LS on the conclusion of FS_MINT_Ph2 (SP-250427 \/ C1-252559).","secretary_remarks":"Revision of SP-250721. Revised to SP-250807.","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10350,"status":"revised","reservation_date":"2025-06-10 16:48:47","uploaded":"2025-06-13 11:11:08","revisionof":"SP-250721","revisedto":"SP-250807","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MINT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1, SA WG2, CT WG4","Cc":"TSG CT","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250783.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250807","title":"Reply LS on the conclusion of FS_MINT_Ph2","source":"TSG SA","contact":"Biao Long","contact-id":100068,"tdoctype":"LS out","for":"Approval","abstract":"Response to LS on the conclusion of FS_MINT_Ph2 (SP-250711\/ S2-2505932) and LS on the conclusion of FS_MINT_Ph2 (SP-250427 \/ C1-252559).","secretary_remarks":"Revision of SP-250783. This LS OUT was approved","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10360,"status":"approved","reservation_date":"2025-06-12 09:06:30","uploaded":"2025-06-13 11:11:08","revisionof":"SP-250783","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MINT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SP-250711","lsto":"CT WG1, SA WG2, CT WG4","Cc":"TSG CT","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250807.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-250853","title":"Reply LIAISON on Public Warning System based on digital signature mechanisms","source":"TSG SA","contact":"Francesco Pica","contact-id":57089,"tdoctype":"LS out","for":"Approval","abstract":"To: CCSA, SA WG1. CC: TSG CT, CT WG1. Attachments: SP-250823","secretary_remarks":"Revision of SP-250781. This LS OUT was approved","agenda_item_sort_order":10,"ainumber":"2.2","ainame":"Incoming LSs which need an outgoing LS","tdoc_agenda_sort_order":10230,"status":"approved","reservation_date":"2025-06-13 08:57:19","uploaded":"2025-06-13 11:11:08","revisionof":"SP-250781","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SP-250436","lsto":"CCSA, SA WG1","Cc":"TSG CT, CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_108_Prague_2025-06\/Docs\/SP-250853.zip","group":"SP","meeting":"SP-108","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]