[{"name":"S2-2504506","title":"LS from CT WG4: Reply LS on maximum warning message size","source":"CT WG4","contact":"Baixiao Wang","contact-id":97153,"tdoctype":"LS in","for":"Information","abstract":"CT WG4 thanks RAN WG2 for their LS on maximum warning message size. CT WG4 relies on CT WG1 (who owns the stage 2 for PWS) to respond RAN WG2 questions. For information, the maximum warning message size specified by CT WG4 in the stage 3 protocol specific","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11490,"status":"noted","reservation_date":"2025-04-26 05:38:50","uploaded":"2025-04-28 12:22:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"IoT_NTN_Ph3-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"CT WG1, SA WG2, RAN WG3","lsoriginalls":"C4-251432","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504506.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504578","title":"LS from RAN WG3: Reply LS on OAM requirements to support regenerative payload transport links","source":"RAN WG3","contact":"Jiancheng SUN","contact-id":62128,"tdoctype":"LS in","for":"Action","abstract":"RAN WG3 thanks SA WG2 and SA WG5 for the reply LS on OAM requirements to support regenerative. The existing NG signalling procedures for supported TAI list update are expected to work as legacy. However, some NTN scenarios (e.g. NGSO NTN scenarios) benefi","secretary_remarks":"Revision of postponed S2-2502829 from SA WG2#168. Responses drafted in S2-2505057, S2-2505261, S2-2505408. Final response in S2-2505961","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11500,"status":"replied to","reservation_date":"2025-04-28 13:46:46","uploaded":"2025-04-29 05:05:42","revisionof":"S2-2502829","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"R3-250895","lsreply":"S2-2505961","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504578.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504580","title":"LS from SA WG5: Reply LS to LS on reply to LS on OAM requirements to support regenerative payload","source":"SA WG5","contact":"Xian Zhao","contact-id":95721,"tdoctype":"LS in","for":"Action","abstract":"SA WG5 thanks SA WG2 for the LS S2-2413030 on reply to LS on OAM requirements to support regenerative payload. SA WG5 has concluded an OAM solution to configure AMF with TAIs supported by NTN gNB in TR 28.874 clause 5.2.2.3.2. {. .} Action: SA WG5 kindly","secretary_remarks":"Revision of postponed S2-2502842 from SA WG2#168. Responses drafted in S2-2505057, S2-2505261, S2-2505408. Final response in S2-2505961","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11510,"status":"replied to","reservation_date":"2025-04-28 13:46:46","uploaded":"2025-04-29 05:05:42","revisionof":"S2-2502842","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"NTN_OAM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG3","lsoriginalls":"S5-250842","lsreply":"S2-2505961","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504580.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504656","title":"Support of NG connection interruption due to hard feeder link switch over","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To align with RAN WG3 agreement, adding an new clause to describe 5GC handling for NG interruption due to hard feeder link switch over. To suspend or resume the DL signalling\/data transmission to the gNB, it is proposed to use per UE se","secretary_remarks":"Merged into S2-2505686","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11720,"status":"merged","reservation_date":"2025-06-05 07:26:30","uploaded":"2025-05-09 16:50:57","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6284.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504656.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.X (new clause)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504683","title":"Update on early media handling in UE-Satellite-UE scenario","source":"Vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update AE.5.3","secretary_remarks":"Revision of (Unhandled) S2-2503583. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12050,"status":"not treated","reservation_date":"2025-07-05 02:01:52","uploaded":"2025-05-09 14:25:29","revisionof":"S2-2503583","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1629.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504683.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504722","title":"Removal of Rx-Related Note for UE-SAT-UE","source":"ZTE, CATT","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The note stating that 'If Rx is used by P-CSCF, implicit subscription is assumed as part of PCC rules setting' is removed from AE.5.1, as Rx interface lacks the necessary enhancements (e.g., satellite identifier and DNAI support) requir","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12070,"status":"not treated","reservation_date":"2025-07-05 12:47:58","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1644.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504722.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504723","title":"Input Parameter Alignment for UP Path Change Subscription in TS 23.502","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add serving satellite id as an optional input parameter to the Nsmf_EventExposure_Notify and Npcf_PolicyAuthorization_Notify service operations.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12040,"status":"not treated","reservation_date":"2025-07-05 12:47:59","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5489.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504723.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.5.3.5, 5.2.8.3.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504724","title":"Input Parameter Alignment for UP Path Change Subscription in TS 23. 228","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the early notification received by the P-CSCF includes the DNAI, which is derived from the satellite ID and represents the change in user plane path.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12120,"status":"not treated","reservation_date":"2025-07-05 12:48:00","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1645.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504724.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.1, AE.5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504725","title":"Enhancement of SM Policy Control to Support Implicit Subscription Handling","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Updated the description, inputs, and outputs of the Npcf_SMPolicyControl_UpdateNotify service operation to support implicit subscription.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12130,"status":"not treated","reservation_date":"2025-07-05 12:48:00","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5490.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504725.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.5.4.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504726","title":"Clarification of DNAI Handling for UE-SAT-UE Communication","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Avoided redundant derivation of DNAI by clarifying that the DNAI included in Npcf_PolicyAuthorization_Notify for UE-SAT-UE communication is already derived by the SMF and does not need to be re-derived by the PCF.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12140,"status":"not treated","reservation_date":"2025-07-05 12:48:02","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5491.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504726.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.2.5.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504727","title":"Refinement of UE behavior and S&F wait timer handling","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Define the UE behavior during the S&F wait timer running period.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11750,"status":"not treated","reservation_date":"2025-07-05 12:48:02","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3925.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504727.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504777","title":"Update to Initial Call setup and functional support for UE-Satellite-UE communication in IMS","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Identify event used by P-CSCF as being Access Network Information Notification, and the PCRT trigger set to Access Network Information report","secretary_remarks":"Revision of (Unhandled) S2-2502917. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12100,"status":"not treated","reservation_date":"2025-08-05 00:32:31","uploaded":"2025-05-09 21:43:09","revisionof":"S2-2502917","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1608.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504777.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.1, AE.3.2, AE.4.2, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504778","title":"Update to Mobility procedures for UE-Satellite-UE communication","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Replace the term positive response with the acknowledgement of notifications about UP path management events; being the actual terminology used in the 23.502.","secretary_remarks":"Revision of (Unhandled) S2-2502918. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12060,"status":"not treated","reservation_date":"2025-08-05 00:32:31","uploaded":"2025-05-09 21:43:09","revisionof":"S2-2502918","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1609.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504778.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.1, AE.5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504790","title":"Clarification on S&F Wait Timer","source":"Nokia, Huawei, HiSilicon","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarification text added on UE behaviour when S&F Wait timer is running","secretary_remarks":"Revision of (Revised and Noted) S2-2503071. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11730,"status":"noted","reservation_date":"2025-08-05 05:42:52","uploaded":"2025-05-09 13:54:00","revisionof":"S2-2503071","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3905.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504790.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504882","title":"On TAI configuration in AMF via OAM.","source":"Qualcomm Incorporated, Vodafone","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"discussion","for":"Approval","abstract":"Discusses the RAN WG3 proposal for TAI configuration in AMF and proposes a way forward.","secretary_remarks":"Revision of (Noted) S2-2503224. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11520,"status":"not treated","reservation_date":"2025-08-05 14:15:01","uploaded":"2025-05-09 19:17:44","revisionof":"S2-2503224","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504882.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504905","title":"Clarify S1-U not supported by split MME","source":"Ericsson, AT&T","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the 'user plane' in the example is S1-U user plane. Remove the NOTE in the procedure clauses.","secretary_remarks":"Revision of (Unhandled) S2-2503266. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11960,"status":"not treated","reservation_date":"2025-08-05 14:26:44","uploaded":"2025-05-09 21:43:09","revisionof":"S2-2503266","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3907.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504905.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504906","title":"Clarify PDN connection handling for split MME","source":"Ericsson, AT&T","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Clarify that it is the PDN connection handling that is up to implementation. Clarify that the 'initial attach reject + MME onboard interacts with MME ground' can happen 'before and after xxxx'. 2. Change 'supporting' to 'operating'","secretary_remarks":"Revision of (Unhandled) S2-2503267. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11980,"status":"not treated","reservation_date":"2025-08-05 14:26:45","uploaded":"2025-05-09 21:43:09","revisionof":"S2-2503267","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3908.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504906.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.2, Annex O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504907","title":"Clarify the S&F event is sent from SCEF to SCS\/AS","source":"Ericsson, AT&T","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Replace MME with SCEF.","secretary_remarks":"Revision of (Unhandled) S2-2503753. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12000,"status":"not treated","reservation_date":"2025-08-05 14:27:00","uploaded":"2025-05-09 21:43:09","revisionof":"S2-2503753","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":498.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504907.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.6.3.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504909","title":"TAI handling for regenerative access .","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Approval","abstract":"This contribution discusses way forward for the TAI handling with regenerative satellite access.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11530,"status":"not treated","reservation_date":"2025-08-05 14:27:19","uploaded":"2025-05-09 21:43:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504909.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504911","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"Qualcomm, Vodafone","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG3, SA WG5","secretary_remarks":"Revision of (Noted) S2-2503231. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11600,"status":"not treated","reservation_date":"2025-08-05 14:28:49","uploaded":"2025-05-09 19:17:44","revisionof":"S2-2503231","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504911.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504977","title":"Transition to S&F satellite for legacy UE","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Proposes new text to avoid a legacy UE erroneously staying in S&F cell .","secretary_remarks":"Revised in parallel session to S2-2505688.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11800,"status":"revised","reservation_date":"2025-08-05 17:57:11","uploaded":"2025-05-09 19:17:44","revisionof":"","revisedto":"S2-2505688","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3926.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504977.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2504994","title":"UE procedures for handling S&F Wait Timer","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Proposes to add reference to TS 24.301 regarding the handling of S&F Wait Timer in the UE","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11740,"status":"noted","reservation_date":"2025-08-05 23:36:38","uploaded":"2025-05-09 19:17:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3927.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2504994.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505050","title":"Transitioning between operation in S&F mode and normal mode","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: MME-onboard may trigger S1 release procedure with the existing cause 'load balancing TAU required' when transition between the S&F mode and normal mode.","secretary_remarks":"Revision of (Unhandled) S2-2503363. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11780,"status":"noted","reservation_date":"2025-09-05 06:12:27","uploaded":"2025-05-09 13:38:51","revisionof":"S2-2503363","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3911.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505050.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505051","title":"Procedure updates for S&F operation","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - It is clarified that the DL NAS PDU message may contain the S&F related parameters during MT Data Transport procedure. - Align the NOTE in the Reason for changes in Attach and TAU procedures","secretary_remarks":"Revision of (Withdrawn) S2-2503364. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11850,"status":"noted","reservation_date":"2025-09-05 06:14:01","uploaded":"2025-05-09 13:38:51","revisionof":"S2-2503364","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3912.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505051.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505053","title":"Updates to S&F mode transition","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that when transition to S&F mode occurs and UE is in connected state, the MME may detach the UE with a cause non-specific to S&F Mode.","secretary_remarks":"Revision of (Unhandled) S2-2503414. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11790,"status":"noted","reservation_date":"2025-09-05 06:26:17","uploaded":"2025-05-09 09:42:34","revisionof":"S2-2503414","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3913.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505053.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505054","title":"Procedure updates for S&F","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the following descriptions in MT procedure similar to MO process: If the supports Store and Forward Satellite operation and the MME is operating in S&F Mode, the MME may optionally provide in the NAS PDU message any of the following","secretary_remarks":"Revision of (Unhandled) S2-2503415. Revised in parallel session to S2-2505689 (withdrawn). Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11830,"status":"revised","reservation_date":"2025-09-05 06:26:33","uploaded":"2025-05-09 09:42:34","revisionof":"S2-2503415","revisedto":"S2-2505689","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3914.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505054.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.4B.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505055","title":"TAIs configured by OAM","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the aggreement of RAN WG3 that 'The AMF may be configured the supported TAI list of the gNB onboard the satellite by OAM and shares the same configuration on supported TAI list with the gNB onboard the satellite' Further clarify tha","secretary_remarks":"Revision of (Revised and Noted) S2-2503416. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11660,"status":"not treated","reservation_date":"2025-09-05 06:26:35","uploaded":"2025-05-09 09:42:34","revisionof":"S2-2503416","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6217.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505055.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505056","title":"TAIs configured by OAM","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Capture the descriptions of OAM configured TAIs in regenerative payload","secretary_remarks":"Revision of (Revised and Noted) S2-2503417. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11640,"status":"not treated","reservation_date":"2025-09-05 06:26:36","uploaded":"2025-05-09 09:42:34","revisionof":"S2-2503417","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5443.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505056.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505057","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG3, SA WG5. Attachments: TS 23.501 CR6217, TS23.502 CR5443.","secretary_remarks":"Response to S2-2504578 and S2-2504580. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11620,"status":"not treated","reservation_date":"2025-09-05 06:26:37","uploaded":"2025-05-09 09:42:34","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505057.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505093","title":"Update on change of BP\/ULCL and UP notification procedures for UE-Satellite-UE communication","source":"ETRI","contact":"Yoohwa Kang","contact-id":63871,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To ensure alignment with TS 23.501, the following additions are introduced to support UE-satellite-UE communication: Inclusion of the case where the serving satellite changes into the procedure for simultaneous change of Branching Point","secretary_remarks":"Revision of (Unhandled) S2-2503467. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12080,"status":"not treated","reservation_date":"2025-09-05 07:25:52","uploaded":"2025-05-09 10:21:21","revisionof":"S2-2503467","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5452.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505093.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.5.7, 4.3.6.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505100","title":"Clarification that a UE may not be necessarily served by all the satellites in S&F mode in a PLMN but by a subset of satellites","source":"Sateliot, Thales, Novamint","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: (1) Introduce a NOTE to clarify that a particular UE may not be necessarily served by all the satellites operating in S&F mode that belong to the same PLMN. (2) Add an example in NOTE4 related to the previous.","secretary_remarks":"Revised in parallel session to S2-2505692.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11930,"status":"revised","reservation_date":"2025-09-05 08:21:00","uploaded":"2025-05-09 09:29:26","revisionof":"","revisedto":"S2-2505692","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3928.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505100.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505149","title":"Clarification on UP path event subscription for UE-satellite-UE communication","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that 'AF acknowledgment to be expected' is required for subscription to corresponding SMF events (DNAI change) during call setup procedure.","secretary_remarks":"Revision of (Unhandled) S2-2503652. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12030,"status":"not treated","reservation_date":"2025-09-05 09:38:05","uploaded":"2025-05-09 14:57:47","revisionof":"S2-2503652","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1630.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505149.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.1, AE.5.2.1,","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505150","title":"Clarification and correction on UP path event report for UE-satellite-UE communication","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that 'AF acknowledgment to be expected' is required for subscription to corresponding SMF events (DNAI change) in the clasue related to support for UE-satellite-UE communication when serving satellite changes.","secretary_remarks":"Revision of (Unhandled) S2-2503653. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12020,"status":"not treated","reservation_date":"2025-09-05 09:38:16","uploaded":"2025-05-09 14:57:47","revisionof":"S2-2503653","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6246.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505150.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505151","title":"Update Support of Attach with PDN connection for split MME architecture","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Regarding unsuccessful authentication\/security procedure or failure to attach, the pre-established PDN connection between MME-ground and S-GW should be released.","secretary_remarks":"Revision of (Noted) S2-2503918. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11970,"status":"not treated","reservation_date":"2025-09-05 09:38:18","uploaded":"2025-05-09 14:57:47","revisionof":"S2-2503918","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3917.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505151.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505152","title":"Removing UE S&F Term","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove text about S&F Mode for the UE. Change 'S&F mode' to 'S&F Mode'.","secretary_remarks":"Confirm Spec version used - CR states 19.1.0!. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11990,"status":"not treated","reservation_date":"2025-09-05 09:38:19","uploaded":"2025-05-09 14:57:47","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":500.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505152.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505201","title":"Detach related procedures update to support S&F operation","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the UE-initiated Detach procedure and HSS-initiated Detach procedure to support providing S&F monitoring list to the UE","secretary_remarks":"Revised in parallel session to S2-2505690 (withdrawn). Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11860,"status":"revised","reservation_date":"2025-09-05 10:19:25","uploaded":"2025-05-09 14:43:20","revisionof":"","revisedto":"S2-2505690","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3929.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505201.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.8.2.1, 5.3.8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505223","title":"Avoid congestion caused by S&F timer","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To avoid that large amounts of UEs initiate deferred requests (almost) simultaneously, the MME should select the S&F Wait timer value so that the deferred requests are not synchronized.","secretary_remarks":"Revision of (Unhandled) S2-2503662. Revised in parallel session to S2-2505687.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11760,"status":"revised","reservation_date":"2025-09-05 10:36:44","uploaded":"2025-05-09 10:50:18","revisionof":"S2-2503662","revisedto":"S2-2505687","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3915.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505223.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505232","title":"Update to the GUTI Reallocation procedure","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Updated the reason for updating the network-triggered S&F Wait Timer and S&F Monitoring List information. 2) Modified the corresponding procedure.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11880,"status":"noted","reservation_date":"2025-09-05 10:51:13","uploaded":"2025-05-09 11:54:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3930.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505232.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505233","title":"N2 interface enhancement for downlink data suspension\/resumption","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added enhancement to use the RAN Configuration Setup procedure for suspending or resuming downlink transmission during hard feeder link switchover in regenerative satellite payload scenarios.","secretary_remarks":"Revised in parallel session to S2-2505686, merging S2-2504656","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11670,"status":"revised","reservation_date":"2025-09-05 10:51:14","uploaded":"2025-05-09 11:33:46","revisionof":"","revisedto":"S2-2505686","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6324.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505233.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505236","title":"Discussion on OAM based solution to support NTN regenerative payload.","source":"CATT, CSCN, ZTE, vivo","contact":"Jie Lu","contact-id":98847,"tdoctype":"discussion","for":"Discussion","abstract":"This paper presents a discussion on OAM based solution to support NTN regenerative payload related to LS R3-250895 from RAN WG3 and S5-250842 from SA WG5.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11540,"status":"not treated","reservation_date":"2025-09-05 10:55:24","uploaded":"2025-05-09 11:08:57","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505236.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505237","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OAM requirements to support regenerative payload transport links","secretary_remarks":"Revision of (Noted) S2-2503706. Revised to S2-2505261","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11560,"status":"revised","reservation_date":"2025-09-05 10:55:24","uploaded":"2025-05-09 11:08:57","revisionof":"S2-2503706","revisedto":"S2-2505261","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505237.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505238","title":"Configuration of TAI list for regenerative satellite payload","source":"CATT, CSCN","contact":"Jie Lu","contact-id":98847,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the description that the AMF is configured with the supported TAI list of the on-board gNB, to support regenerative satellite payload for NR NTN.","secretary_remarks":"Revision of (Unhandled) S2-2503707. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11630,"status":"noted","reservation_date":"2025-09-05 10:55:24","uploaded":"2025-05-09 11:08:57","revisionof":"S2-2503707","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6250.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505238.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505239","title":"Clarification on UE-SAT-UE communication when serving satellite changes","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarified NOTE 1 to explicitly state that the assumption of co-located gNB, UL CL\/L-PSA, IMS-AGW applies to both source and target satellites.","secretary_remarks":"Revision of (Unhandled) S2-2503709. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12090,"status":"not treated","reservation_date":"2025-09-05 10:55:41","uploaded":"2025-05-09 11:08:57","revisionof":"S2-2503709","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6251.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505239.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505240","title":"Clarification on UE-Satellite-UE communication procedures","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Change 'UL CL' to 'UL CL\/BP' in UE-Satellite-UE communication procedures. Modify the description of N5 interface. Editorial modifications.","secretary_remarks":"Revision of (Unhandled) S2-2503712. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12110,"status":"not treated","reservation_date":"2025-09-05 10:55:42","uploaded":"2025-05-09 11:08:57","revisionof":"S2-2503712","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1636.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505240.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.1, AE.5.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505261","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OAM requirements to support regenerative payload transport links","secretary_remarks":"Revision of S2-2505237. Response to S2-2504578 and S2-2504580. Revised in parallel session to S2-2505685.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11570,"status":"revised","reservation_date":"2025-09-05 11:27:30","uploaded":"2025-05-09 11:33:43","revisionof":"S2-2505237","revisedto":"S2-2505685","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505261.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505389","title":"Align the terms.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align terms in clause 5.6.3.10 to the 23.401.","secretary_remarks":"Revision of (Unhandled) S2-2503887. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":12010,"status":"not treated","reservation_date":"2025-09-05 19:19:14","uploaded":"2025-05-09 19:24:11","revisionof":"S2-2503887","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":499.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505389.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.6.3.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505395","title":"Handling S&F not allowed.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If network determines to not provide S&F service, it indicates with a reject cause to the UE.","secretary_remarks":"Revision of (Unhandled) S2-2503881. Revised in parallel session to S2-2505691.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11890,"status":"revised","reservation_date":"2025-09-05 19:27:21","uploaded":"2025-05-09 19:31:26","revisionof":"S2-2503881","revisedto":"S2-2505691","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3923.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505395.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505407","title":"Supported TAIs information","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Capture the descriptions of OAM configured TAIs for regenerative payload. AMF is signaled by NG-RAN this information.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11650,"status":"noted","reservation_date":"2025-09-05 19:59:42","uploaded":"2025-05-09 20:02:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6332.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505407.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505408","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG3, SA WG5. Attachments: TS 23.501 CR6332.","secretary_remarks":"Response to S2-2504578 and S2-2504580. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11610,"status":"not treated","reservation_date":"2025-09-05 20:06:58","uploaded":"2025-05-09 20:10:49","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505408.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505539","title":"SoH questions for TAI handling","source":"Session chair","contact":"Dario Serafino Tonesi","contact-id":88932,"tdoctype":"other","for":"Presentation","abstract":"SoH questions for TAI handling","secretary_remarks":"Created in parallel session. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11550,"status":"noted","reservation_date":"2025-05-24 06:42:42","uploaded":"2025-05-24 08:21:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505539.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505685","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload transport links","source":"CATT","contact":"Jie Lu","contact-id":98847,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OAM requirements to support regenerative payload transport links","secretary_remarks":"Revision of S2-2505261. Revised in parallel session to S2-2505961.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11580,"status":"revised","reservation_date":"2025-05-24 06:43:33","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505261","revisedto":"S2-2505961","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505685.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505686","title":"N2 interface enhancement for downlink data suspension\/resumption","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added enhancement to use the RAN Configuration Setup procedure for suspending or resuming downlink transmission during hard feeder link switchover in regenerative satellite payload scenarios.","secretary_remarks":"Revision of S2-2505233, merging S2-2504656. Revised in parallel session to S2-2505707.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11680,"status":"revised","reservation_date":"2025-05-24 06:43:33","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505233","revisedto":"S2-2505707","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6324.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505686.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505687","title":"Avoid congestion caused by S&F timer","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To avoid that large amounts of UEs initiate deferred requests (almost) simultaneously, the MME should select the S&F Wait timer value so that the deferred requests are not synchronized.","secretary_remarks":"Revision of S2-2505223. Postponed in parallel session<br\/><br\/>Source modified on 24\/05\/2025. Original source : MediaTek Inc.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11770,"status":"postponed","reservation_date":"2025-05-24 06:43:33","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505223","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3915.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505687.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505688","title":"Transition to S&F satellite for legacy UE","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Proposes new text to avoid a legacy UE erroneously staying in S&F cell .","secretary_remarks":"Revision of S2-2504977. Revised in parallel session to S2-2505709.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11810,"status":"revised","reservation_date":"2025-05-24 06:43:34","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2504977","revisedto":"S2-2505709","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3926.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505688.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505689","title":"Procedure updates for S&F","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the following descriptions in MT procedure similar to MO process: If the supports Store and Forward Satellite operation and the MME is operating in S&F Mode, the MME may optionally provide in the NAS PDU message any of the following","secretary_remarks":"Revision of S2-2505054. Withdrawn","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11840,"status":"withdrawn","reservation_date":"2025-05-24 06:43:35","uploaded":null,"revisionof":"S2-2505054","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3914.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505690","title":"Detach related procedures update to support S&F operation","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the UE-initiated Detach procedure and HSS-initiated Detach procedure to support providing S&F monitoring list to the UE","secretary_remarks":"Revision of S2-2505201. Withdrawn","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11870,"status":"withdrawn","reservation_date":"2025-05-24 06:43:36","uploaded":null,"revisionof":"S2-2505201","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3929.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505691","title":"Handling S&F not allowed.","source":"Samsung, ZTE, NEC","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If network determines to not provide S&F service, it indicates with a reject cause to the UE.","secretary_remarks":"Revision of S2-2505395. Revised in parallel session to S2-2505711.<br\/><br\/>Source modified on 24\/05\/2025. Original source : Samsung","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11900,"status":"revised","reservation_date":"2025-05-24 06:43:37","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505395","revisedto":"S2-2505711","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3923.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505691.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505692","title":"Clarification that the S&F Wait Timer may need to take into account the time taken to synchronize UE context between MME-ground and MME-onboard(s)","source":"Sateliot, Thales, Novamint, MediaTek","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: (1) Introduce a NOTE to clarify that a particular UE may not be necessarily served by all the satellites operating in S&F mode that belong to the same PLMN. (2) Add an example in NOTE4 related to the previous.","secretary_remarks":"Revision of S2-2505100. Revised in parallel session to S2-2505710.<br\/><br\/>Title modified on 24\/05\/2025. Original title : Clarification that a UE may not be necessarily served by all the satellites in S&F mode in a PLMN but by a subset of satellites<br\/><br\/>Source modified on 24\/05\/2025. Original source : Sateliot, Thales, Novamint","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11940,"status":"revised","reservation_date":"2025-05-24 06:43:37","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505100","revisedto":"S2-2505710","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3928.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505692.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505707","title":"N2 interface enhancement for downlink data suspension\/resumption","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added enhancement to use the RAN Configuration Setup procedure for suspending or resuming downlink transmission during hard feeder link switchover in regenerative satellite payload scenarios.","secretary_remarks":"Revision of S2-2505686. Revised in parallel session to S2-2505708.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11690,"status":"revised","reservation_date":"2025-05-24 06:43:49","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505686","revisedto":"S2-2505708","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6324.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505707.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505708","title":"N2 interface enhancement for downlink data suspension\/resumption","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added enhancement to use the RAN Configuration Setup procedure for suspending or resuming downlink transmission during hard feeder link switchover in regenerative satellite payload scenarios.","secretary_remarks":"Revision of S2-2505707. Revised in parallel session to S2-2505962.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11700,"status":"revised","reservation_date":"2025-05-24 06:43:50","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505707","revisedto":"S2-2505962","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6324.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505708.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505709","title":"Transition to S&F satellite for legacy UE","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Proposes new text to avoid a legacy UE erroneously staying in S&F cell .","secretary_remarks":"Revision of S2-2505688. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11820,"status":"noted","reservation_date":"2025-05-24 06:43:51","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505688","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3926.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505709.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505710","title":"Clarification that the S&F Wait Timer may need to take into account the time to synchronize the UE context between MME-ground and MME-onboard(s)","source":"Sateliot, Thales, Novamint, MediaTek, Samsung","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: Add a note in Annex O.2 clarifying that the S&F Wait Timer takes into account the time to synchronize UE context between MME-ground and MME-onboard(s) in some deployments.","secretary_remarks":"Revision of S2-2505692. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11950,"status":"agreed","reservation_date":"2025-05-24 06:43:52","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505692","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3928.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250463","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505710.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505711","title":"Handling S&F not allowed.","source":"Samsung, ZTE, NEC, Nokia","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If network determines to not provide S&F service, it indicates with a reject cause to the UE.","secretary_remarks":"Revision of S2-2505691. Revised in parallel session to S2-2505963.<br\/><br\/>Source modified on 24\/05\/2025. Original source : Samsung","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11910,"status":"revised","reservation_date":"2025-05-24 06:43:53","uploaded":"2025-05-24 08:21:07","revisionof":"S2-2505691","revisedto":"S2-2505963","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3923.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505711.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505961","title":"Reply LS on OAM requirements to support regenerative payload transport links","source":"SA WG2","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on OAM requirements to support regenerative payload transport links","secretary_remarks":"Revision of S2-2505685. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11590,"status":"approved","reservation_date":"2025-05-24 06:45:01","uploaded":"2025-05-24 08:31:09","revisionof":"S2-2505685","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2504578","lsto":"RAN WG3, SA WG5","Cc":"TSG SA, TSG RAN","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505961.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505962","title":"N2 interface enhancement for downlink data suspension\/resumption","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added enhancement to use the RAN Configuration Setup procedure for suspending or resuming downlink transmission during hard feeder link switchover in regenerative satellite payload scenarios.","secretary_remarks":"Revision of S2-2505708. Postponed in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11710,"status":"postponed","reservation_date":"2025-05-24 06:45:01","uploaded":"2025-05-24 08:31:09","revisionof":"S2-2505708","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.3.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6324.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505962.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2505963","title":"Handling S&F not allowed.","source":"Samsung, ZTE, NEC, Nokia","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Change-1: Clarification that reject cause condition also included for TAU procedure. Change-2: HSS includes S&F subscription information of the UE. MME rejects the UE request if UE is not subscribed for S&F feature.","secretary_remarks":"Revision of S2-2505711. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3-ARC)","tdoc_agenda_sort_order":11920,"status":"agreed","reservation_date":"2025-05-24 06:45:02","uploaded":"2025-05-24 08:31:09","revisionof":"S2-2505711","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3923.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-250463","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_169_Fukuoka_2025-05\/Docs\/S2-2505963.zip","group":"S2","meeting":"S2-169","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.7.1","crsinpack":null,"crsinpacknumber":0}]