[{"name":"R5-193513","title":"RAN5#83 Session Programme","source":"WG Chairman","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"agenda","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35130,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-03 15:24:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193513.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193514","title":"RAN5 Leadership Team","source":"WG Chairman","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35140,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-03 15:24:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193514.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193515","title":"RAN5#82 WG Minutes","source":"ETSI Secretariat","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35150,"status":"approved","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-04-26 12:45:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193515.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193516","title":"TSG RAN WG5 Action Points after RAN5#82 and RAN5#5 5G-NR Ad hoc","source":"ETSI Secretariat","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35160,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-04-26 12:45:08","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193516.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193517","title":"RAN5#5 5G-NR Adhoc Minutes","source":"ETSI Secretariat","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35170,"status":"approved","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-07 11:57:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193517.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193518","title":"Latest RAN Plenary notes","source":"WG Chairman","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"Minutes of the Previous Meeting\nRP-190643    Approved minutes from RP#83, based on the draft version submitted initially in RP-190002.\nRAN WG Status Reports\nRP-190005   RAN1; the associated CRs for approval were listed in RP-190006\nRP-190007   RAN2; the associated CRs for approval were listed in RP-190008\nRP-190009   RAN3; the associated CRs for approval were listed in RP-190010\nRP-190683   RAN4; the associated CRs for approval were listed in RP-190012\nRP-190013   RAN5; the associated CRs for approval were listed in RP-190014\nRP-190016   RAN6; the associated CRs for approval were listed in RP-190017\nMatters arising from the RAN5 Status Report and CR Review\nRP-190013 \nRAN4\/RAN5 Dependencies\nRAN4 Chair committed to get a LS response to RAN5 with update on RAN4\/RAN5 Dependencies before RAN5#5 5G-NR Adhoc in April 19.\nNSA Options 4 & 7 and SA Option 5 Deliverables\nInformed RAN about immediate focus of RAN5 on progressing NSA Option 3 and SA Option 2, hence Phase 1 targets for NSA Options 4 & 7 and SA Option 5 have been deferred to Aug 19. No concerns raised and\/or request to expedite this.\nRP-190014   All CRs except R5-192865 and R5-192730 presented for approval were approved. Replacement Company CRs approved (details below).\nCompany CRs Approved\n5GS WI\nRP-190746 Updates to Maximum Output Power Test Cases (replacement of RAN5 agreed CR R5-192865 included in CR Pack RP-190079)\nRemoved the change limiting Maximum Peak EIRP test requirement to 33 dBm and updated editors notes capturing -  current state of MU analysis completed assuming EIRP is limited to = 33 dBm and an augmented MU analysis for 33dBm < EIRP = 43 dBm shall be completed by RAN #84.\nLTE WI\nRP-190616 Updating 8.5.4.1 to check FGI 103 and 104 (replacement of RAN5 agreed CR R5-192730 included in CR Pack RP-190087\nIncluded statement about transition period\nMCC STF 160\nRP-190015\tThe TF 160 report;\nApproved\nStatus Reports - all noted and any changes to TCD and updated WIDs were approved\nRed flag\nOne company failed to meet their commitments, hence the rapporteur is red flagged:\nNokia (RP-190562) \u2013 Late tdoc request of Status Report, SR submitted with a Performance Part \u2018completion percentage\u2019 included by error, had to be brought up & noted during the meeting.","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35180,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-03 15:24:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193518.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193519","title":"Latest RAN Plenary draft Report","source":"WG Chairman","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"report","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35190,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-03 15:43:21","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193519.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193520","title":"Post Plenary Active Work Item update","source":"ETSI Secretariat","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":35200,"status":"noted","reservation_date":"2019-04-17 13:36:46","uploaded":"2019-05-07 09:12:50","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193520.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-193978","title":"MCC TF160 Status Report","source":"MCC TF160","contact":"Olivier Genoud","contact-id":58316,"tdoctype":"report","for":"Approval","abstract":"Progress \u2013 TTCN development _x00B_(Mar-->May\u20191)\nCompleted: UTRA: R99 TC 12.2.2.5; LTE: eLAA, QCI 66, Band 53;\nStarted: IMS (IR.92): Session Timer, IR.92 v12 coverage;\nProgressed: 5GS: EN-DC (NSA option 3), NR\/5GC (SA option 2);\nLTE: Rel-13\/14\/15 CA new BCs; MCPTT: On-network group call\n\nProgress \u2013 TTCN verification_x00B_(Status on 10th May\u20191\n\n5G Standalone Option2: \n1st successful PASS of a 5G SA Option2 TTCN-3 conformance test case submitted to RAN5 for verification on 11th March 2019.\n5GC NAS test case 9.1.6.1.1. \nStatus: Provisionally Agreed (due to dependencies on prose CRs submitted at RAN5#83). \nAll 7 verifications to date submitted on:\nNR FR1: using conducted test environment.\n\nSummary & open issues from _x00B_TTCN Workshop #45 (16th Apr\u2019):\nNew Test Models \u2013 LTE:\nMission Critical (MCPTT): \nIP-based test model endorsed by the workshop. \nTS 36.579-5 prose CR proposed at RAN5#83. \nUL Data Compression (UDC): \nTest model \/ ASPs updates endorsed by the workshop. \nTS 36.523-3 prose CR proposed at RAN5#83. \nQoE Measurement Collection (QMC): \nTest model \/ ASPs updates endorsed by the workshop. \nTS 36.523-3 prose CR proposed at RAN5#83. \n\nNew Test Models \u2013 5G:\nCommon aspects: \nEndorsed test model updates for: NR TBS handling, default NR UL Grants, intra-NR mobility in RRC_CONNECTED.\nEndorsed ASP updates for: SSB scheduling, Measurement Gaps, UL HARQ retransmissions handling.\nDiscussions ongoing on: \nthe semantic requirements of the RlcBearerRouting field.\nTest model \/ ASPs updates for handling more than 1 beam in 1 NR cell. \nEN-DC (NSA option 3): \nEndorsed ASP updates for: the IP routing table to support IP traffic on a Default EPS Bearer connected to an SCG NR DRB.\nNR\/5GC (SA option 2): \nEndorsed addition of a PIXIT to indicate the XRES length, needed for 5G AKA.\nEndorsed new NR\/5GC test models for: NR\/E-UTRA Inter-RAT testing, Layer3 NR CA testing.\nEndorsed ASP updates for: SIB1 scheduling. \n\nStatus of 2019 TTCN Funding:\n2019 workload is estimated at 111.5 man.months (mm), see previous slides.\nPCG#41\/OP#40 approved the 3GPP funding of 68 mm for 2019 TTCN tasks.\nPTCRB(CTIA) and GCF have agreed to continue TF160 financial support in 2019.\n3GPP companies \/ 3GPP MRPs committed to provide 19.5 mm as voluntary contributions for 2019 TTCN development.\nTotal resources of 111.5 mm.","secretary_remarks":"","agenda_item_sort_order":4,"ainumber":"2.1","ainame":"\tLive Reports","tdoc_agenda_sort_order":39780,"status":"revised","reservation_date":"2019-04-30 16:14:45","uploaded":"2019-05-10 12:51:19","revisionof":"","revisedto":"R5-194761","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_83_Reno\/Docs\/R5-193978.zip","group":"R5","meeting":"R5-83","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]