[{"name":"S2-2506119","title":"LS from CT WG1: LS on the path information in 5G ProSe multi-hop discovery procedures","source":"CT WG1","contact":"Xingyue Zhou","contact-id":42680,"tdoctype":"LS in","for":"Action","abstract":"For 5G ProSe multi-hop UE-to-UE relay discovery procedure with reference to TS 23.304 clause 5.8.6.3 (excerpted below), the following two questions to SA WG2 are raised: {. . .} Action: CT WG1 kindly asks SA WG2 to provide answers to the three questions above.","secretary_remarks":"Responses drafted in S2-2506297, S2-2506791, S2-2506895, S2-2506957. Final response in S2-2508102","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13800,"status":"replied to","reservation_date":"2025-06-26 15:02:09","uploaded":"2025-06-27 12:04:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"C1-253724","lsreply":"S2-2508102","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506119.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506121","title":"LS from CT WG1: LS on parameters for ProSe additional parameters announcement request message","source":"CT WG1","contact":"Sunghoon Kim","contact-id":87408,"tdoctype":"LS in","for":"Action","abstract":"As per stage-2 requirements in clause 6.3.2.5.4 of TS 23.304 which states the following: 2. The 5G ProSe Remote UE sends to the 5G ProSe Intermediate UE-to-Network Relay an Additional Parameters Announcement Request including the following additional information to obtain additional parameters. - Relay Service Code: information about the connectivity service provided by the 5G ProSe UE-to-Network Relay. - Root Relay Info: identify information (i.e. User Info ID) of the 5G ProSe UE-to-Network Relay. CT WG1 would like to ask questions for including both relay service code and root relay info in the ProSe additional parameters announcement request message. Given that the ProSe additional parameter announcement request message is a PC5-S message, it is assumed that the 5G ProSe multi-hop remote UE, the 5G ProSe intermediate UE-to-network relay UE, and the root UE-to-network relay UE have established the PC5 direct link for the relay service code. Hence, the ProSe additional parameter announcement request message can be routed to the root UE-to-network relay UE through the established PC5 direct link. In this sense, both the relay service code and the root relay info seem not necessary to be included in the ProSe additional parameter announcement request message. Question 1: CT WG1 would like to get clarification from SA WG2 regarding what the usage of both relay service code and root relay info for ProSe additional parameter announcement request procedure is. Question 2: CT WG1 would like to ask SA WG2 if both relay service code and root relay info can be excluded from the message for protocol efficiency. Action: CT WG1 kindly asks SA WG2 to provide feedback for the questions above.","secretary_remarks":"Responses drafted in S2-2506198, S2-2506897. Final response in S2-2507872","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13950,"status":"replied to","reservation_date":"2025-06-26 15:02:09","uploaded":"2025-06-27 12:04:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"C1-254010","lsreply":"S2-2507872, S2-2507872","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506121.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506131","title":"LS from RAN WG2: LS on relay reselection notification agreements","source":"RAN WG2","contact":"Boyuan Zhang","contact-id":102107,"tdoctype":"LS in","for":"Action","abstract":"In RAN2#129bis meeting, RAN WG2 has made the following agreement: Agreements: When the parent UE in idle\/inactive performs reselection, RAN WG2 assume that an indication of the reselection is needed for the child UE. FFS if the notification message is used or we rely on upper layer signalling (e.g., discovery). In addition, to address the FFS issue in the above agreement, it is further agreed in RAN WG2 #130 meeting that the notification message is used to indicate the L2 relay (re)selection triggered by AS layer to the child UE, which is shown as follows: Agreements: The notification message is used for the L2 child UE in case of upstream relay (re)selection triggered by AS layer failure cases (Uu\/PC5 link failure\/release, using legacy cause value) where the upper layer does not trigger link release towards the child. For reselection triggered by upper layers we rely on the upper-layer notification\/release mechanism already defined. Remote UE handling of the notification is up to upper layer implementation when the UE is in idle\/inactive state. Further handling of any inter-layer issues on this topic can be done in maintenance phase. Regarding to the notification message mentioned in the above agreements, it is defined in TS 38.331 as NotificationMessageSidelink since Rel-17, in details, the notification message is used to inform L2 or L3 U2N Remote UE(s) when the L2 or L3 U2N Relay UE performs handover, detects Uu RLF, or its Uu RRC connection establishment\/resume fails. Upon reception of the notification message, it is up to U2N Remote UE implementation whether to release or keep the unicast PC5 link. If U2N Remote UE decides to release the unicast PC5 link, it triggers the PC5 release procedure and may perform cell or relay reselection. Action: RAN WG2 would like to respectfully ask SA WG2 and CT WG1 to take the above RAN WG2 agreements into account.","secretary_remarks":"Response drafted in S2-2506423. Noted in parallel session","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":14020,"status":"noted","reservation_date":"2025-06-26 15:02:09","uploaded":"2025-06-27 12:04:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, CT WG1","Cc":"","lsoriginalls":"R2-2504809","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506131.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506197","title":"Clarification on additional parameters announcement request","source":"LG Electronics","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 6.3.2.5.4 - Remove Relay Service Code and Root Relay Info in step 2","secretary_remarks":"Revised in parallel session to S2-2507871.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13980,"status":"revised","reservation_date":"2025-07-13 07:23:16","uploaded":"2025-08-14 05:13:50","revisionof":"","revisedto":"S2-2507871","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":555.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506197.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"6.3.2.5.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506198","title":"[DRAFT] Reply LS on parameters for ProSe additional parameters announcement request message","source":"LG Electronics","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on parameters for ProSe additional parameters announcement request message","secretary_remarks":"Response to S2-2506121. Revised in parallel session to S2-2507872.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13960,"status":"revised","reservation_date":"2025-07-13 07:26:45","uploaded":"2025-08-14 05:13:50","revisionof":"","revisedto":"S2-2507872","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506198.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506297","title":"[DRAFT] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"Response to S2-2506119. Revised in parallel session to S2-2507869.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13810,"status":"revised","reservation_date":"2025-08-08 11:45:28","uploaded":"2025-08-14 14:58:15","revisionof":"","revisedto":"S2-2507869","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506297.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506366","title":"Correction of path information for Multi-hop U2U discovery for Non-IP type and for Multi-hop U2N Model B discovery","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Removed Source layer-2 ID of the Prose End UE in the Multi-Hop Modela A discovery for Non-IP type Clarified the use of Source layer-2 ID of the Prose End UE in the Multi-Hop Model B discovery for Non-IP type Removed incorrectly added Layer-2 IDs from the Path infromation in In clause 6.3.2.5.3","secretary_remarks":"Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13860,"status":"not treated","reservation_date":"2025-12-08 07:05:40","uploaded":"2025-08-14 14:58:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":556.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506366.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":" 5.8.6.3; 6.3.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506367","title":"Clarification of Identifiers for 5G ProSe Multi-hop UE-to-UE Relay for IP PDU type","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarified in a note that the Target Relay UE may be obtained by a Discoverer UE using an earlier Model A discovery (while still keeping the parameter optional, and keeping Model B discovery independent from Model A discovery) or it may have been obtained via an earlier connection established between the UE and that target relay.  Corrected referece to clause 5.1.5.1->5.1.5.1a in clauses 5.8.6.1 and 5.8.6.2  Other minor corrections in few other clauses","secretary_remarks":"Agreed in parallel session. Block approved","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":14040,"status":"agreed","reservation_date":"2025-12-08 07:05:41","uploaded":"2025-08-14 14:58:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":557.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250945","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506367.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":" 5.8.3.1;5.8.6.1;5.8.6.2; 6.3.2.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506423","title":"[DRAFT] Reply LS on relay reselection notification agreements","source":"NEC","contact":"Chunhui Zhu","contact-id":103480,"tdoctype":"LS out","for":"Approval","abstract":"The Reply LS on relay reselection notification agreements is proposed.","secretary_remarks":"Response to S2-2506131. Noted in parallel session","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":14030,"status":"noted","reservation_date":"2025-08-13 02:12:13","uploaded":"2025-08-15 12:06:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506423.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506791","title":"[DRAFT] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on the path information in 5G ProSe multi-hop discovery procedures (C1-253724)","secretary_remarks":"Response to S2-2506119. Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13870,"status":"not treated","reservation_date":"2025-08-14 12:16:38","uploaded":"2025-08-15 11:56:41","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506791.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506792","title":"Clarification on the path information in 5G ProSe multi-hop discovery procedures and Editorial Correction for TS 23.304","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the word \u2018discoverer\u2019 from the path information in multihup U2U Model A Discovery. Clarify the path information in the step 4a in clause 6.3.2.5.3 is an (ordered) list of User Info ID(s) of Intermediate UE-to-Network Relay(s) in the path that has relayed the Solicitation message. Typo fix.","secretary_remarks":"Revised in parallel session to S2-2507870.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13880,"status":"revised","reservation_date":"2025-08-14 12:16:38","uploaded":"2025-08-15 11:56:41","revisionof":"","revisedto":"S2-2507870","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":558.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506792.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"5.8.6.3, 6.3.2.5, 5.4.4.2, 5.4.5.2, 5.6.2.4.2, 5.6.3.1, 5.8.3.1, 6.3.2.6.1, 6.4.3.8.3, 6.4.3.9.1, 6.4.3.10.2, 6.7.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506895","title":"[DRAFT] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Qualcomm Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on the path information in 5G ProSe multi-hop discovery procedures.","secretary_remarks":"Response to S2-2506119. Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13910,"status":"not treated","reservation_date":"2025-08-14 23:01:40","uploaded":"2025-08-15 18:39:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506895.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506896","title":"Correction of Identifiers for 5G ProSe Multi-hop UE-to-UE Relay discovery of non-IP PDU type","source":"Qualcomm Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the \u2018discoverer\u2019 in the identifier description for Model A message in clause 5.8.6.3.","secretary_remarks":"Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13920,"status":"not treated","reservation_date":"2025-08-14 23:06:51","uploaded":"2025-08-15 18:39:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":559.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506896.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506897","title":"[DRAFT] Reply LS on parameters for ProSe additional parameters announcement request message","source":"Qualcomm Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on parameters for ProSe additional parameters announcement request message.","secretary_remarks":"Response to S2-2506121. Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":14000,"status":"not treated","reservation_date":"2025-08-14 23:11:03","uploaded":"2025-08-15 18:39:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506897.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506899","title":"Correction of parameters for ProSe additional parameters announcement request message","source":"Qualcomm Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the \u2018Relay Service Code\u2019 and \u2018Root Relay Info\u2019 from the Additional Parameters Announcement Request message description in clause 6.3.2.5.4.","secretary_remarks":"Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":14010,"status":"not treated","reservation_date":"2025-08-14 23:14:07","uploaded":"2025-08-15 18:39:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":560.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506899.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506956","title":"Correction to Multi-hop Discovery Procedures","source":"ZTE","contact":"Hao Dong","contact-id":75723,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct path information for multi-hop discovery procedures.","secretary_remarks":"Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13940,"status":"not treated","reservation_date":"2025-08-15 02:07:56","uploaded":"2025-08-15 09:12:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":561.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506956.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.8.6.3, 6.3.2.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2506957","title":"[DRAFT] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"ZTE","contact":"Hao Dong","contact-id":75723,"tdoctype":"LS out","for":"Approval","abstract":"[Draft] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","secretary_remarks":"Response to S2-2506119. Not Handled","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13930,"status":"not treated","reservation_date":"2025-08-15 02:07:57","uploaded":"2025-08-15 09:12:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2506957.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507869","title":"[DRAFT] Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"Revision of S2-2506297. Revised in parallel session to S2-2508009.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13820,"status":"revised","reservation_date":"2025-08-28 10:38:41","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2506297","revisedto":"S2-2508009","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507869.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507870","title":"Clarification on the path information in 5G ProSe multi-hop discovery procedures and Editorial Correction for TS 23.304","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the word \u2018discoverer\u2019 from the path information in multihup U2U Model A Discovery. Clarify the path information in the step 4a in clause 6.3.2.5.3 is an (ordered) list of User Info ID(s) of Intermediate UE-to-Network Relay(s) in the path that has relayed the Solicitation message. Typo fix.","secretary_remarks":"Revision of S2-2506792. Revised in parallel session to S2-2508008.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13890,"status":"revised","reservation_date":"2025-08-28 10:38:41","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2506792","revisedto":"S2-2508008","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":558.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507870.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"5.8.6.3, 6.3.2.5, 5.4.4.2, 5.4.5.2, 5.6.2.4.2, 5.6.3.1, 5.8.3.1, 6.3.2.6.1, 6.4.3.8.3, 6.4.3.9.1, 6.4.3.10.2, 6.7.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507871","title":"Clarification on additional parameters announcement request","source":"LG Electronics, Qualcomm Incorporated","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 6.3.2.5.4 - Remove Relay Service Code and Root Relay Info in step 2","secretary_remarks":"Revision of S2-2506197. Agreed in parallel session. Block approved","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13990,"status":"agreed","reservation_date":"2025-08-28 10:38:43","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2506197","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":555.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250945","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507871.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"6.3.2.5.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2507872","title":"Reply LS on parameters for ProSe additional parameters announcement request message","source":"SA WG2","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1. Attachments: TS 23.304 CR#0555","secretary_remarks":"Revision of S2-2506198. Agreed in parallel session. Block approved","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13970,"status":"approved","reservation_date":"2025-08-28 10:38:43","uploaded":"2025-09-01 14:21:09","revisionof":"S2-2506198","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2506121","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507872.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2508008","title":"Clarification on the path information in 5G ProSe multi-hop discovery procedures and Editorial Correction for TS 23.304","source":"Huawei, HiSilicon, KPN N.V., Qualcomm Incorporated, ZTE, Samsung","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the word \u2018discoverer\u2019 and L2 ID from the path information in multihup U2U Model A Discovery. Clarify the path information of Model B multtihop U2N relay is (ordered) list of User Info ID(s) and the corresponding L2 ID(s) of Intermediate UE-to-Network Relay(s) in the path. Typo fix.","secretary_remarks":"Revision of S2-2507870. Agreed in parallel session. Block approved","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13900,"status":"agreed","reservation_date":"2025-08-28 10:39:38","uploaded":"2025-09-01 14:21:10","revisionof":"S2-2507870","revisedto":"","release":"Rel-19","crspec":"23.304","crspecversion":"19.4.0","workitem":[{"winame":"5G_ProSe_Ph3"}],"crnumber":558.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250945","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2508008.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"5.8.6.3, 6.3.2.5, 5.4.4.2, 5.4.5.2, 5.6.2.4.2, 5.6.3.1, 5.8.3.1, 6.3.2.6.1, 6.4.3.8.3, 6.4.3.9.1, 6.4.3.10.2, 6.7.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2508009","title":"Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"Revision of S2-2507869. Revised in parallel session to S2-2508101.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13830,"status":"revised","reservation_date":"2025-08-28 10:39:39","uploaded":"2025-09-01 14:21:10","revisionof":"S2-2507869","revisedto":"S2-2508101","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2508009.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2508101","title":"Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"Samsung","contact":"Naman Gupta","contact-id":93866,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"Revision of S2-2508009. Revised in parallel session to S2-2508102.","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13840,"status":"revised","reservation_date":"2025-08-30 06:07:42","uploaded":"2025-09-01 14:21:12","revisionof":"S2-2508009","revisedto":"S2-2508102","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2508101.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2508102","title":"Reply LS on the path information in 5G ProSe multi-hop discovery procedures","source":"SA WG2","contact":"Naman Gupta","contact-id":93866,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1 Attachments: 23.304 CR 0558","secretary_remarks":"Revision of S2-2508101. Agreed in parallel session. Block approved","agenda_item_sort_order":118,"ainumber":"19.7.2","ainame":"System Enhancement for Proximity-based Services in 5GS - Phase 3 (5G_ProSe_Ph3)","tdoc_agenda_sort_order":13850,"status":"approved","reservation_date":"2025-08-30 06:07:42","uploaded":"2025-09-01 14:21:12","revisionof":"S2-2508101","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2506119","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2508102.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]