[{"name":"S2-2411306","title":"LS from RAN WG3: LS on OAM requirements to support regenerative payload","source":"RAN WG3","contact":"Jiancheng SUN","contact-id":62128,"tdoctype":"LS in","for":"Action","abstract":"RAN WG3 discussed the potential issues on support of regenerative payload for NR NTN, RAN WG3 has agreed OAM based solution, which assumes that the information of supported TAIs for NTN gNB is provided to AMF by OAM. Action: RAN WG3 respectfully requests SA WG2 and SA WG5 to take above into account.","secretary_remarks":"Responses drafted in S2-2412007, S2-2412305. Final response in S2-2413030.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11280,"status":"replied to","reservation_date":"2024-10-25 13:46:54","uploaded":"2024-10-25 13:52:49","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, SA WG5","Cc":"","lsoriginalls":"R3-245845","lsreply":"S2-2413030","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411306.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411313","title":"LS from SA WG3-LI: Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG3-LI","contact":"Jason Graham","contact-id":85900,"tdoctype":"LS in","for":"Action","abstract":"SA WG3-LI thanks SA WG2 for the reply LS on FS_5GSAT_Ph3_ARCH conclusions (S2-2411250) and SA WG3 for the original LS (S3 243533). SA WG3-LI provides feedback to some of the points raised by SA WG2 and SA WG3. {. . .} Action: SA WG3-LI kindly asks that SA WG2 takes the above into account and answer the following: 1. For split MME, will all events that occur when only the UE service link is available be sent to the MME-ground when the link to the ground based core network is re-established. a. If so, will the time each event occurred and the location of the UE at the time of the original event be available at the MME-ground. 2. For full EPC onboard, if the full CN is onboard each satellite, will any network elements other than the HSS synchronize context between satellites? 3. Does SA WG2 believe there are any additional issues SA WG3-LI should be aware of for S&F architectures or scenarios? 4. Is SA WG2 aware of any information that would help SA WG3-LI develop a solution that can meet the requirements listed above.","secretary_remarks":"Responses drafted in S2-2411623, S2-2412238, S2-2412294. Postponed in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11470,"status":"postponed","reservation_date":"2024-10-25 13:46:54","uploaded":"2024-11-05 11:39:05","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG2, SA WG3","lsoriginalls":"S3i240703","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411313.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411348","title":"LS from SA WG3-LI: Reply LS on UE-Satellite-UE Communication Architectures","source":"SA WG3-LI","contact":"Nagaraja Rao","contact-id":77267,"tdoctype":"LS in","for":"Action","abstract":"SA WG3-LI thanks SA WG2 for their LS and the clarification in pursuing the UE-Satellite-UE communication architectures. Point number 1 In reference to point number 1 (where the IMS-AGW would be on-board the satellite), SA WG3-LI would update LI specifications to accommodate the possibility of a change in the IMS-AGW during an active IMS Session. SA WG3 LI believes that LI can be performed as long as P-CSCF is in control of the IMS-AGW change. Point number 2 In reference to point number 2 (where an intermediate UPF (I-UPF) is inserted to the media path with no IMS-AGW for a UE-Satellite-UE communication) the LI specifications for IMS LI will have to be enhanced. SA WG3-LI believes to support such an architecture, P-CSCF needs sufficient information to isolate the media flow packets for all IMS sessions, at any time during the IMS session. In SA WG3-LI understanding, the following are required for all UE-Satellite-UE IMS sessions, independent of LI: - P-CSCF is able to identify the I-UPF. For this, I-UPF address\/identity will be made available to the P-CSCF. - P-CSCF is able to identify the tunnel used for the IMS media flow. For this, the tunnel ID used at the I-UPF will be made available to the P-CSCF. If a point-to-point tunnel is used (e.g. on N6), then the UDP port number along with the IP address of the I-UPF shall be made available to the P-CSCF. - P-CSCF is able to identify the UDP port number (RTP) used for the media packets. Port numbers from the access side (N3) and the core-side (N6) will be available. - P-CSCF is able to identify the QoS flow. For this, the QFI associated with QoS flow will be made available to the P-CSCF. SA WG3-LI kindly asks SA WG2 to confirm the above understanding. Action: SA WG3-LI kindly asks SA WG2 to: - In reference to point 1, to confirm SA WG3-LI that P-CSCF will be able to determine as and when the IMS-AGW is changed during a mid-session irrespective of LI. - In reference to point 2, to inform SA WG3-LI whether the requirements listed in Point Number 2 are correct.","secretary_remarks":"Responses drafted in S2-2412044, S2-2412104. Final response in S2-2412670.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11940,"status":"replied to","reservation_date":"2024-04-11 06:29:06","uploaded":"2024-11-04 06:57:52","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"SA WG3, CT WG1, CT WG3, CT WG4","lsoriginalls":"S3i240752","lsreply":"S2-2412670, S2-2412670","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411348.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411421","title":"Annex update of Full EPC Store and Forward Satellite Operation","source":"[Qualcomm Incorporated, Huawei] China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add clarification of sending the MT data transferring result.","secretary_remarks":"Revision of (agreed) S2-2410991 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11830,"status":"not treated","reservation_date":"2024-05-11 11:57:48","uploaded":"2024-11-08 16:12:32","revisionof":"S2-2410991","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3815.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411421.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411422","title":"Enhancement to Split MME architecture","source":"[Samsung, Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO, SHARP, Nokia] China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A UE accesses and attaches operations to a satellite for Split MME architecture is added, based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (agreed) S2-2410990 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11800,"status":"not treated","reservation_date":"2024-05-11 11:59:01","uploaded":"2024-11-08 16:12:50","revisionof":"S2-2410990","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411422.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411448","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Sateliot, Qualcomm, LGE, Intel,] OPPO, [SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. The new changes introduced in Revision 15 are as below: Resolve the EN on S&F monitoring list related aspects, add the description of S&F timer, S&F monitoring list. Resolve the EN on the estimated delivery time.","secretary_remarks":"Revision of (postponed) S2-2410989. WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11590,"status":"not treated","reservation_date":"2024-06-11 02:28:00","uploaded":"2024-11-08 11:27:56","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":15.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411448.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411449","title":"Procedures for Store and Forward Satellite Operations","source":"[Huawei, HiSilicon], OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures. New Changes introduced in Revision 3: the provision of the S&F Wait Timer in accept messages is not optional, according to the TR conclusion MME may indicate to UE the estimated delivery time in NAS messages","secretary_remarks":"Revision of (postponed) S2-2410927 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11720,"status":"not treated","reservation_date":"2024-06-11 02:40:50","uploaded":"2024-11-08 11:34:51","revisionof":"S2-2410927","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3824.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411449.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.7.1, 5.11.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411456","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF. 2\/ Align Notification of User Plane Management Events to stage 3.","secretary_remarks":"Merged into S2-2412452","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12360,"status":"merged","reservation_date":"2024-06-11 08:34:04","uploaded":"2024-11-08 20:15:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5128.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411456.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411457","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Satellite identity is sent to PCF from SMF in the SM Policy Association messages.","secretary_remarks":"Revised in parallel session to S2-2412452, merging S2-2412243 and S2-2411456","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12370,"status":"revised","reservation_date":"2024-06-11 08:38:19","uploaded":"2024-11-08 20:19:51","revisionof":"","revisedto":"S2-2412452","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5129.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411457.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411458","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revised in parallel session to S2-2412453.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12400,"status":"revised","reservation_date":"2024-06-11 08:41:34","uploaded":"2024-11-08 20:20:11","revisionof":"","revisedto":"S2-2412453","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1429.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411458.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411464","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"[Huawei, HiSilicon, China Telecom, CATT], NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication. Revision 4: P-CSCF subscription to user plane management event notifications.","secretary_remarks":"Revision of (agreed) S2-2410987 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12100,"status":"not treated","reservation_date":"2024-06-11 08:55:42","uploaded":"2024-11-08 20:20:53","revisionof":"S2-2410987","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411464.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411540","title":"Support for Regenerative based satellite access","source":"ETRI","contact":"Yoohwa Kang","contact-id":63871,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: To align with the approved CR for 3GPP TS 23.501,N2 and Handover procedures have been updated to support regenerative based satellite access.","secretary_remarks":"Revision of (unhandled) S2-2410308 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11410,"status":"not treated","reservation_date":"2024-07-11 08:07:09","uploaded":"2024-11-07 08:37:57","revisionof":"S2-2410308","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5085.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411540.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2.7.1, 4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411623","title":"[DRAFT] Reply LS to s3i240703","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply LS to s3i240703","secretary_remarks":"Response to S2-2411313 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11490,"status":"not treated","reservation_date":"2024-07-11 15:44:26","uploaded":"2024-11-08 13:46:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"RAN WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411623.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411654","title":"Support for satellite access with regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for regenerative payload.","secretary_remarks":"Revision of (postponed) S2-2410021 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11450,"status":"not treated","reservation_date":"2024-07-11 16:42:38","uploaded":"2024-11-08 22:37:35","revisionof":"S2-2410021","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3820.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411654.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 4.13.1, 4.13.2, 4.13.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411675","title":"On the use of monitoring list and wait time for S&F.","source":"Qualcomm Incorporated, Sateliot","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"discussion","for":"Approval","abstract":"Discusses the possible use of monitoring list and wait timer for S&F .","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11510,"status":"noted","reservation_date":"2024-07-11 17:10:33","uploaded":"2024-11-07 19:51:24","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411675.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411676","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"[OPPO, Huawei, HiSilicon, China Telecom, ETRI, China Southern Power Grid, Samsung, Xiaomi], Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings. OAM based solution, assumes that the information of supported TAIs for NTN gNB is provided to AMF by OAM","secretary_remarks":"Revision of (agreed) S2-2411251 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11370,"status":"not treated","reservation_date":"2024-07-11 17:13:23","uploaded":"2024-11-07 19:51:24","revisionof":"S2-2411251","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411676.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.2, 5.4.11.x (new), 5.7.4, 6.2.1, 6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411702","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: NOTE for intra-NG-RAN node handover is extended to reflect the above conclusion in TS 23.700-29.","secretary_remarks":"Revision of (unhandled) S2-2410196 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11400,"status":"not treated","reservation_date":"2024-07-11 20:05:43","uploaded":"2024-11-08 14:54:47","revisionof":"S2-2410196","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":4994.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411702.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411724","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Sateliot, Qualcomm], LGE, [Intel, OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Rev. 16 - Clarified the handling of S&F Monitoring list depending on the reject cause. - Clarified estimated delivery time","secretary_remarks":"Revision of (postponed) S2-2410989 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11600,"status":"not treated","reservation_date":"2024-08-11 00:27:13","uploaded":"2024-11-08 10:17:45","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":16.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411724.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411725","title":"Procedures for Store and Forward Satellite Operations","source":"[Huawei, HiSilicon], LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures. Rev. 4 - Terminology for S&F reject cause is aligned. - Some text is restored from previous version to clarify the Update Location Request for S&F operation","secretary_remarks":"Revision of (postponed) S2-2410927 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11730,"status":"not treated","reservation_date":"2024-08-11 00:28:15","uploaded":"2024-11-08 10:17:45","revisionof":"S2-2410927","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3824.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411725.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.7.1, 5.11.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411726","title":"Monitoring event for S&F","source":"[Samsung, Sateliot, China Telecom, NEC, CATT], LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. Rev.8: EN for feeder link availability period is removed.","secretary_remarks":"Revision of (agreed) S2-2410985 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11880,"status":"not treated","reservation_date":"2024-08-11 00:29:44","uploaded":"2024-11-08 10:17:45","revisionof":"S2-2410985","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411726.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"(new)5.6.1.X, (new)5.6.3.X","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411727","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"[OPPO, Huawei, HiSilicon, China Telecom, ETRI, China Southern Power Grid, Samsung, Xiaomi], LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings. Rev. 7 A NOTE is added that supported TAIs for NG-RAN is provided to AMF by OAM for regenerative satellite payload.","secretary_remarks":"Revision of (agreed) S2-2411251 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11380,"status":"not treated","reservation_date":"2024-08-11 00:30:49","uploaded":"2024-11-08 10:17:45","revisionof":"S2-2411251","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5622.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411727.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.2, 5.4.11.x (new), 5.7.4, 6.2.1, 6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411813","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent], vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. New revision includes: - Clarify that the UE is not mandatory to select the SAT in the S&F monitoring list - add mobile reachable timer when considering S&F - make sure the cause for non-specific to S&F Mode' is 'the selected PLMN is not allowed to operate at the present UE location' - add NOTE to limit usage of S&F wait timer.","secretary_remarks":"Revision of (postponed) S2-2410989. WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11610,"status":"not treated","reservation_date":"2024-08-11 06:14:29","uploaded":"2024-11-08 11:03:04","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":17.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411813.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411814","title":"Procedures for Store and Forward Satellite Operations","source":"[Huawei, HiSilicon], vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures. New revision: Clean the change on change Add processing about the PDN connectivity established during the attach procedure under the S&F mode. Add 8th change about the S&F operation applying to the UE requested PDN connectivity procedure","secretary_remarks":"Revision of (postponed) S2-2410927 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11740,"status":"not treated","reservation_date":"2024-08-11 06:14:30","uploaded":"2024-11-08 11:03:04","revisionof":"S2-2410927","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411814.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.7.1, 5.11.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411815","title":"Updates to Reachability Management for UE in ECM-IDLE state and S&F mode","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the UE behavior that before the S&F waut timer expires, the UE can deactive the AS function for power saving.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11890,"status":"not treated","reservation_date":"2024-08-11 06:14:31","uploaded":"2024-11-08 11:03:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3836.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411815.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411816","title":"Procedures support of Regenerative Regenerative-based satellite access","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add N2 Removal Add the information of supported TAIs for NTN gNB is provided to AMF by OAM","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11420,"status":"not treated","reservation_date":"2024-08-11 06:14:32","uploaded":"2024-11-08 11:03:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5151.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411816.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411817","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"[OPPO, Huawei, HiSilicon, China Telecom, ETRI, China Southern Power Grid, Samsung, Xiaomi], vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings. Add the 'The Tracking Area(s) that the 5G-AN serves are provisioned in AMF by OAM\/pre-configuration.' To align RAN WG3 progress for AMF to know the TAI of the on-board GNB","secretary_remarks":"Revision of (agreed) S2-2411251 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11390,"status":"not treated","reservation_date":"2024-08-11 06:14:33","uploaded":"2024-11-08 11:03:04","revisionof":"S2-2411251","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411817.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.2, 5.4.11.x (new), 5.7.4, 6.2.1, 6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411844","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, [Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Rev 18: the S&F monitoring list is optional during both NAS rejection and acceptance. Added UE behaviour wrt S&F monitoring list.","secretary_remarks":"Revision of (postponed) S2-2410989. WI Code should be 5GSAT_Ph3-ARC on CR. Revised in parallel session to S2-2412639.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11550,"status":"revised","reservation_date":"2024-08-11 07:18:53","uploaded":"2024-11-08 13:32:27","revisionof":"S2-2410989","revisedto":"S2-2412639","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":18.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411844.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411851","title":"Monitoring event for S&F","source":"Samsung, [Sateliot, China Telecom, NEC, CATT]","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. This revision over agreed version in SA WG2#165 proposes to resolve this EN: Editor's note: Whether feeder link availability period will be provided to SCS\/AS is FFS. There are two choices: a) Introduce this feeder link availability period parameter (as proposed in this CR - highlighted with yellow); or b) Remove the EN with a conclusion that this parameter is not required. After the discussion, this CR can be updated in one of the above directions. As a compromise for companies who are not interested in feeder link availability period parameter, this parameter can be kept optional. This implies: a) If this parameter is included, AF can accurately know when to send the data and delay in sending data b) If this parameter is not included then AF will have to estimate that data will be delivered to the UE with the max time of 'Estimated time to delivery' and this Estimated time to delivery network also considers the feeder link link availability time. For e.g.: Consider: a) Delivery time of data when feeder link available is 1 hour. b) Feeder link(FL) is available at 10 O clock and next FL availability time is after 6 hours. a) If feeder link availability information is provided(i.e. at 10) to the AF, then AF is aware based on when it has sent the data(e.g. at 9) UE will receive the data(e.g. by 11). b) If feeder link availability information is not provided. Then estimated delivery time value considering FL availability is 7 hours(1 hour to send data + 6 hours maximum time for FL to establish depeding on when data is sent to CN) AF will assume data will be delivered in 7 hours without accurately knowing when it can be delivered.","secretary_remarks":"Revision of (agreed) S2-2410985. Revised in parallel session to S2-2412642.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11850,"status":"revised","reservation_date":"2024-08-11 07:22:38","uploaded":"2024-11-08 07:42:15","revisionof":"S2-2410985","revisedto":"S2-2412642","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411851.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"(new)5.6.1.X, (new)5.6.3.X","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411854","title":"Architecture for UE-satellite-UE communicaitons without AGW on-board","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Added architecture to describe the entities and interfaces for UE-Sat-UE communication without IMS-AGW on-board.","secretary_remarks":"Confirm Specification Number - CR states 23.228! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12450,"status":"not treated","reservation_date":"2024-08-11 07:24:24","uploaded":"2024-11-08 13:46:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.288","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1285.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411854.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411856","title":"Introduction to Split MME architecture","source":"Samsung, [Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO, SHARP, Nokia]","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. Changes(highlighted in yellow) over agreed revision of SA WG2#165: a) Added linkage in other comments section for this reference used in the CR TS 23.682 [74] clause 5.6.1.X and 5.6.3.X) b) Editorial corrections in bullet 4. c) Clarified in bullet 2 that UE context can be stored on subset of MME-onboard(s) and it is not mandatory to store on all the MME-onboard(s) connected to MME-ground..","secretary_remarks":"Revision of (agreed) S2-2410990. Revised in parallel session to S2-2412641.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11780,"status":"revised","reservation_date":"2024-08-11 07:27:38","uploaded":"2024-11-08 07:42:15","revisionof":"S2-2410990","revisedto":"S2-2412641","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411856.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.1(new), Y.2(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411865","title":"Call setup of UE-Satellite-UE communication in IMS without IMS-AGW on board","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures for UE-SAT-UE communication without IMS-AGW on-board satellite.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12460,"status":"not treated","reservation_date":"2024-08-11 07:31:51","uploaded":"2024-11-08 13:49:31","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1514.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411865.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411881","title":"Discussion paper on mobility support","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"discussion","for":"Discussion","abstract":"Restrict scopes of mobility supports","secretary_remarks":"Revision of (agreed) S2-2410127 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12150,"status":"not treated","reservation_date":"2024-08-11 07:56:08","uploaded":"2024-11-08 15:13:43","revisionof":"S2-2410127","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411881.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411882","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"vivo, CSCN, Tencent, Honor, [Thales, CATT, NTT DOCOMO]","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes, basically: SMF needs to know the type of HO based on source and target satellite ID For N2-HO, UE-SAT-UE should be terminated. For Xn-HO, UL CL\/L-PSA is kept in source satellite until P-CSCF informs a DNAI.","secretary_remarks":"Revision of (unhandled) S2-2410315. Revised in parallel session to S2-2412451.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12290,"status":"revised","reservation_date":"2024-08-11 07:56:08","uploaded":"2024-11-08 15:13:43","revisionof":"S2-2410315","revisedto":"S2-2412451","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5518.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411882.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.x.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411888","title":"Functional descriptions of UE-satellite-UE communications when satellite changes","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 2 new clauses are added. mobility support of UE-SAT-UE communication when satellite changes AGW reallocation when satellite changes","secretary_remarks":"Revision of (unhandled) S2-2410125 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12020,"status":"not treated","reservation_date":"2024-08-11 07:58:54","uploaded":"2024-11-08 15:13:43","revisionof":"S2-2410125","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1476.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411888.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"AY.3.y(new), AY.4.y(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411889","title":"Procedures of UE-SAT-UE communications when satellite changes","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 2 new clauses regarding procedures: A new clause to depict AGW reallocation procedure in satellite change with UE-SAT-UE continues A new clause to depict AGW reallocation procedure in satellite change with UE-SAT-UE terminates","secretary_remarks":"Revision of (unhandled) S2-2410126 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12190,"status":"not treated","reservation_date":"2024-08-11 07:58:55","uploaded":"2024-11-08 15:13:43","revisionof":"S2-2410126","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1477.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411889.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"AY.5.Y (new), AY.5.Y.1 (new), AY.5.Y.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411950","title":"Discussion on early media during USU establishment.","source":"vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"discussion","for":"Discussion","abstract":"This document discusses the early media continuity during USU establishment procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12110,"status":"not treated","reservation_date":"2024-08-11 08:31:10","uploaded":"2024-11-08 13:37:06","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411950.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411951","title":"Call setup of UE-Satellite-UE communication with early media in IMS","source":"vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS.","secretary_remarks":"Revised in parallel session to S2-2412664.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12120,"status":"revised","reservation_date":"2024-08-11 08:31:10","uploaded":"2024-11-08 13:37:06","revisionof":"","revisedto":"S2-2412664","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1520.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411951.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.5.Y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411952","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"[NTT DOCOMO, CATT, Samsung, China Telecom, Nokia], vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality. S2-2411950 discuss the issue related to early media handling, and proposes to sustain using ground-AGW for early media based on operator policy. Delete the flowling EN: 1. Editor's note: Whether and how P-CSCF determines activation of optimized media routing based on satellite identifiers is FFS. The P-CSCF can determine whether to activate the UE-SAT-UE communication based on the satellite identifiers of UEs and the satellite association information, e.g., the two UEs are under the same satellite or with interconnected satellites (through ISL). 2. Editor's note: How the SDP re-negotiation is performed to provide media continuity when IMS-AGW changes is FFS The procedure in clause AX.5.1 has already provide a procedure about how to do the SDP re-negotiation when IMS-AGW changes. The interruption during the AGW reallocation cannot be avoided, such as the AGW changed from the satellite to the ground when one of the UEs changes satellite and the UE-SAT-UE communication cannot be continued. So, this is not a problem and the EN can be deleted.","secretary_remarks":"Revision of (agreed) S2-2410986 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12000,"status":"not treated","reservation_date":"2024-08-11 08:31:11","uploaded":"2024-11-08 13:37:06","revisionof":"S2-2410986","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411952.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX (new), AX.1 (new), AX.2 (new), AX.2.1 (new), AX.2.2 (new), AX.2.2.1 (new), AX.3 (new), AX.3.1 (new), AX.3.2 (new), AX.4 (new), AX.4.1 (new), AX.4.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411987","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revised in parallel session to S2-2412445.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12200,"status":"revised","reservation_date":"2024-08-11 09:58:28","uploaded":"2024-11-08 10:28:09","revisionof":"","revisedto":"S2-2412445","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1521.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411987.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2 (new), A.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411988","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revised in parallel session to S2-2412446.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12240,"status":"revised","reservation_date":"2024-08-11 09:58:29","uploaded":"2024-11-08 10:28:09","revisionof":"","revisedto":"S2-2412446","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1522.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411988.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411989","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing under a single satellite","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing when both UEs are and will be served under a single satellite.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12280,"status":"not treated","reservation_date":"2024-08-11 09:58:30","uploaded":"2024-11-08 10:28:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1523.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411989.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411990","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"NTT DOCOMO, [CATT, Samsung, China Telecom,] Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Revision of (agreed) S2-2410986. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11990,"status":"noted","reservation_date":"2024-08-11 09:58:31","uploaded":"2024-11-08 10:28:09","revisionof":"S2-2410986","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2411990.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX (new), AX.1 (new), AX.2 (new), AX.2.1 (new), AX.2.2 (new), AX.2.2.1 (new), AX.2.2.2 (new), AX.3 (new), AX.3.1 (new), AX.3.2 (new), AX.3.3 (new), AX.4 (new), AX.4.1 (new), AX.4.2 (new), AX.4.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412007","title":"[DRAFT] LS on reply to LS on OAM requirements to support regenerative payload","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to the incoming LS from RAN3 about OAM support of regenerative payload.","secretary_remarks":"Response to S2-2411306. Revised in parallel session to S2-2412646.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11290,"status":"revised","reservation_date":"2024-08-11 10:39:43","uploaded":"2024-11-08 16:05:33","revisionof":"","revisedto":"S2-2412646","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412007.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412008","title":"Discussion on the use of S&F Monitoring List.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Discussion","abstract":"S&F Monitoring List uses in different scenarios.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11520,"status":"not treated","reservation_date":"2024-08-11 10:39:43","uploaded":"2024-11-08 16:05:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412008.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412009","title":"Introduction of Store and Forward feature in EPC","source":"Huawei, HiSilicon [Nokia, Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo],","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2410989 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11620,"status":"not treated","reservation_date":"2024-08-11 10:39:43","uploaded":"2024-11-08 16:05:33","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":19.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412009.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412010","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of (postponed) S2-2410927. Revised in parallel session to S2-2412640.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11670,"status":"revised","reservation_date":"2024-08-11 10:39:44","uploaded":"2024-11-08 16:05:33","revisionof":"S2-2410927","revisedto":"S2-2412640","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412010.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.7.1, 5.11.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412011","title":"Discussion on UPF onboard for UE-Satellite-UE communication.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Discussion","abstract":"The UPF onboard solution should maximize reuse of principles of UPF&IMS-AGW onboard solution, including how P-CSCF triggers the optimization of media routing during call setup and how the procedure performs at change of satellite.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12440,"status":"not treated","reservation_date":"2024-08-11 10:39:44","uploaded":"2024-11-08 16:05:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412011.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412012","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, [NTT DOCOMO,] China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of (agreed) S2-2410987. Revised in parallel session to S2-2412448.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12050,"status":"revised","reservation_date":"2024-08-11 10:39:44","uploaded":"2024-11-08 16:05:33","revisionof":"S2-2410987","revisedto":"S2-2412448","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412012.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.5 (new), AX.5.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412013","title":"IMS-AGW relocation for UE-Sat-UE communication at change of satellite","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an IMS-AGW relocation procedure for UE-Sat-UE communication.","secretary_remarks":"Revision of (unhandled) S2-2410384 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12160,"status":"not treated","reservation_date":"2024-08-11 10:39:45","uploaded":"2024-11-08 16:05:33","revisionof":"S2-2410384","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1493.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412013.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.5.2 (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412032","title":"Discussion paper attach procedure with default PDN connection.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"discussion","for":"Agreement","abstract":"Discusses and propose a way forward for attach procedure with default PDN connection and combined EPS\/IMSI attach for SMS only attach.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11650,"status":"noted","reservation_date":"2024-08-11 11:00:07","uploaded":"2024-11-08 17:37:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412032.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412040","title":"Attach procedure with default PDN connection","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Defining a procedure to support PDN connection activation procedure during the attach procedure as discussed and captured in S2-2412032. (See changes in step 5 with Cyan color).","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11660,"status":"not treated","reservation_date":"2024-08-11 11:16:48","uploaded":"2024-11-08 17:37:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3840.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412040.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412044","title":"[DRAFT] Reply LS on UE-Satellite-UE Communication Architectures","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on KI#3 UE-Satellite-UE Communication Architectures\" (s3i240752\/S2-2411348)","secretary_remarks":"Response to S2-2411348. Revised in parallel session to S2-2412447.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11960,"status":"revised","reservation_date":"2024-08-11 11:20:14","uploaded":"2024-11-08 13:51:21","revisionof":"","revisedto":"S2-2412447","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG1, CT WG3, CT WG4","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412044.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412045","title":"Combined EPS\/IMSI attach proceude in S&F operation mode","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Provide a mechanism to support combined EPS\/IMSI attach procedure is missing.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11910,"status":"not treated","reservation_date":"2024-08-11 11:21:39","uploaded":"2024-11-08 17:37:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.272","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":977.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412045.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":" 5.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412052","title":"Handling of SM procedure in MME when MME configured with SMS in MME.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Agreement","abstract":"Summary of change: Mention that when S&F operation mode is supported in the MME and the MME shouldn't report failure report to SMS GMSC\/SMS router when a SM message is not delived when the feeder link is not available. When the MME sends failure message is left to the MME implementation.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11920,"status":"not treated","reservation_date":"2024-08-11 11:25:21","uploaded":"2024-11-08 17:37:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.272","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":978.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412052.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412055","title":"Handling of data transmission during NTN to TN mobility.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"discussion","for":"Discussion","abstract":"Discusses handling of data transmission during mobility procedure from S&F NTN cell to TN cell.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11930,"status":"not treated","reservation_date":"2024-08-11 11:29:41","uploaded":"2024-11-08 17:37:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412055.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412057","title":"Introduction of S&F storage quota in the split MME architecture.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. \/\/*************************************New Change *********************************\/ 2. It is proposed to implement S&F storage quota per UE in proposed split MME architecture. \/\/************************************New change ends*********\/","secretary_remarks":"Revision of (unhandled) S2-2410556 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11820,"status":"not treated","reservation_date":"2024-08-11 11:31:29","uploaded":"2024-11-08 17:37:53","revisionof":"S2-2410556","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3829.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412057.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.0(new), Y.1(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412076","title":"Updates to call flows for S&F feature","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (unhandled) S2-2410473 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11760,"status":"not treated","reservation_date":"2024-08-11 11:56:04","uploaded":"2024-11-08 12:27:16","revisionof":"S2-2410473","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3826.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412076.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.3.8.3, 5.7.1, 5.11.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412101","title":"23.502 Support for Regenerative based satellite access","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update AN release, N2 procedures and Handover procedures to support regenerative based satellite access.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11430,"status":"not treated","reservation_date":"2024-08-11 13:05:31","uploaded":"2024-11-08 13:18:40","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5179.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412101.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412102","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google], CATT, [Novamint, NEC, Tencent, Vivo],","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2410989. WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11630,"status":"not treated","reservation_date":"2024-08-11 13:05:32","uploaded":"2024-11-08 13:18:40","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":20.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412102.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412103","title":"Procedures for Store and Forward Satellite Operations","source":"[Huawei, HiSilicon], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of (postponed) S2-2410927 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11750,"status":"not treated","reservation_date":"2024-08-11 13:05:33","uploaded":"2024-11-08 13:18:40","revisionof":"S2-2410927","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412103.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2, 5.7.1, 5.11.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412104","title":"[DRAFT] Reply LS on UE-Satellite-UE Communication Architectures","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply LS on UE-Satellite-UE Communication Architectures","secretary_remarks":"Response to S2-2411348. Merged into S2-2403103","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11950,"status":"merged","reservation_date":"2024-08-11 13:05:34","uploaded":"2024-11-08 13:18:40","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG1, CT WG3, CT WG4","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412104.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412119","title":"DP on the List of Satellite IDs and S&F Monitored List .","source":"Sateliot, Samsung, Thales, Novamint","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"discussion","for":"Agreement","abstract":"This paper discusses on the concepts and intentions of the List of Satellite IDs and S&F Monitored List as per conclusions in TR 23.700-29, proposes an option consisting of specifying two separate lists and concludes with a proposal of the options that could be acceptable.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11530,"status":"not treated","reservation_date":"2024-08-11 13:27:12","uploaded":"2024-11-08 17:01:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412119.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412157","title":"Support Regenerative based satellite access","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adds N2 Removal Procedure","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11440,"status":"not treated","reservation_date":"2024-08-11 14:28:44","uploaded":"2024-11-08 14:32:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5182.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412157.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2.7.x(new), 4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412199","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"[NTT DOCOMO, CATT, Samsung, China Telecom, Nokia], CSCN","contact":"Yuanxing Xue","contact-id":103565,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Confirm CR Revision - CR states 1! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12040,"status":"not treated","reservation_date":"2024-08-11 15:37:03","uploaded":"2024-11-08 15:39:11","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1527.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412199.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412223","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"[NTT DOCOMO, CATT, Samsung, China Telecom, Nokia], CSCN","contact":"Yuanxing Xue","contact-id":103565,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality. List of functionalities is enhanced to include IMS AS. AX.2.2.2 is added. It is proposed to consider the UE subscription aspect.","secretary_remarks":"Revision of (agreed) S2-2410986. WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12010,"status":"not treated","reservation_date":"2024-08-11 16:15:26","uploaded":"2024-11-08 16:39:52","revisionof":"S2-2410986","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1428.0,"crrevision":12.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412223.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412238","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"China Telecommunications","contact":"Heng Nie","contact-id":40431,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2411313 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11480,"status":"not treated","reservation_date":"2024-08-11 16:31:46","uploaded":"2024-11-08 18:08:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG3, CT WG4, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412238.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412239","title":"Procedures of PDN connection for S&F Satellite Operations","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add S&F operation indication in PDN connection creation and update Add T3-RESPONSE timer provision","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11770,"status":"not treated","reservation_date":"2024-08-11 16:31:46","uploaded":"2024-11-08 18:08:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3843.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412239.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.3.1, 5.3.3.2, 5.10.2 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412240","title":"Support of Satellite change in IMS - Functionality","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of satellite change for UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12030,"status":"not treated","reservation_date":"2024-08-11 16:31:47","uploaded":"2024-11-08 18:04:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1528.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412240.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX3.x (new), AX.4.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412241","title":"IMS-AGW relocation for UE-Sat-UE communication at change of satellite","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an IMS-AGW relocation procedure for UE-Sat-UE communication.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12180,"status":"not treated","reservation_date":"2024-08-11 16:31:48","uploaded":"2024-11-08 18:04:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1529.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412241.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.5.x (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412242","title":"Support of Satellite change for UE-Satellite-UE communication","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Add a new clause to describe the support of Satellite change for UE-Satellite-UE communication.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12330,"status":"not treated","reservation_date":"2024-08-11 16:31:49","uploaded":"2024-11-08 18:04:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5869.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412242.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.X.3(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412243","title":"Procedures to support UE-Satellite-UE communication","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add Satellite ID in PDU Session establishment, update and handover procedures. Add Satellite ID in 4.3.6 of Application Function influence on traffic routing procedures.","secretary_remarks":"Merged into S2-2412452","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12350,"status":"merged","reservation_date":"2024-08-11 16:31:49","uploaded":"2024-11-08 18:04:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5186.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412243.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.2.2.1, 4.3.3.2, 4.3.6.3, 4.9.1.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412244","title":"TS23.503 Procedures to support UE-Satellite-UE communication","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add Satellite ID in Session policy procedures.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12430,"status":"not treated","reservation_date":"2024-08-11 16:31:50","uploaded":"2024-11-08 18:04:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1449.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412244.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412266","title":"Support of Store and Forward Satellite Operation","source":"[Qualcomm Incorporated, Huawei], China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of (agreed) S2-2410991 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11840,"status":"not treated","reservation_date":"2024-08-11 16:37:16","uploaded":"2024-11-08 18:08:13","revisionof":"S2-2410991","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3815.0,"crrevision":12.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412266.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412267","title":"Introduction to Split MME architecture","source":"[Samsung, Sateliot, NEC, Intel , Xiaomi, TNO, SHARP, Nokia], China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (agreed) S2-2410990 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11810,"status":"not treated","reservation_date":"2024-08-11 16:43:59","uploaded":"2024-11-08 18:08:13","revisionof":"S2-2410990","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":12.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412267.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.1(new), Y.2(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412294","title":"[DRAFT] Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2411313 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11500,"status":"not treated","reservation_date":"2024-08-11 17:36:51","uploaded":"2024-11-08 17:39:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"RAN WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412294.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412296","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Sateliot, Qualcomm, LGE,] Intel, [OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Revision 21 changes (compared to S2-2410989): Added clarifications on the timestamp handling at the HSS that were discussed during the SA WG2#165 meeting.","secretary_remarks":"Revision of (postponed) S2-2410989. WI Code should be 5GSAT_Ph3-ARC on CR Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11640,"status":"not treated","reservation_date":"2024-08-11 18:07:26","uploaded":"2024-11-08 20:33:40","revisionof":"S2-2410989","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":21.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412296.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412305","title":"[DRAFT] Reply LS on OAM requirements to support regenerative payload","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply LS on OAM requirements to support regenerative payload","secretary_remarks":"Response to S2-2411306 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11350,"status":"not treated","reservation_date":"2024-08-11 19:08:54","uploaded":"2024-11-08 19:22:05","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3","Cc":"SA WG5","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412305.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412306","title":"Supported TAI information is provided to AMF from OAM","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: For NG-RAN supporting regenerative payload, OAM will indicate supported TAIs information to AMF instead of NG-RAN.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11360,"status":"not treated","reservation_date":"2024-08-11 19:12:43","uploaded":"2024-11-08 19:22:05","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5878.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412306.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.7","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412314","title":"UE Detach for S&F Mode Access .","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"discussion","for":"Discussion","abstract":"Discusses support of a UE Detach following UE access to a satellite in S&F mode","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11540,"status":"not treated","reservation_date":"2024-08-11 19:48:51","uploaded":"2024-11-08 19:53:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412314.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412317","title":"UE determination for S&F mode operation or power saving","source":"Google","contact":"Ellen C. Liao","contact-id":107199,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR introduces the following aspects: Enhancement for the UE to determine whether to trigger power saving mechanism when the network in S&F operation mode. Enhancement for the Coverage Availability Information","secretary_remarks":"Revision of (unhandled) S2-2410595 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11900,"status":"not treated","reservation_date":"2024-08-11 19:57:21","uploaded":"2024-11-08 21:06:34","revisionof":"S2-2410595","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3831.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412317.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412326","title":"Support of UE-SAT-UE communication over satellite constellation","source":"Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The satellite constellation information e.g. which may include the satellite identities with the available time, and the link order of the satellites may be taken into account by the SMF during I-UPF selection.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12340,"status":"noted","reservation_date":"2024-08-11 20:23:14","uploaded":"2024-11-08 20:30:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5880.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412326.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412355","title":"UE-Satellite-UE communication with satellite changing","source":"China Mobile","contact":"Yi Jiang","contact-id":40863,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: add new clause of UE-sat-UE communication with the procedure supporting IMS-AGW relocation when satellite changes.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12170,"status":"not treated","reservation_date":"2024-08-11 23:53:56","uploaded":"2024-11-08 23:55:24","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1530.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412355.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412363","title":"LS from SA WG3: Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG3","contact":"Wei Zhou","contact-id":98493,"tdoctype":"LS in","for":"Action","abstract":"SA WG2 thanks SA WG3 for the LS on FS_5GSAT_Ph3_ARCH conclusions (S3 243533). SA WG3 would like to provide SA WG2 with the following information related to split-MME architecture: - SA WG3 has concluded that the last NAS security context of the UE is available at the MME on-board which processes the NAS security. Therefore, NAS ciphering\/deciphering and integrity protection functions can be handled in the MME-onboard when service link is available. - SA WG3 has concluded that S&F operation involving multiple satellites of the same PLMN will be supported. In the above context involving multiple satellites, SA WG3 has also concluded that how the NAS security context of the UE is transferred between MME-onboard of different satellites is out of scope of 3GPP. Action: SA WG3 kindly asks SA WG2 to take the above information into account.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11460,"status":"noted","reservation_date":"2024-11-17 14:17:36","uploaded":"2024-11-17 14:18:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"S3-245340","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412363.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412445","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2411987. Revised in parallel session to S2-2412449.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12210,"status":"revised","reservation_date":"2024-11-20 20:07:35","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2411987","revisedto":"S2-2412449","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1521.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412445.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2 (new), A.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412446","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2411988. Revised in parallel session to S2-2412450.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12250,"status":"revised","reservation_date":"2024-11-20 20:07:36","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2411988","revisedto":"S2-2412450","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1522.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412446.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412447","title":"[DRAFT] Reply LS on UE-Satellite-UE Communication Architectures","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on KI#3 UE-Satellite-UE Communication Architectures\" (s3i240752\/S2-2411348)","secretary_remarks":"Revision of S2-2412044. Revised in parallel session to S2-2412670.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11970,"status":"revised","reservation_date":"2024-11-20 20:07:37","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2412044","revisedto":"S2-2412670","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG1, CT WG3, CT WG4","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412447.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412448","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, [NTT DOCOMO,] China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2412012. Revised in parallel session to S2-2412671.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12060,"status":"revised","reservation_date":"2024-11-20 20:07:37","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2412012","revisedto":"S2-2412671","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412448.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.5 (new), AX.5.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412449","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2412445. Revised in parallel session to S2-2412672.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12220,"status":"revised","reservation_date":"2024-11-20 20:07:38","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2412445","revisedto":"S2-2412672","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1521.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412449.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2 (new), A.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412450","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2412446. Revised in parallel session to S2-2412673.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12260,"status":"revised","reservation_date":"2024-11-20 20:07:38","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2412446","revisedto":"S2-2412673","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1522.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412450.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex A.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412451","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, [Thales, CATT, NTT DOCOMO]","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes, basically: SMF needs to know the type of HO based on source and target satellite ID For N2-HO, UE-SAT-UE should be terminated. For Xn-HO, UL CL\/L-PSA is kept in source satellite until P-CSCF informs a DNAI.","secretary_remarks":"Revision of S2-2411882. Revised in parallel session to S2-2412674.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12300,"status":"revised","reservation_date":"2024-11-20 20:07:39","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2411882","revisedto":"S2-2412674","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5518.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412451.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.x.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412452","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, China Telecom","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Satellite identity is sent to PCF from SMF in the SM Policy Association messages.","secretary_remarks":"Revision of S2-2411457, merging S2-2412243 and S2-2411456. Revised in parallel session to S2-2412675.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12380,"status":"revised","reservation_date":"2024-11-20 20:07:40","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2411457","revisedto":"S2-2412675","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5129.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412452.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412453","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of S2-2411458. Revised in parallel session to S2-2412676.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12410,"status":"revised","reservation_date":"2024-11-20 20:07:41","uploaded":"2024-11-25 06:41:11","revisionof":"S2-2411458","revisedto":"S2-2412676","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1429.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412453.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412639","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, [Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Rev 18: the S&F monitoring list is optional during both NAS rejection and acceptance. Added UE behaviour wrt S&F monitoring list.","secretary_remarks":"Revision of S2-2411844. Revised in parallel session to S2-2412666.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11560,"status":"revised","reservation_date":"2024-11-20 20:10:09","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2411844","revisedto":"S2-2412666","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":22.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412639.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412640","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2412010. Revised in parallel session to S2-2412667.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11680,"status":"revised","reservation_date":"2024-11-20 20:10:09","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412010","revisedto":"S2-2412667","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412640.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412641","title":"Introduction to Split MME architecture","source":"Samsung, Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO, SHARP, Nokia","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. Changes(highlighted in yellow) over agreed revision of SA WG2#165: a) Added linkage in other comments section for this reference used in the CR TS 23.682 [74] clause 5.6.1.X and 5.6.3.X) b) Editorial corrections in bullet 4. c) Clarified in bullet 2 that UE context can be stored on subset of MME-onboard(s) and it is not mandatory to store on all the MME-onboard(s) connected to MME-ground..","secretary_remarks":"Revision of S2-2411856. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11790,"status":"agreed","reservation_date":"2024-11-20 20:10:09","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2411856","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":13.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412641.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412642","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC, CATT, LG Electronics","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. This revision over agreed version in SA WG2#165 proposes to resolve this EN: Editor's note: Whether feeder link availability period will be provided to SCS\/AS is FFS. There are two choices: a) Introduce this feeder link availability period parameter (as proposed in this CR - highlighted with yellow); or b) Remove the EN with a conclusion that this parameter is not required. After the discussion, this CR can be updated in one of the above directions. As a compromise for companies who are not interested in feeder link availability period parameter, this parameter can be kept optional. This implies: a) If this parameter is included, AF can accurately know when to send the data and delay in sending data b) If this parameter is not included then AF will have to estimate that data will be delivered to the UE with the max time of 'Estimated time to delivery' and this Estimated time to delivery network also considers the feeder link link availability time. For e.g.: Consider: a) Delivery time of data when feeder link available is 1 hour. b) Feeder link(FL) is available at 10 O clock and next FL availability time is after 6 hours. a) If feeder link availability information is provided(i.e. at 10) to the AF, then AF is aware based on when it has sent the data(e.g. at 9) UE will receive the data(e.g. by 11). b) If feeder link availability information is not provided. Then estimated delivery time value considering FL availability is 7 hours(1 hour to send data + 6 hours maximum time for FL to establish depeding on when data is sent to CN) AF will assume data will be delivered in 7 hours without accurately knowing when it can be delivered.","secretary_remarks":"Revision of S2-2411851. Revised in parallel session to S2-2412668.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11860,"status":"revised","reservation_date":"2024-11-20 20:10:09","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2411851","revisedto":"S2-2412668","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412642.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412646","title":"[DRAFT] LS on reply to LS on OAM requirements to support regenerative payload","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to the incoming LS from RAN3 about OAM support of regenerative payload.","secretary_remarks":"Revision of S2-2412007. Revised in parallel session to S2-2412669.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11300,"status":"revised","reservation_date":"2024-11-20 20:10:09","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412007","revisedto":"S2-2412669","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412646.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412664","title":"Call setup of UE-Satellite-UE communication with early media in IMS","source":"Vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS.","secretary_remarks":"Revision of S2-2411951. Revised in parallel session to S2-2412907.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12130,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2411951","revisedto":"S2-2412907","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1520.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412664.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412666","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, Samsung, SHARP [Sateliot, Qualcomm, LGE, Intel, OPPO, Google, CATT, Novamint, NEC, Tencent, Vivo]","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Rev 18: the S&F monitoring list is optional during both NAS rejection and acceptance. Added UE behaviour wrt S&F monitoring list.","secretary_remarks":"Revision of S2-2412639. Revised in parallel session to S2-2412903.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11570,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412639","revisedto":"S2-2412903","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":23.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412666.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412667","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2412640. Revised in parallel session to S2-2412906.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11690,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412640","revisedto":"S2-2412906","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412667.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412668","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC, CATT, LG Electronics","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. This revision over agreed version in SA WG2#165 proposes to resolve this EN: Editor's note: Whether feeder link availability period will be provided to SCS\/AS is FFS. There are two choices: a) Introduce this feeder link availability period parameter (as proposed in this CR - highlighted with yellow); or b) Remove the EN with a conclusion that this parameter is not required. After the discussion, this CR can be updated in one of the above directions. As a compromise for companies who are not interested in feeder link availability period parameter, this parameter can be kept optional. This implies: a) If this parameter is included, AF can accurately know when to send the data and delay in sending data b) If this parameter is not included then AF will have to estimate that data will be delivered to the UE with the max time of 'Estimated time to delivery' and this Estimated time to delivery network also considers the feeder link link availability time. For e.g.: Consider: a) Delivery time of data when feeder link available is 1 hour. b) Feeder link(FL) is available at 10 O clock and next FL availability time is after 6 hours. a) If feeder link availability information is provided(i.e. at 10) to the AF, then AF is aware based on when it has sent the data(e.g. at 9) UE will receive the data(e.g. by 11). b) If feeder link availability information is not provided. Then estimated delivery time value considering FL availability is 7 hours(1 hour to send data + 6 hours maximum time for FL to establish depeding on when data is sent to CN) AF will assume data will be delivered in 7 hours without accurately knowing when it can be delivered.","secretary_remarks":"Revision of S2-2412642. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11870,"status":"agreed","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412642","revisedto":"","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412668.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412669","title":"[DRAFT] LS on reply to LS on OAM requirements to support regenerative payload","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to the incoming LS from RAN3 about OAM support of regenerative payload.","secretary_remarks":"Revision of S2-2412646. Revised in parallel session to S2-2412902.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11310,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412646","revisedto":"S2-2412902","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412669.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412670","title":"Reply LS to SA WG3-LI: Reply LS on UE-Satellite-UE Communication Architectures","source":"SA WG2","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3-LI. CC: SA WG3, CT WG1, CT WG3, CT WG4","secretary_remarks":"Revision of S2-2412447. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11980,"status":"approved","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412447","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2411348","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG1, CT WG3, CT WG4","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412670.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412671","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, [NTT DOCOMO,] China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2412448. Revised in parallel session to S2-2412892.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12070,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412448","revisedto":"S2-2412892","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412671.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412672","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO [, Nokia]","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2412449. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12230,"status":"noted","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:12","revisionof":"S2-2412449","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1521.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412672.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412673","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO[, Nokia]","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2412450. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12270,"status":"noted","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:13","revisionof":"S2-2412450","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1522.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412673.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412674","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, [Thales, CATT, NTT DOCOMO]","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes, basically: SMF needs to know the type of HO based on source and target satellite ID For N2-HO, UE-SAT-UE should be terminated. For Xn-HO, UL CL\/L-PSA is kept in source satellite until P-CSCF informs a DNAI.","secretary_remarks":"Revision of S2-2412451. Revised in parallel session to S2-2412905.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12310,"status":"revised","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:13","revisionof":"S2-2412451","revisedto":"S2-2412905","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5518.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412674.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412675","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, China Telecom, Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Satellite identity is sent to PCF from SMF in the SM Policy Association messages.","secretary_remarks":"Revision of S2-2412452. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12390,"status":"noted","reservation_date":"2024-11-20 20:10:10","uploaded":"2024-11-25 06:41:13","revisionof":"S2-2412452","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5129.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412675.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412676","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of S2-2412453. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12420,"status":"noted","reservation_date":"2024-11-20 20:10:11","uploaded":"2024-11-25 06:51:07","revisionof":"S2-2412453","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1429.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412676.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412892","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, [NTT DOCOMO,] China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2412671. Revised in parallel session to S2-2412904.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12080,"status":"revised","reservation_date":"2024-11-25 06:26:28","uploaded":"2024-11-25 06:51:09","revisionof":"S2-2412671","revisedto":"S2-2412904","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412892.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412902","title":"[DRAFT] LS on reply to LS on OAM requirements to support regenerative payload","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to the incoming LS from RAN3 about OAM support of regenerative payload.","secretary_remarks":"Revision of S2-2412669. Revised in parallel session to S2-2412953.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11320,"status":"revised","reservation_date":"2024-11-25 06:26:34","uploaded":"2024-11-25 06:51:09","revisionof":"S2-2412669","revisedto":"S2-2412953","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412902.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412903","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, Samsung, SHARP, Sateliot, Qualcomm, LGE, Intel, OPPO, Google, CATT, Novamint, NEC, Tencent, Vivo, Xiaomi","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. Rev 18: the S&F monitoring list is optional during both NAS rejection and acceptance. Added UE behaviour wrt S&F monitoring list.","secretary_remarks":"Revision of S2-2412666. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11580,"status":"agreed","reservation_date":"2024-11-25 06:26:34","uploaded":"2024-11-25 06:51:09","revisionof":"S2-2412666","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":24.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412903.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412904","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, [NTT DOCOMO,] China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2412892. Agreed in parallel session. Noted","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12090,"status":"noted","reservation_date":"2024-11-25 06:26:36","uploaded":null,"revisionof":"S2-2412892","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412905","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"vivo, CSCN, Tencent, Honor, [Thales, CATT, NTT DOCOMO]","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes, basically: SMF needs to know the type of HO based on source and target satellite ID For N2-HO, UE-SAT-UE should be terminated. For Xn-HO, UL CL\/L-PSA is kept in source satellite until P-CSCF informs a DNAI.","secretary_remarks":"Revision of S2-2412674. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12320,"status":"noted","reservation_date":"2024-11-25 06:26:37","uploaded":null,"revisionof":"S2-2412674","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5518.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412906","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon, CATT, Samsung","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2412667. Agreed in parallel session. Revised to S2-2413021.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11700,"status":"revised","reservation_date":"2024-11-25 06:26:39","uploaded":"2024-11-25 06:51:09","revisionof":"S2-2412667","revisedto":"S2-2413021","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3824.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412906.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412907","title":"Call setup of UE-Satellite-UE communication with early media in IMS","source":"Vivo","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS.","secretary_remarks":"Revision of S2-2412664. Agreed in parallel session. Noted","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":12140,"status":"noted","reservation_date":"2024-11-25 06:26:40","uploaded":"2024-11-25 06:51:09","revisionof":"S2-2412664","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1520.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412907.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2412953","title":"[DRAFT] LS on reply to LS on OAM requirements to support regenerative payload","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to the incoming LS from RAN3 about OAM support of regenerative payload.","secretary_remarks":"Revision of S2-2412902. Revised to S2-2413030.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11330,"status":"revised","reservation_date":"2024-11-25 06:27:12","uploaded":"2024-11-25 06:51:10","revisionof":"S2-2412902","revisedto":"S2-2413030","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2412953.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2413021","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon, CATT, Samsung","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2412906. This CR was agreed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11710,"status":"agreed","reservation_date":"2024-11-25 06:27:36","uploaded":"2024-11-25 06:51:10","revisionof":"S2-2412906","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3824.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2413021.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2413030","title":"LS on reply to LS on OAM requirements to support regenerative payload","source":"SA WG2","contact":"Steven Wenham","contact-id":75794,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG3, SA WG5","secretary_remarks":"Revision of S2-2412953. This LS OUT was approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":11340,"status":"approved","reservation_date":"2024-11-25 06:27:39","uploaded":"2024-11-25 06:51:10","revisionof":"S2-2412953","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2411306","lsto":"RAN WG3, SA WG5","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166_Orlando_2024-11\/Docs\/S2-2413030.zip","group":"S2","meeting":"S2-166","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500019","title":"LS from SA WG3-LI: Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG3-LI","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"SA WG3-LI thanks SA WG2 for the reply LS on FS_5GSAT_Ph3_ARCH conclusions (S2-2411250) and SA WG3 for the original LS (S3 243533). SA WG3-LI provides feedback to some of the points raised by SA WG2 and SA WG3. {. . .} Action: SA WG3-LI kindly asks that SA WG2 takes the above into account and answer the following: 1. For split MME, will all events that occur when only the UE service link is available be sent to the MME-ground when the link to the ground based core network is re-established. a. If so, will the time each event occurred and the location of the UE at the time of the original event be available at the MME-ground. 2. For full EPC onboard, if the full CN is onboard each satellite, will any network elements other than the HSS synchronize context between satellites? 3. Does SA WG2 believe there are any additional issues SA WG3-LI should be aware of for S&F architectures or scenarios? 4. Is SA WG2 aware of any information that would help SA WG3-LI develop a solution that can meet the requirements listed above.","secretary_remarks":"Responses drafted in S2-2500506, S2-2500760, S2-2501033. FInal response in S2-2501085","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12480,"status":"replied to","reservation_date":"2024-12-06 13:48:12","uploaded":"2024-12-29 12:18:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG2, SA WG3","lsoriginalls":"S3i240703","lsreply":"S2-2501085","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500019.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500047","title":"LS from RAN WG2: LS on Satellite IDs for store-and-forward operation","source":"RAN WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 discussed how an IoT NTN UE capable of store-and-forward operation uses the MME-configured satellite ID list in the access stratum. RAN WG2 made the assumption that the UE configured with a satellite ID list by MME is not prevented to camp on a satellite operating in normal IoT NTN mode (i.e. with feeder-link connection), and perform subsequent access and data\/signalling communication with that satellite. RAN WG2 would like to request SA WG2 to provide feedback on whether the following RAN WG2 understanding can be confirmed: {. .}. Action: RAN WG2 respectfully asks SA WG2 to provide feedback on whether above RAN WG2 understanding can be confirmed and provide an answer to the Question above.","secretary_remarks":"Responses drafted in S2-2500138, S2-2500505, S2-2500538, S2-2500549, S2-2500634, S2-2500729, S2-2500781, S2-2500790, S2-2501035. CC#4: Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12750,"status":"postponed","reservation_date":"2024-12-06 13:48:12","uploaded":"2024-12-29 12:18:51","revisionof":"","revisedto":"S2-2501368","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"R2-2411197","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500047.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500062","title":"LS from SA WG3-LI: Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG3-LI","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"SA WG3-LI thanks SA WG2 for the reply LS on FS_5GSAT_Ph3_ARCH conclusions (S2-2411250) and SA WG3 for the original LS (S3 243533). SA WG3-LI provides feedback to some of the points raised by SA WG2 and SA WG3. SA WG3-LI would like to confirm that while it should be possible to meet the timeliness requirements for non-real time communications with the proposed S&F solutions, there are still potential issues for LI detailed in the responses below. {. . .}. Action: SA WG3-LI kindly asks that SA WG2 takes the above into account and answer the following: 1. For split MME, will all events that occur when only the UE service link is available be sent to the MME-ground when the link to the ground based core network is re-established. a. If so, will the time each event occurred and the location of the UE at the time of the original event be available at the MME-ground. 2. For full EPC onboard, if the full CN is onboard each satellite, will any network elements other than the HSS synchronize context between satellites? 3. Does SA WG2 believe there are any additional issues SA WG3-LI should be aware of for S&F architectures or scenarios? 4. Is SA WG2 aware of any information that would help SA WG3-LI develop a solution that can meet the requirements listed above.","secretary_remarks":"Response drafted in S2-2500760. Copy of S2-2500019. WITHDRAWN","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12470,"status":"withdrawn","reservation_date":"2024-12-29 10:58:22","uploaded":"2024-12-29 12:18:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG2","lsoriginalls":"S3i240703","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500062.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500136","title":"On the use of monitoring list and wait time for S&F.","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"discussion","for":"Approval","abstract":"Discusses the possible use of monitoring list and wait timer for S&F .","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12570,"status":"noted","reservation_date":"2025-01-08 15:44:04","uploaded":"2025-01-14 17:58:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500136.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500137","title":"Support for S&F Monitoring List and Wait Timer","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Completes the functionality for S&F Monitoring List and Wait Timer","secretary_remarks":"Confirm CR Number - CR states 3804! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12710,"status":"noted","reservation_date":"2025-01-08 15:47:41","uploaded":"2025-01-14 17:58:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3844.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500137.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500138","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Qualcomm","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on Satellite IDs for store-and-forward operation","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13240,"status":"not treated","reservation_date":"2025-01-08 15:51:47","uploaded":"2025-01-14 17:58:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"IoT_NTN_Ph3-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500138.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500179","title":"Update Introduction of Store and Forward feature in EPC","source":"China Mobile","contact":"Dan Wang","contact-id":87155,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update Introduction of Store and Forward feature in EPC to remove the EN about the S&F Monitoring List and The list of Satellite IDs","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12640,"status":"merged","reservation_date":"2025-01-09 15:39:44","uploaded":"2025-01-14 15:41:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3845.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500179.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500247","title":"AMF selection for regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the text in NOTE 1 under bullet 2) with the introduction sentence above","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13360,"status":"not treated","reservation_date":"2025-01-10 22:54:08","uploaded":"2025-01-14 21:40:18","revisionof":"","revisedto":"S2-2501610","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5908.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500247.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":false,"clauses_affected":"6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500248","title":"Split MME handling of UE attach with PDN connection","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding note in split MME architecture principles to explain how MME interacts with network on the ground to establish PDN connectivity is up to the MME implemenation.","secretary_remarks":"Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12860,"status":"postponed","reservation_date":"2025-01-10 22:54:08","uploaded":"2025-01-14 21:40:18","revisionof":"","revisedto":"S2-2501611","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3846.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500248.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500293","title":"Call setup of UE-Satellite-UE communication with early media in IMS","source":"Vivo, China Telecom","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS.","secretary_remarks":"Revision of S2-2412907. r01 agreed. Revised in e-mail session to S2-2501091.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13140,"status":"revised","reservation_date":"2025-01-12 02:34:30","uploaded":"2025-01-13 14:45:22","revisionof":"S2-2412907","revisedto":"S2-2501091","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1520.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500293.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500294","title":"Call setup of UE-Satellite-UE communication with early media with two AGWs allocated","source":"Vivo, China Telecom","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS that P-CSCF manages IMS AGW on ground and on satellite for a UE to optimize the IMS session update procedure after answering.","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13160,"status":"noted","reservation_date":"2025-01-12 02:34:31","uploaded":"2025-01-13 14:45:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1547.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500294.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500321","title":"Applicability of the S&F Wait Timer","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify S&F Wait Timer only applys to the PLMN which provisions the S&F Wait Timer and which operates in S&F Mode.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12790,"status":"merged","reservation_date":"2025-01-13 05:54:46","uploaded":"2025-01-14 06:22:54","revisionof":"","revisedto":"S2-2501778","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3847.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500321.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500322","title":"No Necessity to define UE in S&F mode","source":"MediaTek Inc.","contact":"YuanChieh (Carlson) Lin","contact-id":87343,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: remove the defintion regarding 'UE in S&F Mode'","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12800,"status":"noted","reservation_date":"2025-01-13 05:57:23","uploaded":"2025-01-14 06:22:54","revisionof":"","revisedto":"S2-2501780","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3848.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500322.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500403","title":"Terminology correction and clarification for Store and Forward Satellite Operation","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Align all the terminology for as the one defined in clause 3.1, which is 'Store and Forward Satellite operation' 2. Align the satellite link type to only 'feeder\/service' link, both in the Figure 4.13.9.1-1 and in the text referring","secretary_remarks":"r01 agreed. Revised in e-mail session to S2-2501086.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12900,"status":"revised","reservation_date":"2025-01-13 15:32:51","uploaded":"2025-01-14 21:40:18","revisionof":"","revisedto":"S2-2501086","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3849.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500403.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 4.13.9, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.3.4B.2, 5.3.4.B3, 5.7.1, 5.11.3, Annex O","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500446","title":"UE determination for S&F mode operation or power saving","source":"Google","contact":"Ellen C. Liao","contact-id":107199,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR introduces the following aspects: Enhancement for the UE to determine whether to trigger power saving mechanism when RAN and core network entities perform Store and Forward Satellite operation. Enhancement for the Coverage Availa","secretary_remarks":"Revision of S2-2412317. Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12780,"status":"noted","reservation_date":"2025-01-13 17:16:12","uploaded":"2025-01-14 17:08:22","revisionof":"S2-2412317","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3831.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500446.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.8.2, 4.13.8.3, 4.13.8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500505","title":"[DRAFT] Reply LS on Satellite IDs for store and foward operation","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: -. Attachments:.","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13250,"status":"not treated","reservation_date":"2025-01-14 03:58:01","uploaded":"2025-01-14 14:53:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500505.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500506","title":"[DRAFT] Reply LS to s3i240703","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3-LI. CC: RAN WG2, SA WG3. Attachments: none.","secretary_remarks":"Response to S2-2500019. Merged into S2-2501085","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12510,"status":"merged","reservation_date":"2025-01-14 03:58:01","uploaded":"2025-01-14 14:53:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"RAN WG2, RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500506.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500507","title":"Clarification on timestamp processing and editoral modification","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Timestamp related clarification Editorial modifications","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12960,"status":"noted","reservation_date":"2025-01-14 03:58:01","uploaded":"2025-01-14 14:53:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3850.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500507.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500508","title":"Procedure update for Store and Forward operations","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The alignment work to the attach procedure.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12980,"status":"noted","reservation_date":"2025-01-14 03:58:02","uploaded":"2025-01-14 14:53:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3851.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500508.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500525","title":"Support of S&F Monitoring List","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The introduction of the network provided an S&F monitoring list, and UE behaviour was specified.","secretary_remarks":"Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12610,"status":"merged","reservation_date":"2025-01-14 04:47:09","uploaded":"2025-01-14 13:25:57","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3852.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500525.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500538","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS for LS on Satellite IDs for store-and-forward operation (S2-2500047\/ R2-2411197)","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13260,"status":"not treated","reservation_date":"2025-01-14 05:25:21","uploaded":"2025-01-14 13:26:50","revisionof":"","revisedto":"S2-2501521","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"IoT_NTN_Ph3-Core"},{"winame":" 5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500538.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500548","title":"Resolving an EN about List of satelliteID(s) and S&F Monitoring List","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarified the handling of S&F Monitoring list. It is clarified that the satellites included in S&F Monitoring list supports S&F operation.","secretary_remarks":"Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12620,"status":"merged","reservation_date":"2025-01-14 05:57:35","uploaded":"2025-01-14 09:33:06","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3853.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500548.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500549","title":"[DRAFT] LS Reply on LS on Satellite IDs for store-and-forward operation","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: -. Attachments: TS 23.401 CR#3853 (S2-2500548).","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13270,"status":"not treated","reservation_date":"2025-01-14 05:59:16","uploaded":"2025-01-14 09:33:06","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500549.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500551","title":"Support of Attach with PDN connection for split MME architecture","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: support of Attach with PDN connection is handled based on implementation with example.","secretary_remarks":"Not handled at CC#4. Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12830,"status":"postponed","reservation_date":"2025-01-14 06:01:38","uploaded":"2025-01-14 09:33:06","revisionof":"","revisedto":"S2-2501783, S2-2501927, S2-2502038","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3854.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500551.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500559","title":"Transitioning between operation in S&F mode and normal mode","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: MME-onboard may trigger S1 release procedure with the existing cause 'load balancing TAU required' when transition between the S&F mode and normal mode.","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12810,"status":"noted","reservation_date":"2025-01-14 06:03:58","uploaded":"2025-01-14 09:33:06","revisionof":"","revisedto":"S2-2501784","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3855.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500559.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500618","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: NOTE for intra-NG-RAN node handover is extended to reflect the above conclusion in TS 23.700-29.","secretary_remarks":"Revision of S2-2411702 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13370,"status":"not treated","reservation_date":"2025-01-14 07:36:48","uploaded":"2025-01-14 11:08:10","revisionof":"S2-2411702","revisedto":"S2-2501986","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":4994.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500618.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500619","title":"Support of S&F Monitoring list and S&F Wait Timer","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The onboard MME may optionally provide UE a S&F Monitoring List when accepting or rejecting a NAS procedure. How UE use it is up to implementation. Add an note to clarify that the UE can ignore the S&F Wait Timer and attampt.","secretary_remarks":"Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12650,"status":"merged","reservation_date":"2025-01-14 07:40:00","uploaded":"2025-01-14 11:08:25","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3856.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500619.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500627","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"China Mobile, China Telecom, [NTT DOCOMO, Nokia]","contact":"Yi Jiang","contact-id":40863,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2412672. WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13070,"status":"noted","reservation_date":"2025-01-14 07:43:28","uploaded":"2025-01-14 14:26:45","revisionof":"S2-2412672","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500627.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500628","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"China Mobile, China Telecom [NTT DOCOMO, Nokia]","contact":"Yi Jiang","contact-id":40863,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2412673. WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13080,"status":"noted","reservation_date":"2025-01-14 07:43:30","uploaded":"2025-01-14 14:26:45","revisionof":"S2-2412673","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500628.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500634","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS of S2-2500047\/R2-2411197","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13280,"status":"not treated","reservation_date":"2025-01-14 07:44:20","uploaded":"2025-01-14 11:08:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500634.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500688","title":"S&F monitoring list","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Text is proposed to resolve the Editor's note.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12660,"status":"merged","reservation_date":"2025-01-14 08:53:39","uploaded":"2025-01-14 14:53:09","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3857.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500688.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500699","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, Thales, CATT, NTT DOCOMO, China Telecom","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes.","secretary_remarks":"Revision of S2-2412905. r04 agreed. Revised in e-mail session to S2-2501090.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13120,"status":"revised","reservation_date":"2025-01-14 09:14:12","uploaded":"2025-01-14 11:08:46","revisionof":"S2-2412905","revisedto":"S2-2501090","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500699.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500700","title":"Functional descriptions of UE-satellite-UE communications when satellite changes","source":"Vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 2 new clauses are added. mobility support of UE-SAT-UE communication when satellite changes AGW reallocation when satellite changes","secretary_remarks":"Revision of S2-2411888. Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13090,"status":"noted","reservation_date":"2025-01-14 09:14:21","uploaded":"2025-01-14 11:08:46","revisionof":"S2-2411888","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1476.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500700.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500715","title":"Discussion on whether IMS AS or P-CSCF initiates SIP re-INVITE.","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"discussion","for":"Discussion","abstract":"Discussion on whether IMS AS or P-CSCF initiates SIP re-INVITE. Impacts on handling of the SIP sequence number are discussed. It is proposed to take the IMS AS based approach as the way forward.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13350,"status":"not treated","reservation_date":"2025-01-14 09:33:47","uploaded":"2025-01-14 09:59:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500715.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500716","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2412672. r01 agreed. Revised in e-mail session to S2-2501088.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13030,"status":"revised","reservation_date":"2025-01-14 09:33:47","uploaded":"2025-01-14 09:59:55","revisionof":"S2-2412672","revisedto":"S2-2501088","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500716.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2 (new), AE.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500717","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2412673. r01 agreed. Revised in e-mail session to S2-2501089.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13050,"status":"revised","reservation_date":"2025-01-14 09:33:48","uploaded":"2025-01-14 09:59:55","revisionof":"S2-2412673","revisedto":"S2-2501089","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500717.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500718","title":"Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"r01 agreedrevised in e-mail session to S2-2501087.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13010,"status":"revised","reservation_date":"2025-01-14 09:33:48","uploaded":"2025-01-14 09:59:55","revisionof":"","revisedto":"S2-2501087","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1561.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500718.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.2.2.1, AE.2.2.2 (new), AE.3.3 (new), AE.4.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500719","title":"Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS","source":"NTT DOCOMO, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clean-up of functionality at call setup for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13170,"status":"agreed","reservation_date":"2025-01-14 09:33:50","uploaded":"2025-01-14 09:59:55","revisionof":"","revisedto":"S2-2501810, S2-2502140","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1562.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500719.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.3.2, AE.4.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500723","title":"S&F list handling for EN resolving","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Use one term neamed 'S&F monitoring list' for MO\/MT data\/signalling with the CN by UE It is optional for UE to access the satellite following the S&F monitoring list","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12630,"status":"merged","reservation_date":"2025-01-14 09:38:34","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3858.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500723.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500724","title":"UE and NW behaviour transition between SF and normal","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If the UE is under deregistered state with running S&F Wait Timer and S&F Monitoring List, when the UE detects it is under normal mode, how the UE handles the S&F Wait Timer and S&F Monitoring List is left for UE implementation. If the","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Proposed merged with S2-2501041 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12820,"status":"postponed","reservation_date":"2025-01-14 09:38:34","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3859.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500724.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500725","title":"PDN connection handling under S&F mode","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the PDN connection creation during the attach and UE requested PDN connectivity procedure.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12890,"status":"postponed","reservation_date":"2025-01-14 09:38:36","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3860.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500725.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500726","title":"Procedure updates for S&F","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! CC#4: r03 agreed. Revised in CC#4 to S2-2501340, merging S2-2500783","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12720,"status":"revised","reservation_date":"2025-01-14 09:38:37","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"S2-2501340","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500726.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500727","title":"Service request procedure update for S&F","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add necessery descriptions in the procedure of supporting S&F operation in service request.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12990,"status":"noted","reservation_date":"2025-01-14 09:38:37","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3862.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500727.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500728","title":"Some clarifications on S&F timer and S&F list usage","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add some clarifcations on UE behaviors for treaing the MME provided S&F wait timer and S&F monitoring list: How the UE treats the MME provided S&F wait timer or S&F monitoring list is up to UE implementation e.g. to help to determine wh","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12690,"status":"merged","reservation_date":"2025-01-14 09:38:38","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3863.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500728.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500729","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: -. Attachments: -.","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13290,"status":"not treated","reservation_date":"2025-01-14 09:38:39","uploaded":"2025-01-14 10:57:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500729.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500757","title":"Discussion on the enhanced discontinuous network coverage for satellite access under S&F mode.","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"discussion","for":"Agreement","abstract":"This paper analyses the impact of S&F Satellite Operation on the current procedures of enhanced discontinuous network coverage for satellite access, and proposes that in S&F mode, the UE and the MME may not perform procedures of enhanced discontinuous cov","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13330,"status":"not treated","reservation_date":"2025-01-14 10:18:32","uploaded":"2025-01-14 17:50:48","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500757.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500758","title":"Update on S&F Satellite Operation for UE and MME","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update on S&F operation for UE and MME to not perform procedures of enhanced discontinuous coverage based on S&F deployment configuration. 1. In S&F mode, the UE may not indicate 'Enhanced Discontinuous Coverage Support' to the network","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12920,"status":"noted","reservation_date":"2025-01-14 10:18:32","uploaded":"2025-01-14 17:36:59","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3864.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500758.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500759","title":"Update on procedures of PDN connection to support S&F Satellite Operation","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add S&F operation indication in PDN connection creation and update. Add Round-Trip Time provision either by MME or through local configuration in PGW.","secretary_remarks":"Revision of S2-2412239. WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13000,"status":"noted","reservation_date":"2025-01-14 10:18:33","uploaded":"2025-01-14 17:16:13","revisionof":"S2-2412239","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3843.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500759.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500760","title":"[DRAFT] Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"China Telecommunications","contact":"Heng Nie","contact-id":40431,"tdoctype":"LS out","for":"Approval","abstract":"Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2500019. r03 agreed. Revised in e-mail session to S2-2501085, merging S2-2500506 and S2-2501033","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12490,"status":"revised","reservation_date":"2025-01-14 10:18:34","uploaded":"2025-01-14 17:16:13","revisionof":"","revisedto":"S2-2501085","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3, CT WG3, CT WG4, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500760.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500761","title":"New features in Split MME architecture to support requirement of SA WG3_LI","source":"China Telecom","contact":"Heng Nie","contact-id":40431,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add new features in Split MME architecture","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12530,"status":"noted","reservation_date":"2025-01-14 10:18:34","uploaded":"2025-01-14 17:16:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3865.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500761.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, Annex O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500767","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"[NTT DOCOMO], vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Based on S2-2412672, a sentence of 'Subject to operator policy and implementation, the interactions between P-CSCF and IMS AS may be internal to P-CSCF having a B2BUA capability' is added as normative text, as there is no need to docume","secretary_remarks":"Revision of S2-2412672. Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13100,"status":"noted","reservation_date":"2025-01-14 10:19:28","uploaded":"2025-01-14 11:08:46","revisionof":"S2-2412672","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500767.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500768","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"[NTT DOCOMO], vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Based on S2-2412673, a sentence of 'Subject to operator policy and implementation, the interactions between P-CSCF and IMS AS may be internal to P-CSCF having a B2BUA capability' is added as normative text, as there is no need to docume","secretary_remarks":"Revision of S2-2412673. Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13110,"status":"noted","reservation_date":"2025-01-14 10:19:31","uploaded":"2025-01-14 11:08:46","revisionof":"S2-2412673","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500768.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500779","title":"Handling of List of Satellite IDs for S&F satellite operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the List of satellite IDs in General description clause and procedure related clauses.","secretary_remarks":"Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12670,"status":"merged","reservation_date":"2025-01-14 10:42:36","uploaded":"2025-01-14 11:04:07","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3866.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500779.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500780","title":"S&F Monitoring List and transition between S&F mode and normal mode","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Approval","abstract":"Discussion on S&F Monitoring Lists and S&F mode\/normal mode.","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12550,"status":"noted","reservation_date":"2025-01-14 10:45:03","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500780.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500781","title":"[DRAFT] Reply to LS on Satellite IDs for store-and-forward operation","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to RAN WG2 to confirm S&F list contents and those included support S&F operation.","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13300,"status":"not treated","reservation_date":"2025-01-14 10:45:03","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500781.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500782","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving. 2. When UE transits between S&F Mode and normal mode in different cell, the UE initiates initial Attach procedure to avoid failed","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! CC#4: r16 + changes agreed. Revised in e-mail session to S2-2501339, merging S2-2500179, S2-2500321, S2-2500525, S2-2500548, S2-2500619, S2-2500688, S2-2500723, S2-2500728, S2-2500779 and S2-2501028","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12590,"status":"revised","reservation_date":"2025-01-14 10:45:03","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"S2-2501339","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500782.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500783","title":"Procedure updates to support S&F Monitoring List","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the S&F Monitoring List parameters.","secretary_remarks":"Merged into S2-2501340","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12740,"status":"merged","reservation_date":"2025-01-14 10:45:04","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3868.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500783.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4B.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500784","title":"Information about ESM procedures in Split MME S&F Example","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A note is added to address the ESM procedures in general, which require interactions with core network nodes on the ground is upto implementation.","secretary_remarks":"Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12870,"status":"postponed","reservation_date":"2025-01-14 10:45:05","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3869.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500784.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500785","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Earl","secretary_remarks":"r04 agreedrevised in e-mail session to S2-2501092.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13180,"status":"revised","reservation_date":"2025-01-14 10:45:06","uploaded":"2025-01-14 13:33:22","revisionof":"","revisedto":"S2-2501092","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500785.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500790","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: RAN WG3. Attachments: S2-2500779.","secretary_remarks":"Response to S2-2500047. CC#4: Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12760,"status":"postponed","reservation_date":"2025-01-14 10:55:37","uploaded":"2025-01-14 11:04:07","revisionof":"","revisedto":"S2-2501729, S2-2501924","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"RAN WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500790.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500861","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, China Telecom, Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from S","secretary_remarks":"Revision of S2-2412675. Confirm CR Revision - CR states 32! Confirm Spec version used - CR states {19.21.0}! WI Code should be 5GSAT_Ph3-ARC! r02 agreed. Revised in e-mail session to S2-2501093.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13200,"status":"revised","reservation_date":"2025-01-14 13:27:59","uploaded":"2025-01-14 13:48:06","revisionof":"S2-2412675","revisedto":"S2-2501093","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500861.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500864","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, Samsung, China Telecom","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of S2-2412676. Confirm CR Revision - CR states 32! Confirm Spec version used - CR states {19.21.0}! WI Code should be 5GSAT_Ph3-ARC! r03 agreed. Revised in e-mail session to S2-2501094.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13220,"status":"revised","reservation_date":"2025-01-14 13:32:55","uploaded":"2025-01-14 13:49:15","revisionof":"S2-2412676","revisedto":"S2-2501094","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1429.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500864.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500942","title":"Discussion paper attach procedure with default PDN connection.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"discussion","for":"Discussion","abstract":"Discusses and propose a way forward for attach procedure with default PDN connection.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13320,"status":"not treated","reservation_date":"2025-01-14 14:57:13","uploaded":"2025-01-14 20:49:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500942.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500944","title":"Support of attach with PDN connection in S&F mode of operation-option 1","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Mention that when the UE has initiated attach with PDN connection establishment: The MME will reject the UE with cause and S&F wait time after authentication and security mode command procedure is completed successfully. When the feeder","secretary_remarks":"Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12840,"status":"postponed","reservation_date":"2025-01-14 15:00:35","uploaded":"2025-01-14 22:47:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3870.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500944.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500945","title":"Support of attach with PDN connection in S&F mode of operation-option 2","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Mention that when the UE has initiated attach with PDN connection establishment: When the feeder link is available after the MME-ground rejects the attach procedure with. The MME-onboard sync up with MME-ground. The MMME-ground establis","secretary_remarks":"Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12880,"status":"postponed","reservation_date":"2025-01-14 15:03:04","uploaded":"2025-01-14 22:47:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3871.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500945.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500947","title":"Correction to the S&F procedure","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Delete the following text from the sub clause.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12970,"status":"noted","reservation_date":"2025-01-14 15:06:19","uploaded":"2025-01-14 19:19:10","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3872.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500947.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500972","title":"Support for S&F Serving Satellite List and S&F Monitoring Satellite List","source":"Sateliot, Novamint, Thales","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Specification of a S&F Serving Satellite List, to support the purpose referred to as 'List of SatelliteID(s)' in TR 23.700-29. 2. Specification of a S&F Monitoring Satellite List, to support the purpose referred to as 'S&F Monitoring","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12580,"status":"noted","reservation_date":"2025-01-14 16:02:25","uploaded":"2025-01-14 16:31:28","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3874.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500972.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500979","title":"On the purpose and criticality of the List of Satellite IDs and S&F Monitored List and proposal to specify separate lists. .","source":"Sateliot, Thales, Novamint","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"discussion","for":"Discussion","abstract":"This paper discusses the purpose and criticality of the List of Satellite IDs and List of Satellite IDs and S&F Monitored List and makes a proposal for specification of two separate list, noting that the List of Satellite IDs is considered as critical to","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12540,"status":"noted","reservation_date":"2025-01-14 16:08:06","uploaded":"2025-01-14 16:24:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500979.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2500982","title":"Description of procedures for split-MME architecture in informative annex","source":"Sateliot, Novamint, Thales","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A new subclause is added to the information annex to describe the support of NAS procedures that needs to be executed over several satellite coverage windows. The subclause includes two illustrative flowcharts depicting two possible imp","secretary_remarks":"Proposed merged with S2-2500551 (postponed). Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12850,"status":"postponed","reservation_date":"2025-01-14 16:16:07","uploaded":"2025-01-14 16:20:54","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3875.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2500982.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501025","title":"Discussion on List of satelliteID(s).","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"discussion","for":"Discussion","abstract":"23.401 have below EN and there is an exception received on determining how to handle the List of satellite IDs: Editor's note: How to handle the specification of the 'List of satelliteID(s)' and 'S&F Monitoring List' as per conclusions in TR 23.700-29 [96","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12560,"status":"noted","reservation_date":"2025-01-14 17:53:34","uploaded":"2025-01-14 18:17:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501025.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501026","title":"Handling list of satellite IDs (Opt-1)","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Implement the List of satellite IDs feature.","secretary_remarks":"Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12700,"status":"noted","reservation_date":"2025-01-14 17:59:42","uploaded":"2025-01-14 18:17:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3876.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501026.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501028","title":"Handling list of satellite IDs (Opt-2)","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Implement the List of satellite IDs feature.","secretary_remarks":"Merged into S2-2501339","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12680,"status":"merged","reservation_date":"2025-01-14 18:04:49","uploaded":"2025-01-14 18:17:33","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3877.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501028.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.13.9","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501030","title":"Discussion on location determination for Full EPC onboard.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"discussion","for":"Discussion","abstract":"For Full EPC onboard the satellite it is not clear as to how the location verification is performed by ground network entities. This paper discusses a potential issue and proposes the way forward.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13340,"status":"not treated","reservation_date":"2025-01-14 18:23:23","uploaded":"2025-01-14 18:44:43","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501030.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501031","title":"Location determination for S&F","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarification on how the location is determined for the UE in S&F mode.","secretary_remarks":"Postponed in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12930,"status":"postponed","reservation_date":"2025-01-14 18:37:29","uploaded":"2025-01-14 18:44:43","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3878.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501031.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"O.2, O.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501033","title":"[DRAFT] Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Revision of S2-2412294. Response to S2-2500019. Merged into S2-2501085","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12520,"status":"merged","reservation_date":"2025-01-14 18:48:20","uploaded":"2025-01-14 18:56:06","revisionof":"S2-2412294","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"RAN WG2, SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501033.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501035","title":"[DRAFT] Reply LS on Satellite IDs for store-and-forward operation","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2. CC: -. Attachments:.","secretary_remarks":"Response to S2-2500047 Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13310,"status":"not treated","reservation_date":"2025-01-14 19:14:12","uploaded":"2025-01-14 19:16:11","revisionof":"","revisedto":"S2-2502123","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501035.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501038","title":"Clarifications related to S&F aspects","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Chage-1: Align text with correct wording. Chage-2: If the UE selects a cell which does not broadcast support of S&F, the UE shall stop S&F Wait Timer(if running) and ignore the S&F Monitoring List(if any stored in the UE).' Chage-3: Cla","secretary_remarks":"Not handled at CC#4. Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12940,"status":"postponed","reservation_date":"2025-01-14 20:11:21","uploaded":"2025-01-14 20:18:35","revisionof":"","revisedto":"S2-2502075","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3879.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501038.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.12.1, 4.13.9.1, 5.7.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501040","title":"UE Detach for S&F Mode Access","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for an onboard MME to send an indication of local detach to a UE in a NAS procedure.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Noted in e-mail session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12950,"status":"noted","reservation_date":"2025-01-14 21:28:49","uploaded":"2025-01-14 21:41:21","revisionof":"","revisedto":"S2-2502166","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3880.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501040.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501041","title":"Transition between S&F Mode and Normal Mode","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of UE and satellite requirements for transition between S&F mode and normal mode.","secretary_remarks":"WI Code should be 5GSAT_Ph3-ARC! Not handled at CC#4. Postponed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12770,"status":"postponed","reservation_date":"2025-01-14 21:33:59","uploaded":"2025-01-14 21:41:21","revisionof":"","revisedto":"S2-2501926, S2-2501991, S2-2502167","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3881.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501041.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501085","title":"Reply to Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG2","contact":"Heng Nie","contact-id":40431,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3-LI. CC: SA WG3, RAN WG2","secretary_remarks":"Revision of S2-2500760r03, merging S2-2500506 and S2-2501033. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12500,"status":"approved","reservation_date":"2025-01-25 09:53:42","uploaded":"2025-01-27 09:03:58","revisionof":"S2-2500760","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2500019","lsto":"SA WG3-LI","Cc":"SA WG3, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501085.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501086","title":"Terminology correction and clarification for Store and Forward Satellite Operation","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Align all the terminology for as the one defined in clause 3.1, which is 'Store and Forward Satellite operation' 2. Align the satellite link type to only 'feeder\/service' link, both in the Figure 4.13.9.1-1 and in the text referring to the figure. Correct the reference number for 36.300 to number [5]. 3. Adding reference to 36.300 for definition of NTN payload and NTN Gateway, and use satellite instead of satellite payload. 4. Spell out that eNB needs to be deployed on satellite to support Store and Forward. 5. Align the text in 5.11.3 with 4.13.9, the criteria to send the S&F capability indication is when 'if UE is enabled for Store and Forward ' 6. Fixed many occurances of wrong reference numbering for TS 36.300","secretary_remarks":"Revision of S2-2500403r01. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12910,"status":"agreed","reservation_date":"2025-01-25 09:53:42","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3849.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501086.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 4.13.9, 5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.3.4B.2, 5.3.4.B3, 5.11.3, Annex O","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501087","title":"Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS","source":"NTT DOCOMO, Nokia, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of mobility functionality for Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Revision of S2-2500718r01. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13020,"status":"agreed","reservation_date":"2025-01-25 09:53:43","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500718","revisedto":"S2-2501931","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1561.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501087.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.2.2.1, AE.2.2.2 (new), AE.3.3 (new), AE.4.3 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501088","title":"Mobility procedure for UE-Satellite-UE communication in IMS continuation of optimized media routing","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on continuation of optimized media routing.","secretary_remarks":"Revision of S2-2500716r01. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13040,"status":"agreed","reservation_date":"2025-01-25 09:53:44","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500716","revisedto":"S2-2501932","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1521.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501088.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2 (new), AE.5.2.1 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501089","title":"Mobility procedure for UE-Satellite-UE communication in IMS ground fallback","source":"NTT DOCOMO, Nokia, vivo, Huawei, HiSilicon, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Mobility procedure of UE-Satellite-UE communication in IMS focusing on ground fallback.","secretary_remarks":"Revision of S2-2500717r01. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13060,"status":"agreed","reservation_date":"2025-01-25 09:53:45","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500717","revisedto":"S2-2501933","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1522.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501089.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.2.2 (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501090","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, CSCN, Tencent, Honor, Thales, CATT, NTT DOCOMO, China Telecom","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes.","secretary_remarks":"Revision of S2-2500699r04. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13130,"status":"agreed","reservation_date":"2025-01-25 09:53:45","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500699","revisedto":"S2-2501929, S2-2501940, S2-2501963","release":"Rel-19","crspec":"23.501","crspecversion":"19.2.1","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5518.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501090.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501091","title":"Call setup of UE-Satellite-UE communication with early media in IMS","source":"Vivo, China Telecom","contact":"Zhenhua Xie","contact-id":83004,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of procedure for supporting UE-Satellite-UE communication with early media in IMS.","secretary_remarks":"Revision of S2-2500293r01. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13150,"status":"agreed","reservation_date":"2025-01-25 09:53:46","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500293","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1520.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501091.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501092","title":"Call setup update for UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Solve issues of the Editor's notes based on the convergent content in the S2-2412892 discussed in SA WG2-166 F2F meeting. - UE subscription is not considered in this release for UE-sat-UE. - The procedure has no impacts on H.248. - Early media traffic is discussed separately. - P-CSCF subscribes to Notification of User Plane Management Events for satellite change.","secretary_remarks":"Revision of S2-2500785r04. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13190,"status":"agreed","reservation_date":"2025-01-25 09:53:47","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500785","revisedto":"S2-2501934, S2-2501941","release":"Rel-19","crspec":"23.228","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1564.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501092.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AE.5, AE.5.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501093","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, China Telecom, Samsung","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Enhance Notification of User Plane Management Events by inclusion of UE's serving satellite identifier in the notification from SMF to AF via PCF.","secretary_remarks":"Revision of S2-2500861r02. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13210,"status":"agreed","reservation_date":"2025-01-25 09:53:49","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500861","revisedto":"S2-2501930, S2-2502100","release":"Rel-19","crspec":"23.502","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":5129.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501093.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501094","title":"Procedure update for UE-Satellite-UE communication","source":"NTT DOCOMO, Samsung, China Telecom","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE's serving Satellite identity is included in the Access Network Information report.","secretary_remarks":"Revision of S2-2500864r03. Approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":13230,"status":"agreed","reservation_date":"2025-01-25 09:53:50","uploaded":"2025-01-28 08:51:07","revisionof":"S2-2500864","revisedto":"S2-2502101","release":"Rel-19","crspec":"23.503","crspecversion":"19.2.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1429.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"SP-250040","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501094.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501339","title":"Support of S&F Monitoring List in S&F Mode","source":"Huawei, HiSilicon, Samsung","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce S&F Monitoring List to assist UE to have a sucessful network access and realize power saving.","secretary_remarks":"Revision of S2-2500782r16 + changes, merging S2-2500179, S2-2500321, S2-2500525, S2-2500548, S2-2500619, S2-2500688, S2-2500723, S2-2500728, S2-2500779 and S2-2501028. This CR was agreed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12600,"status":"agreed","reservation_date":"2025-01-25 09:56:36","uploaded":"2025-01-28 08:51:09","revisionof":"S2-2500782","revisedto":"S2-2501518, S2-2501613, S2-2501686, S2-2501726, S2-2501785, S2-2501813, S2-2501925, S2-2501961, S2-2501987, S2-2501989, S2-2502063","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3867.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501339.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.9.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2501340","title":"Procedure updates for S&F","source":"Vivo, Huawei, HiSilicon","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the updates to the S&F monitoring list in the procedures.","secretary_remarks":"Revision of S2-2500726r03, merging S2-2500783. This CR was agreed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3-ARC","tdoc_agenda_sort_order":12730,"status":"agreed","reservation_date":"2025-01-25 09:56:37","uploaded":"2025-01-28 08:51:09","revisionof":"S2-2500726","revisedto":"S2-2501740","release":"Rel-19","crspec":"23.401","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3861.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_166AH-e_Electronic_2025-01\/Docs\/S2-2501340.zip","group":"S2","meeting":"S2-166-Ad Hoc-e","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2. ","crsinpack":null,"crsinpacknumber":0}]