[{"name":"C1-246216","title":"Work plan for the CT aspects of AIML_CN","source":"vivo","contact":"Yizhong Zhang","contact-id":89297,"tdoctype":"Work Plan","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":221,"ainumber":"19.39","ainame":"AIML_CN","tdoc_agenda_sort_order":62160,"status":"noted","reservation_date":"2024-11-08 13:19:32","uploaded":"2024-11-11 10:17:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG1_mm-cc-sm_ex-CN1\/TSGC1_152_Orlando\/Docs\/C1-246216.zip","group":"C1","meeting":"C1-152","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"C1-246563","title":"Clarification on back-off timer with the analytic of signalling storm","source":"vivo","contact":"Yizhong Zhang","contact-id":89297,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"Source modified on 11\/11\/2024. Original source : vivo\/ Yizhong","agenda_item_sort_order":221,"ainumber":"19.39","ainame":"AIML_CN","tdoc_agenda_sort_order":65630,"status":"revised","reservation_date":"2024-11-11 09:16:54","uploaded":"2024-11-11 10:17:11","revisionof":"","revisedto":"C1-246783","release":"Rel-19","crspec":24.501,"crspecversion":"19.0.0","workitem":[{"winame":"AIML_CN"}],"crnumber":6625.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG1_mm-cc-sm_ex-CN1\/TSGC1_152_Orlando\/Docs\/C1-246563.zip","group":"C1","meeting":"C1-152","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.2, 5.5.1.2.4, 5.5.1.3.4, 8.2.11.5. 8.3.3.2, 8.3.8.2, 8.3.14.2","crsinpack":null,"crsinpacknumber":0},
{"name":"C1-246783","title":"Clarification on back-off timer with the analytic of signalling storm","source":"vivo","contact":"Akansha Arora","contact-id":98687,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":221,"ainumber":"19.39","ainame":"AIML_CN","tdoc_agenda_sort_order":65631,"status":"postponed","reservation_date":"2024-11-26 15:09:17","uploaded":null,"revisionof":"C1-246563","revisedto":"","release":"Rel-19","crspec":24.501,"crspecversion":"19.0.0","workitem":[{"winame":"AIML_CN"}],"crnumber":6625.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C1","meeting":"C1-152","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]