[{"name":"S2-2501368","title":"LS from RAN WG2: LS on Satellite IDs for store-and-forward operation","source":"RAN WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 discussed how an IoT NTN UE capable of store-and-forward operation uses the MME-configured satellite ID list in the access stratum. RAN WG2 made the assumption that the UE configured with a satellite ID list by MME is not prevented to camp on a satellite operating in normal IoT NTN mode (i.e. with feeder-link connection), and perform subsequent access and data\/signalling communication with that satellite. RAN WG2 would like to request SA WG2 to provide feedback on whether the following RAN WG2 understanding can be confirmed: {. .}. Action: RAN WG2 respectfully asks SA WG2 to provide feedback on whether above RAN WG2 understanding can be confirmed and provide an answer to the Question above.","secretary_remarks":"Revision of Postponed S2-2500047 from SA WG2#166AHE. Responses drafted in S2-2501521, S2-2501729, S2-2501924, S2-2501990, S2-2502123. Final response in S2-2502450","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12760,"status":"replied to","reservation_date":"2025-01-27 14:23:24","uploaded":"2025-01-28 07:20:52","revisionof":"S2-2500047","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2. Attachments: -","Cc":"","lsoriginalls":"R2-2411197","lsreply":"S2-2502450, S2-2502450","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501368.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501518","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. The network behaviour is introduced when the UE accesses any satellite which do not have UE context to serve the UE. UE capability is not dependent on satellite mode. The UE do not need to delete S&F related parameters for ESM Data Transport case.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12570,"status":"not treated","reservation_date":"2025-02-07 05:02:13","uploaded":"2025-02-10 13:32:02","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501518.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501519","title":"Control Plane Service Request procedure updates for S&F","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The S&F monitoring list is added in control plane service request in the procedures.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12730,"status":"not treated","reservation_date":"2025-02-07 05:06:10","uploaded":"2025-02-10 13:32:14","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3882.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501519.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.4B.2, 5.3.4B.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501520","title":"Mode transition between S&F and Normal Mode","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and network behaviour for transition between S&F mode and normal mode.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12920,"status":"not treated","reservation_date":"2025-02-07 05:09:45","uploaded":"2025-02-10 13:32:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3883.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501520.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501521","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS for LS on Satellite IDs for store-and-forward operation (S2-2501368\/ R2-2411197)","secretary_remarks":"Revision of (Unhandled) S2-2500538. Response to S2-2501368 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12810,"status":"not treated","reservation_date":"2025-02-07 05:12:55","uploaded":"2025-02-10 13:32:48","revisionof":"S2-2500538","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"IoT_NTN_Ph3-Core"},{"winame":" 5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501521.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501610","title":"AMF selection for regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the text in NOTE 1 under bullet 2) with the introduction sentence above","secretary_remarks":"Revision of (Unhandled) S2-2500247. Revised in parallel session to S2-2502185.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12470,"status":"revised","reservation_date":"2025-02-07 16:49:52","uploaded":"2025-02-10 21:55:56","revisionof":"S2-2500247","revisedto":"S2-2502185","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5908.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501610.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501611","title":"Split MME handling of UE attach with PDN connection","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding note in split MME architecture principles to explain how MME interacts with network on the ground to establish PDN connectivity is up to the MME implemenation.","secretary_remarks":"Revision of (Postponed) S2-2500248 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12990,"status":"not treated","reservation_date":"2025-02-07 16:49:53","uploaded":"2025-02-10 21:55:56","revisionof":"S2-2500248","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3846.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501611.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501612","title":"Handling of UE access to satellite which has no UE context","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"Discusses a possible solution for UE attempting to access satellites where the NW is not expected to have the UE context.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12510,"status":"noted","reservation_date":"2025-02-07 16:49:53","uploaded":"2025-02-10 21:55:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501612.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501613","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Rev 3 MME to provide additional indication in the reject message, so that the UE can remain EMM state. The Rev2 changes are highlighted with yellow color.","secretary_remarks":"Revision of (Agreed) S2-2501339. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12580,"status":"noted","reservation_date":"2025-02-07 16:49:53","uploaded":"2025-02-10 21:55:56","revisionof":"S2-2501339","revisedto":"S2-2502172","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501613.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501614","title":"Considerations and proposal for the S&F mode change behaviour","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"This paper provides an analysis on the mode change scenarios and proposes considerations for defining mode change behaviours.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12840,"status":"not treated","reservation_date":"2025-02-07 16:49:54","uploaded":"2025-02-10 21:55:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501614.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501615","title":"Support for satellite access with regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for regenerative payload.","secretary_remarks":"Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12490,"status":"agreed","reservation_date":"2025-02-07 16:49:54","uploaded":"2025-02-10 21:55:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3885.0,"crrevision":"","crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501615.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 4.13.1, 4.13.2, 4.13.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501666","title":"Update on UE-Satellite-UE communication determination","source":"vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update AE.3.2 and AE.4.2 according to the procedures Editorial modification in AE.1 Remove ENs","secretary_remarks":"Merged into S2-2502236","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13300,"status":"merged","reservation_date":"2025-02-08 03:52:09","uploaded":"2025-02-10 09:24:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1585.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501666.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.1, AE.3.2, AE.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501686","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Revision: Remove the EN: It is for further consideration whether specific UE behaviour or clarification needs to be added to prevent the UE from accessing satellites where the NW is not expected to keep a UE context. Add clarifications on NOTE Y that when accessing to the satellite, the UE may take the S&F monitoring list into account. Changes are with yellow highlighted.","secretary_remarks":"Revision of (Agreed) S2-2501339. Check WI Code: {5GSAT_Ph3-ARC-> 5GSAT_Ph3_ARCH}! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12590,"status":"not treated","reservation_date":"2025-02-08 07:53:45","uploaded":"2025-02-10 11:15:02","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501686.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501687","title":"Transition between S&F and normal","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If a UE is in ECM-CONNECTED state with a satellite operating in S&F mode (i.e., the accessing eNB that is broadcasting the indication of operating in S&F Mode), for upcoming available feeder link, the MME on the satellite operating in S&F mode detaches the UE. If a UE is in ECM-CONNECTED state with a satellite operating in non-S&F mode (i.e., the accessing eNB that is not broadcasting the indication of operating in S&F Mode), for upcoming loss of the feeder link, the MME on the satellite operating in S&F mode detaches the UE. NOTE A: How the MME determines the feeder link availability upcoming is up to MME implementation. If a UE is registered state for S&F operation (i.e., the UE was provided the S&F capability during the attach) and in ECM-IDLE state, when detects the eNB of the camping cell that does not broadcast the indication of operating in S&F Mode, the UE initiates the attach procedure to the network. If a UE is registered state not for S&F operation (i.e., the UE is registered to TN or NTN not operating S&F) and in ECM-IDLE state, when detects the eNB of the camping cell that broadcasts the indication of operating in S&F Mode, the UE initiates the attach procedure to the network.","secretary_remarks":"Check WI Code: {5GSAT_Ph3-ARC-> 5GSAT_Ph3_ARCH}! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12910,"status":"not treated","reservation_date":"2025-02-08 07:53:46","uploaded":"2025-02-10 11:15:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3886.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501687.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501688","title":"Clarification on S&F wait timer","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the UE behaviours are left to UE implmentation before the S&F wait timer expires within a NOTE: NOTE X: Before the S&F wait timer expires, the behaviours are left for UE implementation e.g., whether to listen to paging in eDRX, not to initiate any NAS signalling or MO data, or to deactivate its Access Stratum functions to optimise power consumption etc.","secretary_remarks":"Check WI Code: {5GSAT_Ph3-ARC-> 5GSAT_Ph3_ARCH}! Revised in parallel session to S2-2502453.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13100,"status":"revised","reservation_date":"2025-02-08 07:53:46","uploaded":"2025-02-10 11:15:02","revisionof":"","revisedto":"S2-2502453","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3887.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501688.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501689","title":"PDN connection handling under S&F operation","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the process for the attach procedure when there is no PDN connection establishment during attach. Give an example based on implementation to realize the UE UE requested PDN connectivity procedure","secretary_remarks":"Check WI Code: {5GSAT_Ph3-ARC-> 5GSAT_Ph3_ARCH}! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13010,"status":"not treated","reservation_date":"2025-02-08 07:53:47","uploaded":"2025-02-10 11:15:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3888.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501689.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501695","title":"Clarification on support of Store and Forward Satellite Operation","source":"ZTE Corporation","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Clarify MME selection for UE supporting S&F; 2) Clarify on-board eNB broadcasted information for S&F; and 3) Clarify that MME provides S&F support indication to UE in attach accept or TAU accept message.","secretary_remarks":"Revised in parallel session to S2-2502245.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13120,"status":"revised","reservation_date":"2025-02-08 09:50:01","uploaded":"2025-02-10 11:09:01","revisionof":"","revisedto":"S2-2502245","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3889.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501695.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501726","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to define the subset of satellites in which the UE is served and assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12600,"status":"not treated","reservation_date":"2025-02-09 14:30:28","uploaded":"2025-02-10 22:19:08","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501726.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501729","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"[CATT], Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3. Attachments: S2-2500779.","secretary_remarks":"Revision of (Postponed) S2-2500790. Response to S2-2501368 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12800,"status":"not treated","reservation_date":"2025-02-09 14:58:56","uploaded":"2025-02-10 22:19:22","revisionof":"S2-2500790","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501729.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501740","title":"Procedure updates for S&F","source":"[Vivo, Huawei, HiSilicon], Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures. Align wording to clause 4.13.9","secretary_remarks":"Revision of (Agreed) S2-2501340. Revised in parallel session to S2-2502187.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12680,"status":"revised","reservation_date":"2025-02-09 15:16:40","uploaded":"2025-02-10 22:18:44","revisionof":"S2-2501340","revisedto":"S2-2502187","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501740.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2. ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501778","title":"Define UE behaviour when SF Wait Timer is running","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify S&F Wait Timer only applys to the PLMN which provisions the S&F Wait Timer and which operates in S&F Mode.","secretary_remarks":"Revision of (Merged) S2-2500321. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12950,"status":"noted","reservation_date":"2025-02-10 02:13:37","uploaded":"2025-02-10 04:17:24","revisionof":"S2-2500321","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3847.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501778.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501780","title":"No Necessity to define UE in S&F mode","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: remove the defintion regarding 'UE in S&F Mode'","secretary_remarks":"Revision of (Noted) S2-2500322. Revised in parallel session to S2-2502190.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12960,"status":"revised","reservation_date":"2025-02-10 02:15:20","uploaded":"2025-02-10 04:18:41","revisionof":"S2-2500322","revisedto":"S2-2502190","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3848.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501780.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501783","title":"Support of Attach with PDN connection for split MME architecture","source":"LG Electronics, NEC, Samsung, vivo","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: support of Attach with PDN connection is handled based on implementation with example.","secretary_remarks":"Revision of (Postponed) S2-2500551. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12980,"status":"agreed","reservation_date":"2025-02-10 02:19:24","uploaded":"2025-02-10 11:23:10","revisionof":"S2-2500551","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3854.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501783.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501784","title":"Transitioning between operation in S&F mode and normal mode","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: MME-onboard may trigger S1 release procedure with the existing cause 'load balancing TAU required' or detach procedure when transition between the S&F mode and normal mode.","secretary_remarks":"Revision of (Noted) S2-2500559. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12930,"status":"noted","reservation_date":"2025-02-10 02:20:28","uploaded":"2025-02-10 11:23:10","revisionof":"S2-2500559","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3855.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501784.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501785","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Rev.6 Remove the EN for UE behaviour to prevent the UE accessing the satellites where the NW is not expected to keep a UE context.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12610,"status":"not treated","reservation_date":"2025-02-10 02:22:14","uploaded":"2025-02-10 11:23:10","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501785.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501810","title":"Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, Nokia], China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Revision of (Agreed) S2-2500719. Revised in parallel session to S2-2502236, merging S2-2501666","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13260,"status":"revised","reservation_date":"2025-02-10 03:39:27","uploaded":"2025-02-10 16:58:53","revisionof":"S2-2500719","revisedto":"S2-2502236","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1562.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501810.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.3.2, AE.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501813","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Clarification on usage of S&F Wait Timer in UE.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12620,"status":"not treated","reservation_date":"2025-02-10 03:46:16","uploaded":"2025-02-10 16:58:53","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501813.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501816","title":"Update on S&F Satellite Operation for UE and MME","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update on S&F operation for UE and MME to not perform procedures of enhanced discontinuous coverage.","secretary_remarks":"Revised in parallel session to S2-2502192.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13070,"status":"revised","reservation_date":"2025-02-10 03:58:03","uploaded":"2025-02-10 16:58:53","revisionof":"","revisedto":"S2-2502192","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3890.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501816.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501821","title":"Discussion on the enhanced discontinuous network coverage for satellite access under S&F mode","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"discussion","for":"Agreement","abstract":"This paper analyses the impact of S&F Satellite Operation on the current procedures of enhanced discontinuous network coverage for satellite access, and proposes that in S&F mode, the UE and the MME should not perform procedures of enhanced discontinuous coverage for satellite access as described in clause 4.13.8.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13060,"status":"not treated","reservation_date":"2025-02-10 04:03:21","uploaded":"2025-02-10 17:17:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501821.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501924","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3. Attachments: TS 23.401 CR3867","secretary_remarks":"Revision of (Postponed) S2-2500790. Response to S2-2501368. Revised in parallel session to S2-2502188.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12770,"status":"revised","reservation_date":"2025-02-10 09:28:58","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2500790","revisedto":"S2-2502188","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501924.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501925","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12630,"status":"not treated","reservation_date":"2025-02-10 09:28:58","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501925.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501926","title":"Transition between S&F Mode and Normal Mode","source":"[Qualcomm Incorporated], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"Revision of (Postponed) S2-2501041 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12890,"status":"not treated","reservation_date":"2025-02-10 09:29:00","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501041","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501926.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501929","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"[vivo, CSCN, Tencent, Honor, Thales,] CATT, [NTT DOCOMO, China Telecom]","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes. Modifications in this revision (highlighted): Clarify that the SMF can decide whether to route IMS user plane traffic via UPF on ground or retain the UL CL\/L-PSA on satellite based on local configuration and existing UPF selection criteria. Clarify that when serving satellite changes, the UE may be handed over to a target gNB on ground. Correct some inaccurate descriptions (e.g. 'route the PDU Session to the PSA on ground') and editorial modifications (e.g. change 'UE-SAT-UE' to 'UE-SAT-UE communication').","secretary_remarks":"Revision of (Agreed) S2-2501090. Revised in parallel session to S2-2502241.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13440,"status":"revised","reservation_date":"2025-02-10 09:29:08","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501090","revisedto":"S2-2502241","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501929.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501930","title":"Procedure update for UE-Satellite-UE communication","source":"[NTT DOCOMO, China Telecom, Samsung,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF via PCF. Modifications in this revision (highlighted): The following EN is removed as only UE-SAT-UE communication case is identified so far for the PCF to include the Notification Target Address pointing to the PCF, which has been clearly described. Editor's note: How the PCF decides whether to include the Notification Target Address pointing to the NEF\/AF or the PCF is FFS. Clarify that the AMF only reports the identifier of LEO or MEO satellite for UE-SAT-UE communication in this Release of the specification as described in clause 5.4.14 of TS 23.501. Remove the added 'Satellite ID' parameter from Npcf_PolicyAuthorization_Notify service operation, as the satellite ID is contained in the 'Event information' parameter, i.e. Access Network Information Notification as specified in clause 6.1.3.18 of TS 23.503. Add references for 'UE-SAT-UE communication'.","secretary_remarks":"Revision of (Agreed) S2-2501093 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13560,"status":"not treated","reservation_date":"2025-02-10 09:29:09","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501093","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501930.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501931","title":"Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, Nokia, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS. Modifications in this revision (highlighted): Modify the description of optimized media routing activation upon satellite change. Modify the description regarding IMS AGW change. Clarify the message used and references for functional description. Editorial modifications.","secretary_remarks":"Revision of (Agreed) S2-2501087. Revised in parallel session to S2-2502237.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13310,"status":"revised","reservation_date":"2025-02-10 09:29:10","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501087","revisedto":"S2-2502237","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1561.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501931.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501932","title":"Mobility procedure for UE-Satellite-UE communication in IMS - continuation of optimized media routing","source":"[NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing. Modifications in this revision (highlighted): Clarify the service operation used and its content in step 6, and modify step 7 accordingly. Clarify that the UL CL and L-PSA on source satellite is retained and then released upon detection of no active traffic when session continuity upon UL CL relocation is used, in step 8 and 21. Clarify that steps 11-15 are performed in terminating network and steps 16-22 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of (Agreed) S2-2501088. Revised in parallel session to S2-2502239.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13380,"status":"revised","reservation_date":"2025-02-10 09:29:11","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501088","revisedto":"S2-2502239","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501932.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501933","title":"Mobility procedure for UE-Satellite-UE communication in IMS - ground fallback","source":"[NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback. Modifications in this revision (highlighted): Clarify the service operation used and its content in step 6 and 12. Clarify that the UL CL and L-PSA on source satellite is released upon detection of no active traffic when session continuity upon UL CL relocation is used, in step 24. Clarify that steps 9-16 are performed in terminating network and steps 17-23 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of (Agreed) S2-2501089. Revised in parallel session to S2-2502240.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13410,"status":"revised","reservation_date":"2025-02-10 09:29:11","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501089","revisedto":"S2-2502240","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501933.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501934","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"[Huawei, HiSilicon, NTT DOCOMO, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Early media traffic is discussed separately. - P-CSCF subscribes to Notification of User Plane Management Events for satellite change. Modifications in this revision (highlighted): Clarify that satellite identification is requested and reported in Access Network Information in step 2 and 5. Correct the service operations in step 2, 5, 10 and 13. Clarify the UP management event subscription is indicated via the PCF to the SMF using PCC rules (which applies to N5 interface) as specified in TS 23.503 in step 10a and 13a. Editorial modifications, e.g. change 'IMS-AGW with ground or satellite' to 'IMS-AGW on ground or satellite' in Figure AE.5.1-1.","secretary_remarks":"Revision of (Agreed) S2-2501092 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13370,"status":"not treated","reservation_date":"2025-02-10 09:29:12","uploaded":"2025-02-10 11:39:02","revisionof":"S2-2501092","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501934.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501940","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"[vivo, CSCN, Tencent, Honor, Thales, CATT,] NTT DOCOMO[, China Telecom]","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes.","secretary_remarks":"Revision of (Agreed) S2-2501090 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13480,"status":"not treated","reservation_date":"2025-02-10 10:00:22","uploaded":"2025-02-10 10:11:29","revisionof":"S2-2501090","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501940.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.x.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501941","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"[Huawei, HiSilicon,] NTT DOCOMO[, China Telecom, CATT]","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Early media traffic is discussed separately. - P-CSCF subscribes to Notification of User Plane Management Events for satellite change.","secretary_remarks":"Revision of (Agreed) S2-2501092. Revised in parallel session to S2-2502238.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13340,"status":"revised","reservation_date":"2025-02-10 10:00:24","uploaded":"2025-02-10 10:11:29","revisionof":"S2-2501092","revisedto":"S2-2502238","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501941.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501961","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon [, Samsung]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of (Agreed) S2-2501339. Revised in parallel session to S2-2502186.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12530,"status":"revised","reservation_date":"2025-02-10 10:32:22","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2501339","revisedto":"S2-2502186","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501961.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501962","title":"Align terminology for store and forward operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Replace 'Downlink S&F estimated Delivery Time' by 'Estimated DL Delivery Time'.","secretary_remarks":"Revised in parallel session to S2-2502247.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13190,"status":"revised","reservation_date":"2025-02-10 10:32:23","uploaded":"2025-02-10 12:58:22","revisionof":"","revisedto":"S2-2502247","release":"Rel-19","crspec":"23.682","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":497.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501962.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.6.3.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501963","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"[vivo, CSCN, Tencent, Honor, Thales, CATT, NTT DOCOMO], Huawei, HiSilicon, China Telecom","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes.","secretary_remarks":"Revision of (Agreed) S2-2501090. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13490,"status":"not treated","reservation_date":"2025-02-10 10:32:23","uploaded":"2025-02-10 12:58:22","revisionof":"S2-2501090","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501963.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.x.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501985","title":"Transition between S&F and normal for the UE in ECM-CONNECTED","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and network behaviours for transition between S&F mode and normal mode.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12940,"status":"not treated","reservation_date":"2025-02-10 10:48:56","uploaded":"2025-02-10 11:27:30","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3891.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501985.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501986","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: NOTE for intra-NG-RAN node handover is extended to reflect the above conclusion in TS 23.700-29.","secretary_remarks":"Revision of (Unhandled) S2-2500618. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12500,"status":"noted","reservation_date":"2025-02-10 10:50:33","uploaded":"2025-02-10 11:16:59","revisionof":"S2-2500618","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":4994.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501986.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501987","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN on UE accessing satellites where the NW is not expected to keep a UE context.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12640,"status":"not treated","reservation_date":"2025-02-10 10:52:07","uploaded":"2025-02-10 11:22:16","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501987.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501988","title":"DP on UE accessing to a satellite not in the monitoring list","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"discussion","for":"Discussion","abstract":"This paper analyses","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12520,"status":"not treated","reservation_date":"2025-02-10 10:57:32","uploaded":"2025-02-10 14:38:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501988.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501989","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Changes in this contribution: 1. UE context can be synchronized to all satellite(s) to minimize NAS failure is added in NOTE B. EN is removed. 2. use the same description which is 'UE indicates support of Store and Forward Satellite operation'.","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12650,"status":"not treated","reservation_date":"2025-02-10 10:57:32","uploaded":"2025-02-10 14:38:04","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501989.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501990","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3. Attachments: TS 23.401 CR3867.","secretary_remarks":"Response to S2-2501368 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12820,"status":"not treated","reservation_date":"2025-02-10 10:57:35","uploaded":"2025-02-10 14:38:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"R2-2411197","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501990.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501991","title":"23401 Transition between S&F Mode and Normal Mode","source":"[Qualcomm Incorporated], Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode. Changes in this revsion: Correct 'eNodeB is\/is not operating in S&F mode' to 'satellite is\/ isnot operating in S&F mode' TAU is added to trigger mode transition Some clarifications on S&F mode change","secretary_remarks":"Revision of (Postponed) S2-2501041 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12900,"status":"not treated","reservation_date":"2025-02-10 10:57:35","uploaded":"2025-02-10 14:38:04","revisionof":"S2-2501041","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":2.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501991.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501992","title":"Description alignment for S&F procedure","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the S&F related procedures with the solution described in clause 4.13.9","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12750,"status":"not treated","reservation_date":"2025-02-10 10:57:36","uploaded":"2025-02-10 14:38:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3892.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2501992.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502016","title":"Remove NOTE 6 for S&F","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove NOTE 6","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13250,"status":"noted","reservation_date":"2025-02-10 12:10:50","uploaded":"2025-02-10 14:38:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3893.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502016.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502038","title":"Support of Attach with PDN connection for split MME architecture","source":"[LG Electronics, NEC, Samsung],CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Support of Attach with PDN connection is handled based on implementation with example.","secretary_remarks":"Revision of (Postponed) S2-2500551 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13000,"status":"not treated","reservation_date":"2025-02-10 12:42:38","uploaded":"2025-02-10 12:48:47","revisionof":"S2-2500551","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3854.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502038.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502058","title":"Update for support of UE-Satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN on how the AMF identifies the satellite hosting the gNB serving the UE. Modify 'user plane traffic' to 'IMS user plane traffic', and clarify that the UPF on ground is selected during PDU Session establishment procedure. Add the functionalities of AMF and SMF to support UE-SAT-UE communication.","secretary_remarks":"Revised in parallel session to S2-2502242.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13500,"status":"revised","reservation_date":"2025-02-10 13:00:12","uploaded":"2025-02-10 13:02:59","revisionof":"","revisedto":"S2-2502242","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6144.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502058.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.1, 5.4.14.2, 6.2.1, 6.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502060","title":"Clarification on the condition for UE indicating S&F capability","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the definition of satellite is operating in S&F mode.","secretary_remarks":"Revised in parallel session to S2-2502248.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13220,"status":"revised","reservation_date":"2025-02-10 13:07:26","uploaded":"2025-02-10 13:35:49","revisionof":"","revisedto":"S2-2502248","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3894.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502060.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502061","title":"Update S&F Monitoring List info in the SERVICE REQUEST procedure","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added the transmission info about the S&F Monitoring List in the Mobile Originated Data Transport in Control Plane CIoT EPS Optimisation with P-GW connectivity procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12740,"status":"not treated","reservation_date":"2025-02-10 13:07:27","uploaded":"2025-02-10 13:35:49","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3895.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502061.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502062","title":"Clarification on the MME's authentication behavior in NAS procedure","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarified the condition for MME's authentication behavior. 2) Modified the MME's authentication and Update Location procedure after rejecting the UE in the case of TAU procedure.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13180,"status":"noted","reservation_date":"2025-02-10 13:07:28","uploaded":"2025-02-10 13:35:49","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3896.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502062.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502063","title":"Update to Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add supplementary constraints for the satellites in the S&F Monitoring List. Clarify the condition to send the S&F Wait Timer and S&F monitoring list","secretary_remarks":"Revision of (Agreed) S2-2501339 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12660,"status":"not treated","reservation_date":"2025-02-10 13:07:29","uploaded":"2025-02-10 13:35:49","revisionof":"S2-2501339","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":12.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502063.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502075","title":"HSS table clarification","source":"Samsung, Ericsson","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct the wording the HSS table regarding term timestamp.","secretary_remarks":"Revision of (Postponed) S2-2501038. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13050,"status":"agreed","reservation_date":"2025-02-10 13:47:51","uploaded":"2025-02-10 13:53:51","revisionof":"S2-2501038","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3879.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502075.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502100","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, [China Telecom, Samsung]","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF via PCF.","secretary_remarks":"Revision of (Agreed) S2-2501093. Confirm CR Revision - CR states 64 (Rev Marks)! Revised in parallel session to S2-2502243.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13530,"status":"revised","reservation_date":"2025-02-10 14:45:59","uploaded":"2025-02-10 16:15:47","revisionof":"S2-2501093","revisedto":"S2-2502243","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502100.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502101","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, [Samsung, China Telecom]","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of (Agreed) S2-2501094. Confirm CR Revision - CR states 54 (Rev Marks)! Revised in parallel session to S2-2502244.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13570,"status":"revised","reservation_date":"2025-02-10 14:49:17","uploaded":"2025-02-10 16:16:13","revisionof":"S2-2501094","revisedto":"S2-2502244","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1429.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502101.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502123","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2","secretary_remarks":"Revision of (Unhandled) S2-2501035. Response to S2-2501368 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12830,"status":"not treated","reservation_date":"2025-02-10 15:40:50","uploaded":"2025-02-10 15:45:07","revisionof":"S2-2501035","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502123.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502129","title":"Clarification related to terminology and on MME providing list in detach procedure.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Align the terminologies used across the spec. 2) Its clarified that MME may provide the list of satellite IDs to the UE as part of the detach procedure.","secretary_remarks":"Revised in parallel session to S2-2502246.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13150,"status":"revised","reservation_date":"2025-02-10 16:41:19","uploaded":"2025-02-10 16:50:09","revisionof":"","revisedto":"S2-2502246","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3897.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502129.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502140","title":"Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, Nokia], CSCN","contact":"Yuanxing Xue","contact-id":103565,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove unnessary description in NOTE to avoid misunderstanding.","secretary_remarks":"Revision of (Agreed) S2-2500719 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13290,"status":"not treated","reservation_date":"2025-02-10 17:51:48","uploaded":"2025-02-10 18:10:21","revisionof":"S2-2500719","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1562.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502140.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502166","title":"UE Detach for S&F Mode Access","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Allow a UE to detach locally in Annex O.3.2.","secretary_remarks":"Revision of (Noted) S2-2501040. Revised in parallel session to S2-2502191.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13020,"status":"revised","reservation_date":"2025-02-10 21:12:46","uploaded":"2025-02-10 21:31:39","revisionof":"S2-2501040","revisedto":"S2-2502191","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3880.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502166.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502167","title":"Transition between S&F Mode and Normal Mode","source":"Qualcomm Incorporated, NEC","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"Revision of (Postponed) S2-2501041. Revised in parallel session to S2-2502189.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12850,"status":"revised","reservation_date":"2025-02-10 21:18:49","uploaded":"2025-02-10 21:31:39","revisionof":"S2-2501041","revisedto":"S2-2502189","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":3.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502167.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502172","title":"Support of S&F Monitoring List in S&F Mode","source":"[Huawei, HiSilicon, Samsung], Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. Rev 3 MME to provide additional indication in the reject message, so that the UE can remain EMM state. The Rev2 changes are highlighted with yellow color.","secretary_remarks":"Revision of S2-2501613 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12670,"status":"not treated","reservation_date":"2025-02-10 22:18:00","uploaded":"2025-02-10 22:23:10","revisionof":"S2-2501613","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":13.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502172.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502185","title":"AMF selection for regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the text in NOTE 1 under bullet 2) with the introduction sentence above","secretary_remarks":"Revision of S2-2501610. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12480,"status":"agreed","reservation_date":"2025-02-21 06:39:59","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501610","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5908.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502185.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502186","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon [, Samsung]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of S2-2501961. Revised in parallel session to S2-2502448.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon [, Samsung]","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12540,"status":"revised","reservation_date":"2025-02-21 06:40:00","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501961","revisedto":"S2-2502448","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":14.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502186.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502187","title":"Procedure updates for S&F","source":"[vivo, Huawei, HiSilicon], Sateliot, [Nokia, ZTE, Xiaomi]","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures. Align the description of related S&F procedures and wording with the solution described into clause 4.13.9","secretary_remarks":"Revision of S2-2501740. Revised in parallel session to S2-2502275.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12690,"status":"revised","reservation_date":"2025-02-21 06:40:01","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501740","revisedto":"S2-2502275","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502187.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502188","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3. Attachments: TS 23.401 CR3867","secretary_remarks":"Revision of S2-2501924. Revised in parallel session to S2-2502450.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12780,"status":"revised","reservation_date":"2025-02-21 06:40:02","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501924","revisedto":"S2-2502450","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502188.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502189","title":"Transition between S&F Mode and Normal Mode","source":"Qualcomm Incorporated, NEC","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"Revision of S2-2502167. Revised in parallel session to S2-2502451.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12860,"status":"revised","reservation_date":"2025-02-21 06:40:02","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502167","revisedto":"S2-2502451","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":4.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502189.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502190","title":"No Necessity to define UE in S&F mode","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: remove the defintion regarding 'UE in S&F Mode'","secretary_remarks":"Revision of S2-2501780. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12970,"status":"noted","reservation_date":"2025-02-21 06:40:03","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501780","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3848.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502190.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502191","title":"UE Detach for S&F Mode Access","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Allow a UE to detach locally in Annex O.3.2.","secretary_remarks":"Revision of S2-2502166. Revised in parallel session to S2-2502506.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13030,"status":"revised","reservation_date":"2025-02-21 06:40:04","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502166","revisedto":"S2-2502506","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3880.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502191.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502192","title":"Update on S&F Satellite Operation for UE and MME","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update on S&F operation for UE and MME to not perform procedures of enhanced discontinuous coverage.","secretary_remarks":"Revision of S2-2501816. Revised in parallel session to S2-2502452 (withdrawn). Noted in parallel session<br\/><br\/>Source modified on 25\/02\/2025. Original source : China Telecom","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13080,"status":"revised","reservation_date":"2025-02-21 06:40:06","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501816","revisedto":"S2-2502452","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3890.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502192.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502236","title":"Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, Nokia], China Telecom, vivo, CSCN","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Revision of S2-2501810, merging S2-2501666. Revised in parallel session to S2-2502458.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13270,"status":"revised","reservation_date":"2025-02-21 06:40:42","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501810","revisedto":"S2-2502458","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1562.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502236.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502237","title":"Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, Nokia, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS. Modifications in this revision (highlighted): Modify the description of optimized media routing activation upon satellite change. Modify the description regarding IMS AGW change. Clarify the message used and references for functional description. Editorial modifications.","secretary_remarks":"Revision of S2-2501931. Revised in parallel session to S2-2502459.<br\/><br\/>Source modified on 25\/02\/2025. Original source : [NTT DOCOMO, Nokia, China Telecom,] CATT","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13320,"status":"revised","reservation_date":"2025-02-21 06:40:43","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501931","revisedto":"S2-2502459","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1561.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502237.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.2.2.1, AE.2.2.2 (new), AE.3.3 (new), AE.4.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502238","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Early media traffic is discussed separately. - P-CSCF subscribes to Notification of User Plane Management Events for satellite change.","secretary_remarks":"Revision of S2-2501941. Revised in parallel session to S2-2502507.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13350,"status":"revised","reservation_date":"2025-02-21 06:40:44","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501941","revisedto":"S2-2502507","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502238.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502239","title":"Mobility procedure for UE-Satellite-UE communication in IMS \u2013 continuation of optimized media routing","source":"[NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing. Modifications in this revision (highlighted): Clarify the service operation used and its content in step 6, and modify step 7 accordingly. Clarify that the UL CL and L-PSA on source satellite is retained and then released upon detection of no active traffic when session continuity upon UL CL relocation is used, in step 8 and 21. Clarify that steps 11-15 are performed in terminating network and steps 16-22 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of S2-2501932. Revised in parallel session to S2-2502508.<br\/><br\/>Title modified on 25\/02\/2025. Original title : Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing<br\/><br\/>Source modified on 25\/02\/2025. Original source : [NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13390,"status":"revised","reservation_date":"2025-02-21 06:40:45","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501932","revisedto":"S2-2502508","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502239.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2 (new), AE.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502240","title":"Mobility procedure for UE-Satellite-UE communication in IMS \u2013 ground fallback","source":"[NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback. Modifications in this revision (highlighted): Clarify the service operation used and its content in step 6 and 12. Clarify that the UL CL and L-PSA on source satellite is released upon detection of no active traffic when session continuity upon UL CL relocation is used, in step 24. Clarify that steps 9-16 are performed in terminating network and steps 17-23 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of S2-2501933. Revised in parallel session to S2-2502509.<br\/><br\/>Title modified on 25\/02\/2025. Original title : Mobility procedure for UE-Satellite-UE communication in IMS ground fallback<br\/><br\/>Source modified on 25\/02\/2025. Original source : [NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom,] CATT","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13420,"status":"revised","reservation_date":"2025-02-21 06:40:45","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501933","revisedto":"S2-2502509","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502240.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502241","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"[vivo, CSCN, Tencent, Honor, Thales,] CATT, [NTT DOCOMO, China Telecom]","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes. Modifications in this revision (highlighted): Clarify that the SMF can decide whether to route IMS user plane traffic via UPF on ground or retain the UL CL\/L-PSA on satellite based on local configuration and existing UPF selection criteria. Clarify that when serving satellite changes, the UE may be handed over to a target gNB on ground. Correct some inaccurate descriptions (e.g. 'route the PDU Session to the PSA on ground') and editorial modifications (e.g. change 'UE-SAT-UE' to 'UE-SAT-UE communication').","secretary_remarks":"Revision of S2-2501929. Revised in parallel session to S2-2502510.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13450,"status":"revised","reservation_date":"2025-02-21 06:40:46","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501929","revisedto":"S2-2502510","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":12.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502241.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502242","title":"Update for support of UE-Satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN on how the AMF identifies the satellite hosting the gNB serving the UE. Modify 'user plane traffic' to 'IMS user plane traffic', and clarify that the UPF on ground is selected during PDU Session establishment procedure. Add the functionalities of AMF and SMF to support UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2502058. Revised in parallel session to S2-2502511.<br\/><br\/>Source modified on 25\/02\/2025. Original source : CATT","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13510,"status":"revised","reservation_date":"2025-02-21 06:40:47","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502058","revisedto":"S2-2502511","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6144.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502242.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.1, 5.4.14.2, 6.2.1, 6.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502243","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, [China Telecom], Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF via PCF.","secretary_remarks":"Revision of S2-2502100. Revised in parallel session to S2-2502512.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13540,"status":"revised","reservation_date":"2025-02-21 06:40:49","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502100","revisedto":"S2-2502512","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502243.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502244","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, [Samsung, China Telecom]","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of S2-2502101. Withdrawn","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13580,"status":"withdrawn","reservation_date":"2025-02-21 06:40:50","uploaded":null,"revisionof":"S2-2502101","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1429.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502245","title":"Clarification on support of Store and Forward Satellite Operation","source":"ZTE Corporation","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Clarify MME selection for UE supporting S&F; 2) Clarify on-board eNB broadcasted information for S&F; and 3) Clarify that MME provides S&F support indication to UE in attach accept or TAU accept message.","secretary_remarks":"Revision of S2-2501695. Revised in parallel session to S2-2502454.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13130,"status":"revised","reservation_date":"2025-02-21 06:40:50","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501695","revisedto":"S2-2502454","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3889.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502245.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502246","title":"Clarification related to terminology and on MME providing list in detach procedure.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Align the terminologies used across the spec. 2) Its clarified that MME may provide the list of satellite IDs to the UE as part of the detach procedure.","secretary_remarks":"Revision of S2-2502129. Revised in parallel session to S2-2502455.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Samsung","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13160,"status":"revised","reservation_date":"2025-02-21 06:40:52","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502129","revisedto":"S2-2502455","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3897.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502246.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502247","title":"Align terminology for store and forward operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Replace 'Downlink S&F estimated Delivery Time' by 'Estimated S&F DL Delivery Time'.","secretary_remarks":"Revision of S2-2501962. Revised in parallel session to S2-2502456.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13200,"status":"revised","reservation_date":"2025-02-21 06:40:53","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2501962","revisedto":"S2-2502456","release":"Rel-19","crspec":"23.682","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":497.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502247.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.6.3.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502248","title":"Clarification on the condition for UE indicating S&F capability","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the definition of satellite is operating in S&F mode.","secretary_remarks":"Revision of S2-2502060. Revised in parallel session to S2-2502457.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13230,"status":"revised","reservation_date":"2025-02-21 06:40:54","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502060","revisedto":"S2-2502457","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3894.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502248.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502275","title":"Procedure updates for S&F","source":"[vivo, Huawei, HiSilicon], Sateliot, [Nokia, ZTE, Xiaomi]","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures. Align the description of related S&F procedures and wording with the solution described into clause 4.13.9","secretary_remarks":"Revision of S2-2502187. Revised in parallel session to S2-2502449.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12700,"status":"revised","reservation_date":"2025-02-21 06:41:19","uploaded":"2025-02-25 15:11:05","revisionof":"S2-2502187","revisedto":"S2-2502449","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502275.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502448","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon [, Samsung]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of S2-2502186. Revised in parallel session to S2-2502513.<br\/><br\/>Source modified on 25\/02\/2025. Original source : Huawei, HiSilicon [, Samsung]","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12550,"status":"revised","reservation_date":"2025-02-21 06:43:44","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502186","revisedto":"S2-2502513","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":15.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502448.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502449","title":"Procedure updates for S&F","source":"[vivo, Huawei, HiSilicon], Sateliot, [Nokia, ZTE, Xiaomi]","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures. Align the description of related S&F procedures and wording with the solution described into clause 4.13.9","secretary_remarks":"Revision of S2-2502275. Revised in parallel session to S2-2502514.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12710,"status":"revised","reservation_date":"2025-02-21 06:43:45","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502275","revisedto":"S2-2502514","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502449.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502450","title":"Reply LS on Satellite IDs for store-and-forward operation","source":"SA WG2","contact":"Yingying Liu","contact-id":94862,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3","secretary_remarks":"Revision of S2-2502188. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12790,"status":"approved","reservation_date":"2025-02-21 06:43:45","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502188","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2501368","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502450.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502451","title":"Transition between S&F Mode and Normal Mode","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"Revision of S2-2502189. Revised in parallel session to S2-2502525.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12870,"status":"revised","reservation_date":"2025-02-21 06:43:45","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502189","revisedto":"S2-2502525","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":5.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502451.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502452","title":"Update on S&F Satellite Operation for UE and MME","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update on S&F operation for UE and MME to not perform procedures of enhanced discontinuous coverage.","secretary_remarks":"Revision of S2-2502192. Withdrawn","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13090,"status":"withdrawn","reservation_date":"2025-02-21 06:43:46","uploaded":null,"revisionof":"S2-2502192","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3890.0,"crrevision":2.0,"crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502453","title":"Clarification on S&F wait timer","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the following NOTE: NOTE X: 'When the S&F wait timer is running, the power consumption optimization behaviours, if any, are left for UE implementation e.g., whether to listen to paging or deactivate its Access Stratum functions'.","secretary_remarks":"Revision of S2-2501688. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13110,"status":"agreed","reservation_date":"2025-02-21 06:43:48","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2501688","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3887.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502453.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502454","title":"Clarification on support of Store and Forward Satellite Operation","source":"ZTE Corporation","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify for MME selection.","secretary_remarks":"Revision of S2-2502245. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13140,"status":"agreed","reservation_date":"2025-02-21 06:43:50","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502245","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3889.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502454.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"4.3.8.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502455","title":"Clarification related to terminology and on MME providing list in detach procedure.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Align the terminologies used across the spec. 2) Its clarified that MME may provide the list of satellite IDs to the UE as part of the detach procedure.","secretary_remarks":"Revision of S2-2502246. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13170,"status":"agreed","reservation_date":"2025-02-21 06:43:51","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502246","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3897.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502455.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.3.8.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502456","title":"Align terminology for store and forward operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Replace 'Downlink S&F estimated Delivery Time' by 'Estimated S&F DL Delivery Time'.","secretary_remarks":"Revision of S2-2502247. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13210,"status":"agreed","reservation_date":"2025-02-21 06:43:52","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502247","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":497.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502456.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.6.3.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502457","title":"Clarification on the condition for UE indicating S&F capability","source":"ZTE","contact":"Yiting Zhou","contact-id":107093,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the definition of satellite is operating in S&F mode.","secretary_remarks":"Revision of S2-2502248. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13240,"status":"agreed","reservation_date":"2025-02-21 06:43:52","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502248","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3894.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502457.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502458","title":"Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS","source":"NTT DOCOMO, Nokia, China Telecom, vivo, CSCN","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Revision of S2-2502236. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13280,"status":"agreed","reservation_date":"2025-02-21 06:43:54","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502236","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1562.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502458.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.3.2, AE.4.2, AE.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502459","title":"Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS","source":"NTT DOCOMO, Nokia, China Telecom, CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS. Modifications in this revision: Modify the description of optimized media routing activation upon satellite change. Modify the description regarding IMS AGW change. Clarify the message used and references for functional description. Editorial modifications.","secretary_remarks":"Revision of S2-2502237. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13330,"status":"agreed","reservation_date":"2025-02-21 06:43:55","uploaded":"2025-02-25 15:11:07","revisionof":"S2-2502237","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1561.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502459.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.2.2.1, AE.2.2.2 (new), AE.3.3 (new), AE.4.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502506","title":"UE Detach for S&F Mode Access","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Allow a UE to detach locally in Annex O.3.2.","secretary_remarks":"Revision of S2-2502191. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13040,"status":"agreed","reservation_date":"2025-02-21 06:46:04","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502191","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3880.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502506.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"Annex O.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502507","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT, Ericsson","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Early media traffic is discussed separately. - P-CSCF subscribes to Notification of User Plane Management Events for satellite change.","secretary_remarks":"Revision of S2-2502238. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13360,"status":"agreed","reservation_date":"2025-02-21 06:46:05","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502238","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502507.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502508","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom, CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing. Modifications in this revision: Clarify the service operation used and its content in step 6. Clarify that the UL CL and L-PSA on source satellite is retained and then released upon detection of no active traffic when session continuity upon UL CL relocation is used, in step 8 and 21. Clarify that steps 11-15 are performed in terminating network and steps 16-22 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of S2-2502239. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13400,"status":"agreed","reservation_date":"2025-02-21 06:46:06","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502239","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502508.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2 (new), AE.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502509","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom, CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback. Modifications in this revision: Clarify the service operation used and its content in step 6 and 12. Clarify that the UL CL and L-PSA on source satellite is released upon detection of no active traffic in step 24. Clarify that steps 9-16 are performed in terminating network and steps 17-23 are performed in originating network. Editorial modifications.","secretary_remarks":"Revision of S2-2502240. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13430,"status":"agreed","reservation_date":"2025-02-21 06:46:06","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502240","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502509.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502510","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, Thales, CATT, NTT DOCOMO, China Telecom, Huawei, HiSilicon","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes. Modifications in this revision: Clarify that the SMF can decide whether to route IMS user plane traffic via UPF on ground or retain the UL CL\/L-PSA on satellite based on local configuration and existing UPF selection criteria. Correct some inaccurate descriptions (e.g. 'route the PDU Session to the PSA on ground') and editorial modifications (e.g. change 'UE-SAT-UE' to 'UE-SAT-UE communication').","secretary_remarks":"Revision of S2-2502241. Revised in parallel session to S2-2502526.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13460,"status":"revised","reservation_date":"2025-02-21 06:46:07","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502241","revisedto":"S2-2502526","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":13.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502510.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502511","title":"Update for support of UE-Satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Resolve the EN on how the AMF identifies the satellite hosting the gNB serving the UE. Modify 'user plane traffic' to 'IMS user plane traffic', and clarify that the UPF on ground is selected during PDU Session establishment procedure. Add the functionalities of AMF and SMF to support UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2502242. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13520,"status":"agreed","reservation_date":"2025-02-21 06:46:08","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502242","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":6144.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502511.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.1, 5.4.14.2, 6.2.1, 6.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502512","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, China Telecom, Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF via PCF.","secretary_remarks":"Revision of S2-2502243. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13550,"status":"agreed","reservation_date":"2025-02-21 06:46:09","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502243","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502512.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502513","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon, Samsung","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of S2-2502448. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12560,"status":"agreed","reservation_date":"2025-02-21 06:46:10","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502448","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":16.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502513.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502514","title":"Procedure updates for S&F","source":"Vivo, Huawei, HiSilicon, Sateliot, Nokia, ZTE, Xiaomi, Samsung","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures. Align the description of related S&F procedures and wording with the solution described in clause 4.13.9.","secretary_remarks":"Revision of S2-2502449. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12720,"status":"agreed","reservation_date":"2025-02-21 06:46:11","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502449","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502514.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502525","title":"Transition between S&F Mode and Normal Mode","source":"Qualcomm Incorporated, NEC","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"Revision of S2-2502451. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":12880,"status":"agreed","reservation_date":"2025-02-21 06:46:17","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502451","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":6.0,"crcategory":"C","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502525.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2502526","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, Thales, CATT, NTT DOCOMO, China Telecom, Huawei, HiSilicon","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes. Modifications in this revision: Clarify that the SMF can decide whether to route IMS user plane traffic via UPF on ground or retain the UL CL\/L-PSA on satellite based on local configuration and existing UPF selection criteria. Correct some inaccurate descriptions (e.g. 'route the PDU Session to the PSA on ground') and editorial modifications (e.g. change 'UE-SAT-UE' to 'UE-SAT-UE communication').","secretary_remarks":"Revision of S2-2502510. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase 3 (5GSAT_Ph3_ARC)","tdoc_agenda_sort_order":13470,"status":"agreed","reservation_date":"2025-02-21 06:46:17","uploaded":"2025-02-25 15:11:08","revisionof":"S2-2502510","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":14.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_167_Athens_2025-02\/Docs\/S2-2502526.zip","group":"S2","meeting":"S2-167","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.14.y (new)","crsinpack":null,"crsinpacknumber":0}]