[{"name":"S2-2501457","title":"Discussion on Energy Saving Indicator.","source":"Nokia, Deutsche Telekom","contact":"Alessio Casati","contact-id":82456,"tdoctype":"discussion","for":"Discussion","abstract":"Discussion on Energy Saving Indicator","secretary_remarks":"Revision of (Noted) S2-2500227. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16150,"status":"noted","reservation_date":"2025-02-06 14:52:58","uploaded":"2025-02-10 10:58:53","revisionof":"S2-2500227","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501457.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501458","title":"Resolution of editor's note on whether the Energy Saving indicator is one value or multiple values.","source":"Nokia, Deutsche Telekom","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Based on the resoning in DP in S2-2501457 the CR proceeds to consider the indicator to be a scalar with 16 values, whose value is set by the operator and associated to a configurable behaviour. There is no doubt the indicator will be stored in the UDR also. Note 2 is updated taking into account the normative text above already says 3GPP does not specify how the indicator is used.","secretary_remarks":"Revision of (Postponed) S2-2500344. Revised in parallel session to S2-2502307.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16120,"status":"revised","reservation_date":"2025-02-06 14:56:41","uploaded":"2025-02-10 10:58:53","revisionof":"S2-2500344","revisedto":"S2-2502307","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5927.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501458.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.51.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501466","title":"Resolution of editor's note on PCF taking EIF information into account","source":"Nokia, ZTE, Deutsche Telekom, Qualcomm Inc, Ericsson,","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR removes the editor's note and clarifies that Energy Saving Indicator can be sent also in an AM policy association modification procedure (e.g. if a subscription is updated).","secretary_remarks":"Revision of (Noted) S2-2500351. Revised in parallel session to S2-2502309, merging S2-2502169","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16380,"status":"revised","reservation_date":"2025-02-06 16:20:56","uploaded":"2025-02-10 10:58:53","revisionof":"S2-2500351","revisedto":"S2-2502309","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5928.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501466.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501467","title":"Update of the Energy consumption calculation formulae","source":"Nokia","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The formual for the calculation of the energy consumed per session at a UPF is corrected The confusing = is removed from the calculation of energy for a UE. It is also considered helpful to highlight that the formulae at single gNb and single UPF level are including a term that is a measure of the efficiency in the time interval of the gNB and the UPF respectively. The teminology is aligned.","secretary_remarks":"Revised in parallel session to S2-2502316.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16710,"status":"revised","reservation_date":"2025-02-06 16:31:02","uploaded":"2025-02-10 10:58:53","revisionof":"","revisedto":"S2-2502316","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6071.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501467.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501507","title":"Policy control with energy saving consideration.","source":"[Vivo, Qualcomm Incorporated, MediaTek Inc, ZTE, Deutsche Telekom, CATT], Samsung","contact":"Dongeun Suh","contact-id":84836,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add slice replacement management as an examples of impacted AM policy Enable UE Policy Association for the PCRT for Energy Saving indicator","secretary_remarks":"Revision of (Agreed) S2-2501214. Merged into S2-2502315","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16500,"status":"merged","reservation_date":"2025-02-07 02:00:54","uploaded":"2025-02-10 09:25:49","revisionof":"S2-2501214","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501507.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501511","title":"Update for Nudm service operation consumer","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding EIF as consumer of Nudm_UECM_Get service operation.","secretary_remarks":"Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16900,"status":"agreed","reservation_date":"2025-02-07 03:36:28","uploaded":"2025-02-10 11:04:52","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5337.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501511.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501512","title":"Clarification regarding energy collection and exposure","source":"[Huawei, HiSilicon, ETRI], China Mobile,","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects. Add a new SMF event exposure to support energy consumption exposure and calculation.","secretary_remarks":"Revision of (Agreed) S2-2501211. Revised in parallel session to S2-2502356.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16910,"status":"revised","reservation_date":"2025-02-07 03:39:51","uploaded":"2025-02-10 11:06:34","revisionof":"S2-2501211","revisedto":"S2-2502356","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501512.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29, 5.2.8.1, 5.2.8.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501540","title":"Resolving EN for the multiple values of Energy Saving indicator","source":"Samsung","contact":"Dongeun Suh","contact-id":84836,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add NOTE saying 'The indicator is expected to select an energy saving strategy for the UE in the system.'","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16160,"status":"noted","reservation_date":"2025-02-07 09:25:07","uploaded":"2025-02-10 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6076.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501540.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501542","title":"Resolving EN on the Energy Saving indicator in UDR","source":"Samsung","contact":"Dongeun Suh","contact-id":84836,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: -Clarify that the subscription data for a UE in UDR may include the indicator. -Removal of the corresponding EN","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16250,"status":"noted","reservation_date":"2025-02-07 09:29:27","uploaded":"2025-02-10 09:41:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6078.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501542.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501548","title":"Correction on Energy Saving indicator","source":"Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 'Energy Saving indicator' is corrected to 'Energy Saving Allowed UE indicator' with the corresponding description. The title format of 5.51.6 is elevated.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16180,"status":"noted","reservation_date":"2025-02-07 11:03:03","uploaded":"2025-02-10 18:10:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6079.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501548.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.5, 5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501549","title":"Policy control with energy saving consideration.","source":"[Vivo, Qualcomm Incorporated, MediaTek Inc, ZTE, Deutsche Telekom, CATT], Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF In rev 3: 'Energy Saving indicator' is corrected to 'Energy Saving Allowed UE indicator'.","secretary_remarks":"Revision of (Agreed) S2-2501214. Merged into S2-2502315","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16490,"status":"merged","reservation_date":"2025-02-07 11:07:27","uploaded":"2025-02-10 18:10:16","revisionof":"S2-2501214","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501549.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501550","title":"Energy saving subscription and AM policy.","source":"[Vivo, Qualcomm Incorporated, ZTE, Deutsche Telekom, CATT], Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the AM policy creation considering the Energy Saving indicator In rev 2: 'Energy Saving indicator' is corrected to 'Energy Saving Allowed UE indicator'.","secretary_remarks":"Revision of (Agreed) S2-2501215. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16210,"status":"noted","reservation_date":"2025-02-07 12:13:09","uploaded":"2025-02-10 18:10:16","revisionof":"S2-2501215","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5276.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501550.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501551","title":"Energy Saving indicator","source":"[Ericsson, AT&T, Deutsche Telekom, NEC], Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration and UE triggered service request procedures. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN In rev 3: 'Energy Saving indicator' is corrected to 'Energy Saving Allowed UE indicator'.","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16270,"status":"merged","reservation_date":"2025-02-07 12:14:13","uploaded":"2025-02-10 18:10:16","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501551.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501556","title":"Discussion on Energy Saving Indicator","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Approval","abstract":"Discussion on Energy Saving Indicator","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16230,"status":"noted","reservation_date":"2025-02-07 14:09:58","uploaded":"2025-02-10 12:58:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501556.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501557","title":"Energy saving indicator","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The following changes are proposed: - change of the name to UE Energy Saving Indicator, - added the specification that the AMF provides the indication to enabling\/disabling the sending of the UE Energy Saving Indicator from AMF to gNB is provided by PCF. T","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16240,"status":"not treated","reservation_date":"2025-02-07 14:09:58","uploaded":"2025-02-10 12:58:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6081.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501557.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501558","title":"Policy control with energy saving consideration","source":"[vivo], [Qualcomm Incorporated], [MediaTek Inc], [ZTE], [Deutsche Telekom], [CATT], [Samsung], Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the UE Energy Saving indicator reported by AMF The changes to the CR version are: - change of the name to UE Energy Saving Indicator, - added the specification that the AMF provides the indication to enabling\/disabling the sending of the UE Energy Saving Indicator from AMF to gNB is provided by PCF. T","secretary_remarks":"Revision of (Agreed) S2-2501214. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16510,"status":"noted","reservation_date":"2025-02-07 14:09:59","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2501214","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501558.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501559","title":"Energy saving subscription and AM policy.","source":"[vivo], [Qualcomm Incorporated], [ZTE], [Deutsche Telekom], [CATT], [Samsung], Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the AM policy creation considering the UE Energy Saving indicator","secretary_remarks":"Revision of (Agreed) S2-2501215. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16220,"status":"noted","reservation_date":"2025-02-07 14:09:59","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2501215","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5276.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501559.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501560","title":"Energy Saving indicator","source":"[Ericsson], [AT&T], [Deutsche Telekom], [NEC], [Samsung]. Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding UE Energy Savings Indicator to the general registration and UE triggered service request procedures. The UE Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN The changes to the CR version are: - change the name of indicator to UE Energy Saving indicator - added the PCF control to indicates to AMF whether to send the UE Energy Saving indicator to gNB - addition of new indicator in AM policy","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16260,"status":"merged","reservation_date":"2025-02-07 14:10:01","uploaded":"2025-02-10 13:21:23","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501560.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501561","title":"Discussion on event reporting","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Approval","abstract":"Discussion on event reporting","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16950,"status":"not treated","reservation_date":"2025-02-07 14:10:01","uploaded":"2025-02-10 12:58:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501561.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501562","title":"Clarification regarding energy collection and exposure","source":"Huawei, HiSilicon, [ETRI]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects.","secretary_remarks":"Revision of (Agreed) S2-2501211 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16960,"status":"not treated","reservation_date":"2025-02-07 14:10:01","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2501211","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501562.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29, 5.2.8.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501563","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding clarification on the EventExposure service operation of SMF.","secretary_remarks":"Revision of (Noted) S2-2500812 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16990,"status":"not treated","reservation_date":"2025-02-07 14:10:02","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2500812","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5288.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501563.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.8.1, 5.2.8.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501564","title":"Clarification regarding energy collection and exposure","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the QoS-flow-level granularity is actually the service data flow granularity 1. Add the preamble text in 5.51.2 for referring 23.502. And additionally move the 'collection time period T' to the next sub clause. 2. Clarify the application-level granularity is supported while it is in fact per-UE-per-application. 3. Clarify the QoS flow level granularity is actually for the service data flow. And add a note for the clarification. 4. Update the equation used in Annex.","secretary_remarks":"Revision of (Noted) S2-2500810. Merged into S2-2502355","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16770,"status":"merged","reservation_date":"2025-02-07 14:10:03","uploaded":"2025-02-10 13:17:56","revisionof":"S2-2500810","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6008.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501564.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2, Annex T","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501565","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. correction on the table for SMF provided information; 2. correction on the equation in the annex; 3. other clarifications.Adding clarification on the EventExposure service operation of SMF.","secretary_remarks":"Revision of (Postponed) S2-2500813. Revised in parallel session to S2-2502317, merging S2-2502050 and S2-2501730","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16780,"status":"revised","reservation_date":"2025-02-07 14:10:04","uploaded":"2025-02-10 13:17:56","revisionof":"S2-2500813","revisedto":"S2-2502317","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6010.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501565.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, Annex T5.31.9, 5.51.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501566","title":"Corrections for energy saving related AF input on BDT policy negotiation","source":"Huawei, HiSilicon [, NTT DOCOMO]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The ASP indicator is renamed to 'energy saving indicator' and its usage by the PCF during the detemination of the BDT policy is clarified.","secretary_remarks":"Revision of (Noted) S2-2500819 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16550,"status":"not treated","reservation_date":"2025-02-07 14:10:04","uploaded":"2025-02-10 17:59:26","revisionof":"S2-2500819","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1492.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501566.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501581","title":"Support for S-NSSAI granularity energy consumption exposure","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for S-NSSAI per UE granularity energy consumption exposure plus some cleanup.","secretary_remarks":"Revision of (Postponed) S2-2500455. Revised in parallel session to S2-2502360.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17170,"status":"revised","reservation_date":"2025-02-07 16:16:54","uploaded":"2025-02-10 18:37:06","revisionof":"S2-2500455","revisedto":"S2-2502360","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5956.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501581.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1; 5.51.2.2; 5.51.2.3; 5.51.2.4; Annex T2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501582","title":"Support for S-NSSAI granularity energy consumption exposure","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for S-NSSAI per UE granularity energy consumption exposure.","secretary_remarks":"Revision of (Noted) S2-2500456. Revised in parallel session to S2-2502361.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17200,"status":"revised","reservation_date":"2025-02-07 16:18:51","uploaded":"2025-02-10 18:37:32","revisionof":"S2-2500456","revisedto":"S2-2502361","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5244.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501582.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29.1; 2.29.2; 5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501583","title":"Energy Saving indicator","source":"NEC [Ericsson, AT&T, Deutsche Telekom, NEC, Samsung]","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration and UE triggered service request procedures. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN 07\/02\/2025 Revision - change of 'Energy Saving Indicator' to 'UE subject to Energy Saving Indicator'","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16280,"status":"merged","reservation_date":"2025-02-07 16:21:40","uploaded":"2025-02-10 18:38:01","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501583.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501584","title":"Energy saving subscription and AM policy.","source":"NEC [Vivo, Qualcomm Incorporated, ZTE, Deutsche Telekom, CATT, Samsung]","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the AM policy creation considering the Energy Saving indicator 07\/02\/2025 Revision - change of 'Energy Saving Indicator' to 'UE subject to Energy Saving Indicator'","secretary_remarks":"Revision of (Agreed) S2-2501215. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16200,"status":"noted","reservation_date":"2025-02-07 16:23:27","uploaded":"2025-02-10 18:38:26","revisionof":"S2-2501215","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5276.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501584.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501603","title":"Energy Saving indicator","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 'Energy Saving indicator' is renamed to 'UE subject to Energy Saving Indicator'","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16190,"status":"noted","reservation_date":"2025-02-07 16:27:54","uploaded":"2025-02-10 18:40:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6088.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501603.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.5, 5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501605","title":"Energy Attribution sensitivity and robustness","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"This contribution discusses the sensitivity and robustness of the current formulas for attribution of energy consumption to a UE or finer granularity.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16750,"status":"noted","reservation_date":"2025-02-07 16:40:17","uploaded":"2025-02-10 22:05:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501605.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501606","title":"Energy Saving Indicator","source":"Ericsson, AT&T, Deutsche Telekom, [NEC,] Samsung","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration, UE triggered service request procedures, AM subscription data and UE context. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN","secretary_remarks":"Revision of (Agreed) S2-2501216. Revised in parallel session to S2-2502306, merging S2-2502165, S2-2501719, S2-2501715, S2-2501583, S2-2501560 and S2-2501551","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16290,"status":"revised","reservation_date":"2025-02-07 16:40:17","uploaded":"2025-02-10 22:05:17","revisionof":"S2-2501216","revisedto":"S2-2502306","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":6.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501606.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501690","title":"Policy control with energy saving consideration","source":"Vivo, [Qualcomm Incorporated], MediaTek Inc, [ZTE, Deutsche Telekom, CATT, Samsung]","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF. Revison: And descriptions for policy control according to the energy related information from EIF.","secretary_remarks":"Revision of (Agreed) S2-2501214. Revised in parallel session to S2-2502315, merging S2-2501830, S2-2501549 and S2-2501507","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16440,"status":"revised","reservation_date":"2025-02-08 07:53:48","uploaded":"2025-02-10 11:15:02","revisionof":"S2-2501214","revisedto":"S2-2502315","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501690.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501691","title":"Architecture and interface update with EIF","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the architecture of policy and charging control framework for the 5G System to include the EIF; Add the descriptions about the interactions between PCF and EIF for policy control","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17300,"status":"noted","reservation_date":"2025-02-08 07:53:49","uploaded":"2025-02-10 11:15:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1512.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501691.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501712","title":"An update to Suspicion of DDoS attack","source":"Verizon","contact":"Peretz Feder","contact-id":94345,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Deviation from the energy consumption norm is provided by NFs and\/or OAM when the monitored energy consumption crosses threshold levels and\/or rules defined by the operator. When the energy consumption norm is crossed (as indicated by NF rules and\/or OAM), DDoS attack scenario can be suspected as one of the reasons. Such trigger can have the NWDAF access the EIF to obtain UE(s) related energy consumption information to determine abnormal\/normal behaviour.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17310,"status":"noted","reservation_date":"2025-02-09 06:03:54","uploaded":"2025-02-10 03:55:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.288","crspecversion":"19.1.0","workitem":[{"winame":"EnergySys"}],"crnumber":1390.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501712.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":" 6.7.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501713","title":"Update on EIF services to solve the Editor's notes","source":"vivo, MediaTek Inc.","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.2.28.1, the PCF is added as the consumer NF for EIF services to solve the Editor's note. In clause 5.2.28.2.2, regards to the Editor's note, it is proposed that the AF may provide the reporting threshold for Neif_EventExposure _Subscribe. Other editorial changes are proposed.","secretary_remarks":"Revised in parallel session to S2-2502358.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17020,"status":"revised","reservation_date":"2025-02-09 07:34:10","uploaded":"2025-02-10 14:10:39","revisionof":"","revisedto":"S2-2502358","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5351.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501713.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.1, 5.2.28.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501714","title":"Clarification regarding energy collection and exposure","source":"[Huawei, HiSilicon, ETRI], vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects. In rev 4, the per UE per application granularity of energy consumption information is added to the procedure in clause 4.29.2 and EIF service in clause 5.2.28.2.1.","secretary_remarks":"Revision of (Agreed) S2-2501211 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16970,"status":"not treated","reservation_date":"2025-02-09 07:38:23","uploaded":"2025-02-10 14:10:39","revisionof":"S2-2501211","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501714.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29, 5.2.8.1, 5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501715","title":"Energy Saving indicator","source":"[Ericsson, AT&T, Deutsche Telekom, NEC, Samsung], vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration and UE triggered service request procedures. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN. In rev 7, the description in clause 5.2.2.2.2 and 5.2.3.3.1 is updated according to TS 23.501.","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16320,"status":"merged","reservation_date":"2025-02-09 07:43:12","uploaded":"2025-02-10 14:10:39","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":7.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501715.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501716","title":"Update on SMF services","source":"vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: According to clause 5.51.2 in TS23.501, it is proposed to add the descriptions about reporting gNB ID(s) and (I-)UPF ID(s) to EIF for the required granularity in clause 5.2.8.3.2.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17000,"status":"noted","reservation_date":"2025-02-09 07:50:00","uploaded":"2025-02-10 14:10:39","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5352.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501716.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.8.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501717","title":"Update on energy consumption information collection and exposure to solve the Editor's notes","source":"vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.51.2.4, regards to the first Editor's note, the AF may provide the reporting threshold for energy consumption exposure. Time period of the collected information is added in Table 5.51.2.2-2. Other editorial changes are proposed.","secretary_remarks":"Revised in parallel session to S2-2502357, merging S2-2502047","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16850,"status":"revised","reservation_date":"2025-02-09 08:01:06","uploaded":"2025-02-10 14:10:39","revisionof":"","revisedto":"S2-2502357","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6100.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501717.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.2, 5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501718","title":"Update on subscription information and policy control aspects","source":"vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.51.5, it is proposed to add the descriptions related with the energy saving indicators. In clause 5.51.6, regards to the Editor's note, the paper proposes that the EIF notification to PCF is needed for better policy control.","secretary_remarks":"Revision of (Noted) S2-2500771. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16410,"status":"noted","reservation_date":"2025-02-09 08:09:07","uploaded":"2025-02-10 14:10:39","revisionof":"S2-2500771","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5999.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501718.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.5, 5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501719","title":"Energy Saving indicator","source":"[Ericsson, AT&T, Deutsche Telekom, NEC, Samsung] China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration and UE triggered service request procedures. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN Removing Editor's Notes on Energy Saving Indicator provision to NG-RAN. Adding Energy Saving Indicator to handover procedures.","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16330,"status":"merged","reservation_date":"2025-02-09 14:07:07","uploaded":"2025-02-10 11:06:34","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":8.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501719.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1, 4.9.1.2.2, 4.9.1.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501720","title":"Update for BDT based on network energy related information","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: During the procedure of BDT warning notification, adding AF subscribes energy consumption information. And AF may check and select the BDT policy according to energy related information.","secretary_remarks":"Merged into S2-2502312","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16590,"status":"merged","reservation_date":"2025-02-09 14:09:20","uploaded":"2025-02-10 11:06:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6101.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501720.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501721","title":"Update for BDT based on network energy related information","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: During the procedure of BDT warning notification, adding AF subscribes energy consumption information. And AF may check and select the BDT policy according to energy related information.","secretary_remarks":"Revised in parallel session to S2-2502311.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16570,"status":"revised","reservation_date":"2025-02-09 14:10:54","uploaded":"2025-02-10 11:06:34","revisionof":"","revisedto":"S2-2502311","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1513.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501721.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501730","title":"Clarification regarding energy collection and exposure","source":"ETRI, CATT","contact":"Changki Kim","contact-id":52169,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding clarification on the Energy Comsumption Information collection. This CR proposes to further update the document regarding the following aspects: Add a clear description on the Energy Comsumption Information collection between EIF, SMF and UPF.","secretary_remarks":"Merged into S2-2502317","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16840,"status":"merged","reservation_date":"2025-02-09 15:11:20","uploaded":"2025-02-10 08:39:30","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6102.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501730.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501753","title":"Clarification regarding energy collection and exposure","source":"[Huawei, HiSilicon], ETRI, CATT","contact":"Changki Kim","contact-id":52169,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects.","secretary_remarks":"Revision of (Agreed) S2-2501211 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16980,"status":"not treated","reservation_date":"2025-02-09 15:32:19","uploaded":"2025-02-10 08:42:16","revisionof":"S2-2501211","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501753.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29, 5.2.8.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501774","title":"Enhancement for BDT with Energy related information","source":"KDDI","contact":"Kenichi Yamamoto","contact-id":81598,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce an Enhancement for BDT considering the Energy Consumption information.","secretary_remarks":"Revision of (Noted) S2-2500587. Revised in parallel session to S2-2502313, merging S2-2502001","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16620,"status":"revised","reservation_date":"2025-02-10 01:19:34","uploaded":"2025-02-10 12:22:02","revisionof":"S2-2500587","revisedto":"S2-2502313","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5256.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501774.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.16.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501775","title":"Resolving ENs in Clause 5.51.5 and 5.51.6","source":"MediaTek Inc., vivo, CATT","contact":"Chia-Lin Lai","contact-id":80967,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To resolve ENs based on below changes: The energy saving indicator can be stored in UDR The PCF can be notified by EIF with the energy related information","secretary_remarks":"Revision of (Postponed) S2-2500748 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16420,"status":"not treated","reservation_date":"2025-02-10 01:28:32","uploaded":"2025-02-10 06:47:11","revisionof":"S2-2500748","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5996.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501775.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.5, 5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501825","title":"Clarification on support of Energy Efficiency and Energy Saving","source":"CATT, ETRI","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the EIF may collect and expose Energy Consumption information per application level to the AF. Clarify that the EIF may decide the SUPIs of the UEs for which to collect Energy Consumption information via the AMF. Correct some typos in the formulas in Annex T.2.","secretary_remarks":"Revision of (Noted) S2-2500840. Merged into S2-2502355","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16740,"status":"merged","reservation_date":"2025-02-10 04:18:01","uploaded":"2025-02-10 09:05:34","revisionof":"S2-2500840","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6014.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501825.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3, 5.51.2.4, Annex T.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501826","title":"Data collection for energy information calculation and exposure","source":"CATT, ETRI","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Enhance EventExposure services of SMF to support providing event notifications to the EIF for energy consumption information calculation and exposure.","secretary_remarks":"Revision of (Agreed) S2-2501212. Postponed in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17070,"status":"postponed","reservation_date":"2025-02-10 04:18:05","uploaded":"2025-02-10 09:05:34","revisionof":"S2-2501212","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5160.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501826.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.8.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501828","title":"Energy related subscription data and policy control","source":"CATT","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions on how the PCF makes policy decisions based on Energy Saving indicator, energy consumption information notifications, and energy saving policy control subscription information in UDR. Add description of energy saving policy control subscription information stored in the UDR.","secretary_remarks":"Revision of (Merged) S2-2500844. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16370,"status":"noted","reservation_date":"2025-02-10 04:18:07","uploaded":"2025-02-10 09:05:34","revisionof":"S2-2500844","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1403.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501828.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.3.6, 6.1.3.20, 6.2.1.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501830","title":"Policy control with energy saving consideration.","source":"[vivo, Qualcomm Incorporated, MediaTek Inc, ZTE, Deutsche Telekom,] CATT, [Samsung]","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF. Add descriptions for policy control taking into account also the Energy Consumption information notifications from the EIF.","secretary_remarks":"Revision of (Agreed) S2-2501214. Merged into S2-2502315","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16480,"status":"merged","reservation_date":"2025-02-10 04:25:13","uploaded":"2025-02-10 09:05:34","revisionof":"S2-2501214","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":6.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501830.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.2.1.1, 6.1.2.5, 6.2.1.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501833","title":"Update for BDT based on network energy related information","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: During the procedure of BDT warning notification, adding AF subscribes energy consumption information. And AF may check and select the BDT policy according to energy related information.","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16640,"status":"not treated","reservation_date":"2025-02-10 04:42:03","uploaded":"2025-02-10 11:06:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5363.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501833.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.16.7.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501838","title":"Clean up the architecture and interface for energysys","source":"Qualcomm Incorporated, Nokia, Ericsson","contact":"Juan Zhang","contact-id":73274,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add SA WG5 related spec in clause 2 reference. Removal of the reference points between EIF and PCF in clause 4.2.7. Clarification that roaming architecture is not supported in this release in clause 4.2.18.1","secretary_remarks":"Revision of (Postponed) S2-2500189. Revised in parallel session to S2-2502363.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17260,"status":"revised","reservation_date":"2025-02-10 05:33:56","uploaded":"2025-02-10 06:49:50","revisionof":"S2-2500189","revisedto":"S2-2502363","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5900.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501838.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.2.7, 4.2.18.1, 6.3.27","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501895","title":"Discussion on QoS Flow vs. Service Data Flow granularity","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Approval","abstract":"Discussion on QoS Flow vs. Service Data Flow granularity.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16760,"status":"noted","reservation_date":"2025-02-10 09:00:23","uploaded":"2025-02-10 17:59:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501895.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501957","title":"Energy Saving indicator for UE Policy","source":"Samsung","contact":"Dongeun Suh","contact-id":84836,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The PCF may receive the indicator from the AMF during UE Policy association.","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16520,"status":"not treated","reservation_date":"2025-02-10 10:24:44","uploaded":"2025-02-10 10:35:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6138.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501957.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501997","title":"Resolving editor's note on the interface between EIF and OAM","source":"NTT DOCOMO","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Resolving the editor's note on the interface between EIF and OAM - Adding a NOTE to mention SA WG5 solution to implement interface between OAM and EIF - Adding required SA WG5 specification as references","secretary_remarks":"Revision of (Noted) S2-2500357. Merged into S2-2502573","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17280,"status":"merged","reservation_date":"2025-02-10 11:20:44","uploaded":"2025-02-10 13:14:52","revisionof":"S2-2500357","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5930.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501997.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501998","title":"Updating EIF service operations","source":"NTT DOCOMO[, Deutsche Telekom, Vivo, China Mobile]","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Target of Event Reporting is clarified in clause 5.2.28.2.1 - Outputs of the EIF Notify service operation is generalized and aligned with the definition of the Notify service of other NFs In revision 1: - A new optional input parameter is introduced for distinguishing energy consumption reported in RAN and Core","secretary_remarks":"Revision of (Revised) S2-2500358. Noted in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17010,"status":"noted","reservation_date":"2025-02-10 11:22:35","uploaded":"2025-02-10 13:19:29","revisionof":"S2-2500358","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5239.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501998.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.1, 5.2.28.2.2, 5.2.28.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502000","title":"Resolving Roaming editor's note in the architecture","source":"NTT DOCOMO","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - The editor's note on the supporting roaming is resolved. - It is explicitly mentioned that roaming is not supported in this release of specification for energy saving and energy efficiency.","secretary_remarks":"Revision of (Noted) S2-2500356. Merged into S2-2502573","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17290,"status":"merged","reservation_date":"2025-02-10 11:26:13","uploaded":"2025-02-10 13:23:22","revisionof":"S2-2500356","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5929.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502000.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502001","title":"Negotiation for future background data transfer considering energy","source":"NTT DOCOMO","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Adding consideration of energy-related information in BDT negotiation in the case of indication by AF. - Clarifying the interaction between PCF and NWDAF in the procedure figure. - Adding reference to SA WG5 specification","secretary_remarks":"Revision of (Postponed) S2-2500359. Merged into S2-2502313","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16650,"status":"merged","reservation_date":"2025-02-10 11:28:12","uploaded":"2025-02-10 13:26:15","revisionof":"S2-2500359","revisedto":"S2-2503125","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5240.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502001.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502002","title":"Corrections for energy saving related AF input on BDT policy negotiation","source":"[Huawei, HiSilicon,] NTT DOCOMO","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Renaming of 'Energy Indicator' to 'Energy Saving Indicator' - Clarifying the purpose of the indicator","secretary_remarks":"Revision of (Noted) S2-2500819. Revised in parallel session to S2-2502310.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16530,"status":"revised","reservation_date":"2025-02-10 11:31:05","uploaded":"2025-02-10 13:28:41","revisionof":"S2-2500819","revisedto":"S2-2502310","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1492.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502002.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502022","title":"Energy-Efficient User Plane for 6G Core Service-Based Architecture Leveraging Nndwaf_MLModelProvision Service","source":"IIT, Kharagpur","contact":"Aneek Adhya","contact-id":93460,"tdoctype":"discussion","for":"Discussion","abstract":"In this contribution, we propose a system and mechanism to realize a green energy-efficient 6G core by efficiently selecting a UPF among a plurality of UPF nodes to be allocated for each new application flow. Specifically, we propose the introduction of an Energy Efficiency Module (EEM) within the Network Data Analytics Function (NWDAF), which is responsible for gathering historical energy consumption data for each UPF associated with the network. Using a Long Short Term Memory (LSTM), the probable energy consumption for each UPF is predicted in the next instant. The UPF predicted to consume the least energy is selected to be the anchor UPF. The contribution also proposes the inclusion of the 'Nnwdaf_MLModelProvision' service into the 'Procedure for UE Communication analytics' through appropriate service flows by integrating the EEM service flow sequences as detailed in figure 5.7.7-1 titled 'Procedure for UE Communication Analytics', in 3GPP TS 29.552 v19.0.0 (2024-09).","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17320,"status":"not treated","reservation_date":"2025-02-10 12:36:19","uploaded":"2025-02-10 12:54:43","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"EnergySys"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502022.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502042","title":"Adding per UE per Application level Energy consumption exposure","source":"ZTE, China Mobile, NTT DOCOMO, Vivo","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Application lelvel Energy consumption calculation and exposure","secretary_remarks":"Revision of (Postponed) S2-2500886. Revised in parallel session to S2-2502355, merging S2-2501825 and S2-2501564","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17080,"status":"revised","reservation_date":"2025-02-10 12:48:08","uploaded":"2025-02-10 15:21:46","revisionof":"S2-2500886","revisedto":"S2-2502355","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6028.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502042.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502043","title":"Adding per UE per Application level Energy consumption exposure filter","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding per UE per Application lelvel Energy consumption exposure","secretary_remarks":"Revision of (Postponed) S2-2500887. Revised in parallel session to S2-2502359.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17130,"status":"revised","reservation_date":"2025-02-10 12:48:10","uploaded":"2025-02-10 15:21:46","revisionof":"S2-2500887","revisedto":"S2-2502359","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5299.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502043.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502044","title":"Clarification on the BDT based on network energy related information","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Calrifying the BDT basded on the energy indicator.","secretary_remarks":"Revision of (Noted) S2-2500892. Revised in parallel session to S2-2502312, merging S2-2501720","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16600,"status":"revised","reservation_date":"2025-02-10 12:48:12","uploaded":"2025-02-10 15:21:46","revisionof":"S2-2500892","revisedto":"S2-2502312","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6031.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502044.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502045","title":"Adding Energy indication to BDT procedure and service operation","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding the energy indicator to the BDT related procedure and service operation.","secretary_remarks":"Revision of (Noted) S2-2500893 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16660,"status":"not treated","reservation_date":"2025-02-10 12:48:14","uploaded":"2025-02-10 15:21:46","revisionof":"S2-2500893","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5301.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502045.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.16.7.2, 5.2.5.5.2, 5.2.6.6.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502046","title":"Clarification on the BDT policy decision","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarifying how the PCF make the BDT decision according to the energy indicator.","secretary_remarks":"Revision of (Noted) S2-2500894 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16560,"status":"not treated","reservation_date":"2025-02-10 12:48:15","uploaded":"2025-02-10 15:21:46","revisionof":"S2-2500894","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1496.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502046.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.2.4, 6.1.2.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502047","title":"Resolving the ENs about the Energy Consumption information exposure","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolving the EN on the required parameters and renewable energy information","secretary_remarks":"Merged into S2-2502357","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16890,"status":"merged","reservation_date":"2025-02-10 12:48:16","uploaded":"2025-02-10 16:40:39","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6141.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502047.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502048","title":"Resolving the EN on the UE Energy saving Subscription","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolving the EN on the UE Energy saving Subscription","secretary_remarks":"Revision of (Noted) S2-2500888 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16170,"status":"not treated","reservation_date":"2025-02-10 12:48:17","uploaded":"2025-02-10 16:40:39","revisionof":"S2-2500888","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6029.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502048.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502049","title":"Energy saving indicator to RAN in mobility","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding the Energy saving indicator to RAN.","secretary_remarks":"Revised in parallel session to S2-2502308.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16350,"status":"revised","reservation_date":"2025-02-10 12:48:18","uploaded":"2025-02-10 16:40:39","revisionof":"","revisedto":"S2-2502308","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5370.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502049.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.9.1.2.2, 4.9.1.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502050","title":"Correcting the input and output of SMF exposure for Energy data collection","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Modify the SMF input and output table and Editorial change","secretary_remarks":"Revision of (Noted) S2-2500884. Merged into S2-2502317","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16830,"status":"merged","reservation_date":"2025-02-10 12:48:19","uploaded":"2025-02-10 16:40:39","revisionof":"S2-2500884","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6027.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502050.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502051","title":"Resolve the EN in the architecture clause","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN in the architecture clause","secretary_remarks":"Revised in parallel session to S2-2502362.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17220,"status":"revised","reservation_date":"2025-02-10 12:48:20","uploaded":"2025-02-10 15:21:46","revisionof":"","revisedto":"S2-2502362","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6142.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502051.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.7, 4.2.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502127","title":"Update on the BDT procedures","source":"vivo","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 4.16.7, it is proposed to add the related descriptions that PCF may make the policy decisions based on energy related information.","secretary_remarks":"Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16670,"status":"not treated","reservation_date":"2025-02-10 16:14:51","uploaded":"2025-02-10 16:24:57","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5374.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502127.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.16.7.1, 4.16.7.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502161","title":"BDT Energy Negotiation Procedures","source":"Motorola Mobility UK Ltd., Lenovo","contact":"Konstantinos Samdanis","contact-id":97370,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add energy related information in BDT negotiation procedures.","secretary_remarks":"Revision of S2-2410515 Not Handled","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16680,"status":"not treated","reservation_date":"2025-02-10 19:37:31","uploaded":"2025-02-10 20:47:30","revisionof":"S2-2410515","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5110.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502161.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502164","title":"Energy Enhacements on BDT Policy Control Services","source":"Motorola Mobility UK Ltd., Lenovo","contact":"Konstantinos Samdanis","contact-id":97370,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add energy related information to complement current BDT policy control services.","secretary_remarks":"Revision of S2-2410520. Revised in parallel session to S2-2502314.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16690,"status":"revised","reservation_date":"2025-02-10 20:40:01","uploaded":"2025-02-10 20:47:54","revisionof":"S2-2410520","revisedto":"S2-2502314","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5111.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502164.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502165","title":"Energy Saving indicator","source":"[Ericsson, AT&T, Deutsche Telekom, NEC, Samsung], Lenovo","contact":"Genadi Velev","contact-id":70944,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration and UE triggered service request procedures. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN","secretary_remarks":"Revision of (Agreed) S2-2501216. Merged into S2-2502306","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16340,"status":"merged","reservation_date":"2025-02-10 20:53:46","uploaded":"2025-02-10 22:17:07","revisionof":"S2-2501216","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":9.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502165.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502169","title":"Clean-up on the policy control","source":"Lenovo","contact":"Genadi Velev","contact-id":70944,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The Editor's Note on the notification to PCF is removed.","secretary_remarks":"Merged into S2-2502309","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16430,"status":"merged","reservation_date":"2025-02-10 21:54:53","uploaded":"2025-02-10 22:17:07","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6162.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502169.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.6","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502306","title":"Energy Saving Indicator","source":"Ericsson, AT&T, Deutsche Telekom, NEC, Samsung, China Mobile, Toyota","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration, UE triggered service request procedures, AM subscription data and UE context. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN","secretary_remarks":"Revision of S2-2501606, merging S2-2502165, S2-2501719, S2-2501715, S2-2501583, S2-2501560 and S2-2501551. Revised in parallel session to S2-2502372.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16300,"status":"revised","reservation_date":"2025-02-21 06:41:44","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501606","revisedto":"S2-2502372","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":10.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502306.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502307","title":"Resolution of editor\u2019s note on whether the Energy Saving indicator is one value or multiple values.","source":"Nokia, Deutsche Telekom, NTT Docomo, Verizon","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Based on the resoning in DP in S2-2501457 the CR proceeds to consider the indicator to be a scalar with 16 values, whose value is set by the operator and associated to a configurable behaviour. There is no doubt the indicator will be stored in the UDR also. Note 2 is updated taking into account the normative text above already says 3GPP does not specify how the indicator is used.","secretary_remarks":"Revision of S2-2501458. Revised in parallel session to S2-2502371.<br\/><br\/>Title modified on 25\/02\/2025. Original title : Resolution of editor s note on whether the Energy Saving indicator is one value or multiple values.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Nokia, Deutsche Telekom, NTT Docomo, Verizon","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16130,"status":"revised","reservation_date":"2025-02-21 06:41:44","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501458","revisedto":"S2-2502371","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5927.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502307.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.51.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502308","title":"Energy saving indicator to RAN in mobility","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding the Energy saving indicator to RAN.","secretary_remarks":"Revision of S2-2502049. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16360,"status":"agreed","reservation_date":"2025-02-21 06:41:45","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502049","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5370.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502308.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.9.1.2.2, 4.9.1.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502309","title":"Resolution of editor's note on PCF taking EIF information into account","source":"Nokia, ZTE, Deutsche Telekom, Qualcomm Inc, Ericsson, Lenovo","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR removes the editor's note and clarifies that Energy Saving Indicator can be sent also in an AM policy association modification procedure (e.g. if a subscription is updated).","secretary_remarks":"Revision of S2-2501466, merging S2-2502169. Revised in parallel session to S2-2502373.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16390,"status":"revised","reservation_date":"2025-02-21 06:41:46","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501466","revisedto":"S2-2502373","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5928.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502309.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502310","title":"Corrections for energy saving related AF input on BDT policy negotiation","source":"[Huawei, HiSilicon,] NTT DOCOMO","contact":"Bahador Bakhshi","contact-id":98273,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Clarifying the purpose of the indicator - Adding energy-related information collection from EIF","secretary_remarks":"Revision of S2-2502002. Postponed in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16540,"status":"postponed","reservation_date":"2025-02-21 06:41:47","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502002","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1492.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502310.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502311","title":"Update for BDT based on network energy related information","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: During the procedure of BDT warning notification, adding AF subscribes energy consumption information. And AF may check and select the BDT policy according to energy related information.","secretary_remarks":"Revision of S2-2501721. Postponed in parallel session<br\/><br\/>Source modified on 25\/02\/2025. Original source : China Mobile","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16580,"status":"postponed","reservation_date":"2025-02-21 06:41:47","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501721","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1513.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502311.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502312","title":"Clarification on the BDT based on network energy related information","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Calrifying the BDT basded on the energy indicator.","secretary_remarks":"Revision of S2-2502044, merging S2-2501720. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16610,"status":"agreed","reservation_date":"2025-02-21 06:41:48","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502044","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6031.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502312.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502313","title":"Enhancement for BDT with Energy related information","source":"KDDI, NTT DOCOMO, ZTE, China Mobile, vivo, Motorola Mobility UK Ltd., Lenovo, TOYOTA MOTOR CORPORATION","contact":"Kenichi Yamamoto","contact-id":81598,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce an Enhancement for BDT considering the Energy Consumption information.","secretary_remarks":"Revision of S2-2501774, merging S2-2502001. Postponed in parallel session<br\/><br\/>Source modified on 25\/02\/2025. Original source : KDDI, NTT DOCOMO, ZTE, China Mobile, vivo, Motorola Mobility UK Ltd., Lenovo, TOYOTA MOTOR CORPORATION","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16630,"status":"postponed","reservation_date":"2025-02-21 06:41:49","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501774","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5256.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502313.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.16.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502314","title":"Energy Enhacements on BDT Policy Control Services","source":"Motorola Mobility UK Ltd., Lenovo","contact":"Konstantinos Samdanis","contact-id":97370,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add energy related information to complement current BDT policy control services.","secretary_remarks":"Revision of S2-2502164. Withdrawn in parallel session","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16700,"status":"withdrawn","reservation_date":"2025-02-21 06:41:49","uploaded":null,"revisionof":"S2-2502164","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5111.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502315","title":"Policy control with energy saving consideration.","source":"Vivo, [Qualcomm Incorporated], MediaTek Inc, [ZTE, Deutsche Telekom, CATT, Samsung]","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF. Revison: Removes the examples of AM policy parameters created by PCF according to the Energy Saving indicator from AMF And descriptions for policy control according to the energy related information from EIF.","secretary_remarks":"Revision of S2-2501690, merging S2-2501830, S2-2501549 and S2-2501507. Revised in parallel session to S2-2502374.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16450,"status":"revised","reservation_date":"2025-02-21 06:41:50","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501690","revisedto":"S2-2502374","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":7.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502315.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502316","title":"Update of the Energy consumption calculation formulae","source":"Nokia, Huawei, HiSilicon, Vivo","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The formula for the calculation of the energy consumed per session at a UPF is corrected The confusing = is removed from the calculation of energy for a UE. It is also considered helpful to highlight that the formulae at single gNB and single UPF level are including a term that is a measure of the energy consumption per bit in the time interval of the gNB and the UPF respectively. The teminology is aligned.","secretary_remarks":"Revision of S2-2501467. Revised in parallel session to S2-2502376.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16720,"status":"revised","reservation_date":"2025-02-21 06:41:51","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501467","revisedto":"S2-2502376","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6071.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502316.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502317","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. correction on the table for SMF provided information; 2. correction on the equation in the annex; 32. other clarifications.Adding clarification on the EventExposure service operation of SMF. 3. Add a new table for user-plane energy consumption calculation information retrieval.","secretary_remarks":"Revision of S2-2501565, merging S2-2502050 and S2-2501730. Revised in parallel session to S2-2502377.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16790,"status":"revised","reservation_date":"2025-02-21 06:41:52","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501565","revisedto":"S2-2502377","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6010.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502317.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502355","title":"Adding per UE per Application level Energy consumption exposure","source":"ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei,? HiSilicon?","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Application lelvel Energy consumption calculation and exposure","secretary_remarks":"Revision of S2-2502042, merging S2-2501825 and S2-2501564. Revised in parallel session to S2-2502380.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei,? HiSilicon?","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17090,"status":"revised","reservation_date":"2025-02-21 06:42:09","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502042","revisedto":"S2-2502380","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6028.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502355.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502356","title":"Clarification regarding energy collection and exposure","source":"[Huawei, HiSilicon, ETRI], China Mobile,","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects.","secretary_remarks":"Revision of S2-2501512. Revised in parallel session to S2-2502379.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16920,"status":"revised","reservation_date":"2025-02-21 06:42:10","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501512","revisedto":"S2-2502379","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":6.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502356.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502357","title":"Update on energy consumption information collection and exposure to solve the Editor's notes","source":"vivo, ZTE?","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.51.2.4, regards to the first Editor's note, the AF may provide the reporting threshold for energy consumption exposure.","secretary_remarks":"Revision of S2-2501717, merging S2-2502047. Revised in parallel session to S2-2502378.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Vivo, ZTE?","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16860,"status":"revised","reservation_date":"2025-02-21 06:42:11","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501717","revisedto":"S2-2502378","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6100.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502357.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502358","title":"Update on EIF services to solve the Editor's notes","source":"vivo, MediaTek Inc.","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.2.28.2.2, regards to the Editor's note, it is proposed that the AF may provide the reporting threshold for Neif_EventExposure _Subscribe. Other editorial changes are proposed.","secretary_remarks":"Revision of S2-2501713. Revised in parallel session to S2-2502554.<br\/><br\/>Source modified on 25\/02\/2025. Original source : vivo, MediaTek Inc.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17030,"status":"revised","reservation_date":"2025-02-21 06:42:13","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501713","revisedto":"S2-2502554","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5351.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502358.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502359","title":"Adding per UE per Application level Energy consumption exposure filter","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding per UE per Application lelvel Energy consumption exposure","secretary_remarks":"Revision of S2-2502043. Revised in parallel session to S2-2502381.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17140,"status":"revised","reservation_date":"2025-02-21 06:42:14","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502043","revisedto":"S2-2502381","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5299.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502359.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502360","title":"Support for S-NSSAI granularity energy consumption exposure","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for S-NSSAI per UE granularity energy consumption exposure plus some cleanup.","secretary_remarks":"Revision of S2-2501581. Revised in parallel session to S2-2502382.<br\/><br\/>Source modified on 25\/02\/2025. Original source : NEC","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17180,"status":"revised","reservation_date":"2025-02-21 06:42:14","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501581","revisedto":"S2-2502382","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5956.0,"crrevision":2.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502360.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1; 5.51.2.2; 5.51.2.3; 5.51.2.4; Annex T2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502361","title":"Support for S-NSSAI granularity energy consumption exposure","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for S-NSSAI per UE granularity energy consumption exposure.","secretary_remarks":"Revision of S2-2501582. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17210,"status":"agreed","reservation_date":"2025-02-21 06:42:15","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501582","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5244.0,"crrevision":2.0,"crcategory":"C","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502361.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29.1; 2.29.2; 5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502362","title":"Resolve the EN in the architecture clause","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN in the architecture clause","secretary_remarks":"Revision of S2-2502051. Revised in parallel session to S2-2502375.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17230,"status":"revised","reservation_date":"2025-02-21 06:42:16","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502051","revisedto":"S2-2502375","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6142.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502362.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.2.7, 4.2.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502363","title":"Clean up the architecture and interface for energysys","source":"Qualcomm Incorporated, Nokia, Ericsson","contact":"Juan Zhang","contact-id":73274,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the example of consumers for EIF discovery and selection in clause 6.3.27.","secretary_remarks":"Revision of S2-2501838. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17270,"status":"agreed","reservation_date":"2025-02-21 06:42:17","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2501838","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5900.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502363.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502371","title":"Resolution of editor s note on whether the Energy Saving indicator is one value or multiple values.","source":"Nokia, Deutsche Telekom, NTT Docomo, Verizon, Ericsson","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Based on the resoning in DP in S2-2501457 the CR proceeds to consider the indicator , whose value is set by the operator and associated to a configurable behaviour. There is no doubt the indicator will be stored in the UDR also. Note 2 is updated taking into account the normative text above already says 3GPP does not specify how the indicator is used.","secretary_remarks":"Revision of S2-2502307. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16140,"status":"agreed","reservation_date":"2025-02-21 06:42:18","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502307","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5927.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502371.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.51.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502372","title":"Energy Saving Indicator","source":"Ericsson, AT&T, Deutsche Telekom, NEC, Samsung, China Mobile, Toyota, Vivo","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Energy Savings Indicator to the general registration, UE triggered service request procedures, AM subscription data and UE context. The Energy Savings Indicator is retrieved by the AMF from the UDM and passed on to the PCF and RAN","secretary_remarks":"Revision of S2-2502306. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16310,"status":"agreed","reservation_date":"2025-02-21 06:42:18","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502306","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5144.0,"crrevision":11.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502372.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.3.2, 5.2.2.2.2, 5.2.3.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502373","title":"Resolution of editor's note on PCF taking EIF information into account","source":"Nokia, ZTE, Deutsche Telekom, Qualcomm Inc, Ericsson, Lenovo","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR removes the editor's note and clarifies that Energy Saving Indicator can be sent also in an AM policy association modification procedure (e.g. if a subscription is updated).","secretary_remarks":"Revision of S2-2502309. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16400,"status":"agreed","reservation_date":"2025-02-21 06:42:19","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502309","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5928.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502373.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502374","title":"Policy control with energy saving consideration.","source":"Vivo, Qualcomm Incorporated, MediaTek Inc, ZTE, Deutsche Telekom, CATT, Samsung","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF. Revison: Removes the examples of AM policy parameters created by PCF according to the Energy Saving indicator from AMF","secretary_remarks":"Revision of S2-2502315. Revised in parallel session to S2-2502568.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16460,"status":"revised","reservation_date":"2025-02-21 06:42:20","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502315","revisedto":"S2-2502568","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":8.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502374.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502375","title":"Resolve the EN in the architecture clause","source":"ZTE, NTT DOCOMO, China Mobile","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN in the architecture clause","secretary_remarks":"Revision of S2-2502362. Revised in parallel session to S2-2502573, merging S2-2502000 and S2-2501997<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE, NTT DOCOMO, China Mobile","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17240,"status":"revised","reservation_date":"2025-02-21 06:42:21","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502362","revisedto":"S2-2502573","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6142.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502375.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.2.7, 4.2.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502376","title":"Update of the Energy consumption calculation formulae","source":"Nokia, Huawei, HiSilicon, Vivo","contact":"Alessio Casati","contact-id":82456,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The formula for the calculation of the energy consumed per session at a UPF is corrected The confusing = is removed from the calculation of energy for a UE. It is also considered helpful to highlight that the formulae at single gNB and single UPF level are including a term that is a measure of the energy consumption per bit in the time interval of the gNB and the UPF respectively. The teminology is aligned.","secretary_remarks":"Revision of S2-2502316. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16730,"status":"agreed","reservation_date":"2025-02-21 06:42:22","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502316","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6071.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502376.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502377","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon, ETRI, Vivo, CMCC, ZTE","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. correction on the table for SMF provided information; 2. other clarifications. 3. Add a new table for user-plane energy consumption calculation information retrieval.","secretary_remarks":"Revision of S2-2502317. Revised in parallel session to S2-2502569.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon, ETRI, Vivo, CMCC, ZTE","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16800,"status":"revised","reservation_date":"2025-02-21 06:42:23","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502317","revisedto":"S2-2502569","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6010.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502377.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502378","title":"Update on energy consumption information collection and exposure to solve the Editor's notes","source":"vivo, ZTE","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.51.2.4, regards to the first Editor's note, the AF may provide the reporting threshold for energy consumption exposure.","secretary_remarks":"Revision of S2-2502357. Revised in parallel session to S2-2502570.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Vivo, ZTE","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16870,"status":"revised","reservation_date":"2025-02-21 06:42:25","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502357","revisedto":"S2-2502570","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6100.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502378.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502379","title":"Clarification regarding energy collection and exposure","source":"[Huawei, HiSilicon, ETRI], China Mobile,","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects.","secretary_remarks":"Revision of S2-2502356. Revised in parallel session to S2-2502567.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16930,"status":"revised","reservation_date":"2025-02-21 06:42:26","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502356","revisedto":"S2-2502567","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":7.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502379.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502380","title":"Adding per UE per Application level Energy consumption exposure","source":"ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei, HiSilicon","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Application lelvel Energy consumption calculation and exposure","secretary_remarks":"Revision of S2-2502355. Revised in parallel session to S2-2502572.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei, HiSilicon","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17100,"status":"revised","reservation_date":"2025-02-21 06:42:27","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502355","revisedto":"S2-2502572","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6028.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502380.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502381","title":"Adding per UE per Application level Energy consumption exposure filter","source":"ZTE, NEC","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding per UE per Application lelvel Energy consumption exposure","secretary_remarks":"Revision of S2-2502359. Agreed in parallel session. Revised to S2-2502783.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE, NEC","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17150,"status":"revised","reservation_date":"2025-02-21 06:42:28","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502359","revisedto":"S2-2502783","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5299.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502381.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502382","title":"Support for S-NSSAI granularity energy consumption exposure","source":"NEC, Samsung","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for S-NSSAI of the UE granularity energy consumption exposure.","secretary_remarks":"Revision of S2-2502360. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17190,"status":"agreed","reservation_date":"2025-02-21 06:42:29","uploaded":"2025-02-25 15:11:06","revisionof":"S2-2502360","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":5956.0,"crrevision":3.0,"crcategory":"C","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502382.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1; 5.51.2.2; 5.51.2.3; 5.51.2.4; Annex T2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502554","title":"Update on EIF services to solve the Editor's notes","source":"vivo, MediaTek Inc.","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.2.28.2.2, regards to the Editor's note, it is proposed that the AF may provide the reporting threshold for Neif_EventExposure _Subscribe. Other editorial changes are proposed.","secretary_remarks":"Revision of S2-2502358. Revised in parallel session to S2-2502571.<br\/><br\/>Source modified on 25\/02\/2025. Original source : vivo, MediaTek Inc.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17040,"status":"revised","reservation_date":"2025-02-21 06:46:36","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502358","revisedto":"S2-2502571","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5351.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502554.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502567","title":"Clarification regarding energy collection and exposure","source":"Huawei, HiSilicon, ETRI, China Mobile, vivo","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the details of the subscription; Add the details of the requests in the procedure; Modify the interaction between SMF and UPF, i.e., only the PSA UPF. Other editorial aspects.","secretary_remarks":"Revision of S2-2502379. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16940,"status":"agreed","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502379","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5289.0,"crrevision":8.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502567.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.29, 5.2.8.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502568","title":"Policy control with energy saving consideration.","source":"Vivo, Qualcomm Incorporated, MediaTek Inc, ZTE, Deutsche Telekom, CATT, Samsung","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions for policy control according to the Energy Saving indicator reported by AMF.","secretary_remarks":"Revision of S2-2502374. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16470,"status":"agreed","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502374","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":1486.0,"crrevision":9.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502568.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502569","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon, ETRI, Vivo, CMCC, ZTE, Samsung, NEC","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. correction on the table for SMF provided information; 2. other clarifications. 3. Add a new table for user-plane energy consumption calculation information retrieval.","secretary_remarks":"Revision of S2-2502377. Revised in parallel session to S2-2502575.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon, ETRI, Vivo, CMCC, ZTE, Samsung, NEC","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16810,"status":"revised","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502377","revisedto":"S2-2502575","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6010.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502569.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502570","title":"Update on energy consumption information collection and exposure to solve the Editor's notes","source":"Vivo, ZTE, Samsung","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.51.2.4, regards to the first Editor's note, the AF may provide the reporting threshold for energy consumption exposure.","secretary_remarks":"Revision of S2-2502378. Agreed in parallel session. This was block approved.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16880,"status":"agreed","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502378","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6100.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502570.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502571","title":"Update on EIF services to solve the Editor's notes","source":"vivo, MediaTek Inc.","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.2.28.2.2, regards to the Editor's note, it is proposed that the AF may provide the reporting threshold for Neif_EventExposure _Subscribe. Other editorial changes are proposed.","secretary_remarks":"Revision of S2-2502554. Revised in parallel session to S2-2502574.<br\/><br\/>Source modified on 25\/02\/2025. Original source : vivo, MediaTek Inc.","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17050,"status":"revised","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502554","revisedto":"S2-2502574","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5351.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502571.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502572","title":"Adding per UE per Application level Energy consumption exposure","source":"ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei, HiSilicon, CATT","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Application lelvel Energy consumption calculation and exposure","secretary_remarks":"Revision of S2-2502380. Agreed in parallel session. Revised to S2-2502782.<br\/><br\/>Source modified on 25\/02\/2025. Original source : ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei, HiSilicon, CATT","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17110,"status":"revised","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502380","revisedto":"S2-2502782","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6028.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502572.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502573","title":"Resolve the EN in the architecture clause","source":"ZTE, NTT DOCOMO, China Mobile, Huawei, HiSilicon, Nokia","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN in the architecture clause","secretary_remarks":"Revision of S2-2502375, merging S2-2502000 and S2-2501997. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17250,"status":"agreed","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502375","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6142.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502573.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"2, 4.2.7, 4.2.18","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502574","title":"Update on EIF services to solve the Editor's notes","source":"vivo, MediaTek Inc.","contact":"Zhuoyun Zhang","contact-id":106952,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In clause 5.2.28.2.2, regards to the Editor's note, it is proposed that the AF may provide the reporting threshold for Neif_EventExposure _Subscribe.","secretary_remarks":"Revision of S2-2502571. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17060,"status":"agreed","reservation_date":"2025-02-21 06:46:37","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502571","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5351.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502574.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502575","title":"Clarification on the EventExposure service operation of SMF","source":"Huawei, HiSilicon, ETRI, Vivo, CMCC, ZTE, Samsung, NEC, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. correction on the table for SMF provided information; 2. other clarifications. 3. Add a new table for user-plane energy consumption calculation information retrieval.","secretary_remarks":"Revision of S2-2502569. Agreed in parallel session. Block approved","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":16820,"status":"agreed","reservation_date":"2025-02-21 06:46:48","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502569","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6010.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502575.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502782","title":"Adding per UE per Application level Energy consumption exposure","source":"ZTE, China Mobile, NTT DOCOMO, Vivo, NEC, Huawei, HiSilicon, CATT","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding Application lelvel Energy consumption calculation and exposure","secretary_remarks":"Revision of S2-2502572. This CR was agreed","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17120,"status":"agreed","reservation_date":"2025-02-25 11:12:03","uploaded":"2025-02-25 15:11:09","revisionof":"S2-2502572","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"EnergySys"}],"crnumber":6028.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502782.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.51.2.1, 5.51.2.2, 5.51.2.3, 5.51.2.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502783","title":"Adding per UE per Application level Energy consumption exposure filter","source":"ZTE, NEC","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding per UE per Application lelvel Energy consumption exposure","secretary_remarks":"Revision of S2-2502381. This CR was agreed","agenda_item_sort_order":119,"ainumber":"19.4.2","ainame":"5GS Enhancement for Energy Efficiency and Energy Saving (EnergySys)","tdoc_agenda_sort_order":17160,"status":"agreed","reservation_date":"2025-02-25 11:12:05","uploaded":"2025-02-25 15:11:09","revisionof":"S2-2502381","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"EnergySys"}],"crnumber":5299.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-250054","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502783.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.28.2.1","crsinpack":null,"crsinpacknumber":0}]