[{"name":"S2-2409605","title":"LS from SA WG3: LS on reply to LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG3","contact":"Rakshesh P. Bhatt","contact-id":96811,"tdoctype":"LS in","for":"Action","abstract":"SA WG3 thanks SA WG2 for the Liaison S2-2407350 and provides observations and feedback on the conclusions of FS_5GSAT_Ph3_ARCH for support of Store and Forward and UE-Satellite-UE communication captured in the TR 23.700-29 Clause 8.2 and 8.3 respectively. SA WG3 also seeks some clarifications as detailed below. {. . .} Action: SA WG3 kindly asks SA WG2 to take the above information into account in their further work and provide feedback.","secretary_remarks":"Responses drafted in S2-2409812, S2-2410084, S2-2410092, S2-2410144, S2-2410456. Final response in S2-2411250","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13920,"status":"replied to","reservation_date":"2024-09-23 09:35:14","uploaded":"2024-09-23 13:55:47","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG2, SA WG3-LI","lsoriginalls":"S3-243533","lsreply":"S2-2411250","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409605.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409747","title":"Support of UE-SAT-UE communication over satellite constellation","source":"Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The satellite constellation information e.g. which may include the satellite identities with the available time, and the link order of the satellites may be taken into account by the SMF during I-UPF selection.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14690,"status":"not treated","reservation_date":"2024-09-30 07:40:06","uploaded":"2024-10-04 10:56:21","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5649.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409747.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409748","title":"IMS-AGW relocation in UE-SAT-UE communication","source":"Samsung","contact":"DongYeon Kim","contact-id":87763,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: When the P-CSCF is notified about the serving satellite changes and how the IMS-AGW relocation procedure can be proceeded are introduced.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14560,"status":"not treated","reservation_date":"2024-09-30 07:40:07","uploaded":"2024-10-04 10:56:21","revisionof":"","revisedto":"S2-2412324","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1464.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409748.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"AC.X (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409809","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel,]? Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. In new revision: Add a new attach type of S&F Add new reason of no PGW and SGW onborad for NAS rejection due to not being completed Add a S&F retry deadline timer in the NAS reject message, it instructs UE having a vaild NAS re-try procedure which needs to retry before the expiry of the S&F retry deadline timer. Add a EN that SA WG2 needs to check with CT WG1 whether existing cause value can be reused. Add a EN to say: It is FFS whether the list of satellites (i.e. S&F Monitoring list) is enough for UE to find the corresponding satellite accurately, whether it needs to provide e.g,Ephemeris information, to UE, which needs to check with RAN.","secretary_remarks":"Revision of (postponed) S2-2409403. Confirm Sources! Confirm Spec version used - CR states 19.1.0! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14100,"status":"not treated","reservation_date":"2024-09-30 08:57:38","uploaded":"2024-10-03 09:49:04","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409809.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409810","title":"Procedures for S&F","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add enhancements for S&F based on conclusion including: Attach, TAU, control plan service request and UE requested PDN connectivity procedures.","secretary_remarks":"Confirm CR Number - CR states 3805! Confirm Spec version used - CR states 18.6.0! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14190,"status":"not treated","reservation_date":"2024-09-30 08:57:39","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3816.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409810.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409811","title":"[DRAFT] LS on reject cause value for not supporting S&F UEs","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"LS out","for":"Approval","abstract":"LS on reject cause value for not supporting S&F UEs","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14240,"status":"not treated","reservation_date":"2024-09-30 08:57:40","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409811.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409812","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2409605. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13970,"status":"not treated","reservation_date":"2024-09-30 08:57:40","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"SA WG3-LI, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409812.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409813","title":"Support of Regenerative Regenerative-based satellite access","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause for supporting regenerative satellite payload access including the following: N2 Removal procedure is mentiond for N2 connection management Add a EN about N2 suspend and resume AMF needs to report additional info reflecting regenerative payload to SMF and then to PCF gNB selects the AMF based on AMF supporting S1 Removal procedure functionallities","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14840,"status":"not treated","reservation_date":"2024-09-30 08:57:40","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5659.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409813.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.x (new), 6.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409814","title":"Support of Regenerative Regenerative-based satellite access","source":"Vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause for supporting regenerative satellite payload access including the following: S1 Removal procedure is mentiond for S1 connection management Add a EN about S1 suspend and resume MME needs to report additional info reflecting regenerative payload to PGW and then to PCRF eNB selects the MME based on MME supporting S1 Removal procedure functionallities","secretary_remarks":"Confirm Specification Number - CR states 23.501! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14900,"status":"not treated","reservation_date":"2024-09-30 08:57:41","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3817.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409814.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409815","title":"[DRAFT] LS on regenerative satellite payload","source":"vivo","contact":"Wen Wang","contact-id":75748,"tdoctype":"LS out","for":"Approval","abstract":"LS on regenerative satellite payload","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14780,"status":"noted","reservation_date":"2024-09-30 08:57:42","uploaded":"2024-10-03 09:49:04","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2, RAN WG3","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409815.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409841","title":"Support of regenerative-based satellite access","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update 'Support for integrating NR satellite access into 5GS' to support regenerative-based satellite access.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14850,"status":"not treated","reservation_date":"2024-09-30 14:27:15","uploaded":"2024-09-30 14:37:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5662.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409841.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.a(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409842","title":"Update procedures for Store and Forward operation","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Attach, TAU, Service Request procedures are updated to support S&F feature in EPC.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14200,"status":"not treated","reservation_date":"2024-09-30 14:27:15","uploaded":"2024-09-30 14:37:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3819.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409842.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4, 5.3.4.1,","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409843","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2409403. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14110,"status":"not treated","reservation_date":"2024-09-30 14:27:16","uploaded":"2024-09-30 14:37:55","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409843.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409844","title":"Introduction to Split MME architecture","source":"[Samsung, Novamint, Sateliot, NEC, Intel], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (Endorsed) S2-2409411. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14300,"status":"not treated","reservation_date":"2024-09-30 14:27:17","uploaded":"2024-09-30 14:37:55","revisionof":"S2-2409411","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3800.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409844.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.0(new), Y.1(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409845","title":"Support of UE-Satellite-UE communication","source":"[CATT, vivo, NTT DOCOMO, CSCN, Thales, China Telecom, Nokia, OPPO, SAMSUNG], CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Add UE-Satellite-UE communication definition. 2\/ Add a new clause to describe the feature. 3\/ add a new annex to illustrate the architecture of supporting UE-satellite-UE communication,","secretary_remarks":"Revision of (Endorsed) S2-2409407. Revised in parallel session to S2-2410625.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14650,"status":"revised","reservation_date":"2024-09-30 14:27:18","uploaded":"2024-09-30 14:37:55","revisionof":"S2-2409407","revisedto":"S2-2410625","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5583.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409845.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 5.4.x(new), Annex X(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409846","title":"Support of UE-Satellite-UE communication","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Satellite identity is sent to SMF from AMF in the PDU session establishment\/modification procedures. 2\/ Re-use AF traffic influence procedure for the insertion of UPF on-board the satellite and N6 tunnel setup between the UPF and the AF.","secretary_remarks":"No Clauses Affected indicated! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14730,"status":"not treated","reservation_date":"2024-09-30 14:27:19","uploaded":"2024-09-30 14:37:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5031.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409846.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410021","title":"Support for satellite access with regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for regenerative payload.","secretary_remarks":"Postponed in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14880,"status":"postponed","reservation_date":"2024-02-10 19:21:27","uploaded":"2024-10-04 21:55:10","revisionof":"","revisedto":"S2-2411654","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3820.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410021.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 4.13.1, 4.13.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410022","title":"Support for satellite access with regenerative payload","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for regenerative payload.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14860,"status":"not treated","reservation_date":"2024-02-10 19:21:28","uploaded":"2024-10-04 21:55:10","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5692.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410022.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.X (new), 5.7.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410074","title":"Procedures update to support S&F satellite operation","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update the Attach, TAU and Service Request procedures for the support of Store and forward satellite operation","secretary_remarks":"Revision of (unhandled) S2-2408418. Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14210,"status":"not treated","reservation_date":"2024-03-10 09:22:03","uploaded":"2024-10-04 06:38:09","revisionof":"S2-2408418","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3809.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410074.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410082","title":"[DRAFT] Reply LS on Support of Regenerative-based Satellite Access","source":"Qualcomm Technologies","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 would like to inform RAN WG3 that the conclusions for FS_5GSAT_Ph3 for 'KI#1: Support of Regenerative-based satellite access' in clause 8.1 of TR 23.700-29 apply to both E-UTRAN\/EPS and NG-RAN\/5GS and therefore the related RAN WG3 impacts are expec","secretary_remarks":"Response to S2-2407410 (noted at SA2#163). Revised in parallel session to S2-2410626.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14740,"status":"revised","reservation_date":"2024-03-10 09:35:53","uploaded":"2024-10-04 18:00:36","revisionof":"","revisedto":"S2-2410626","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"},{"winame":" 5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, RAN","Cc":"RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410082.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410084","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Qualcomm Technologies","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"Reply to LS of SA WG3 on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2409605. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13980,"status":"not treated","reservation_date":"2024-03-10 09:38:25","uploaded":"2024-10-04 18:00:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"SA WG3-LI","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410084.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410090","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo],OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. The new changes introduced in Revision 6 are as below: The MME operating in S&F mode may allocate long periodic TAU timer value to the UE. Reslove the EN about the timestamp information.","secretary_remarks":"Revision of (postponed) S2-2409403. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14080,"status":"not treated","reservation_date":"2024-03-10 10:18:23","uploaded":"2024-10-04 06:42:56","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410090.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410091","title":"Full EPC Onboard for Support of Store and Forward Satellite Operation","source":"[Qualcomm Incorporated], OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of (postponed) S2-2409412. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14370,"status":"not treated","reservation_date":"2024-03-10 10:18:26","uploaded":"2024-10-04 06:43:23","revisionof":"S2-2409412","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3815.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410091.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410092","title":"[DRAFT] Reply LS on FS_SAT_Ph3_RACH conclusions","source":"OPPO","contact":"Boren Guo","contact-id":100775,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS of S2-2409605\/ S3-243533","secretary_remarks":"Response to S2-2409605. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13990,"status":"not treated","reservation_date":"2024-03-10 10:18:27","uploaded":"2024-10-04 06:43:45","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"SA WG3-LI, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410092.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410124","title":"[DRAFT] LS on AGW reallocation of UE-Satellite-UE communications","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"LS out","for":"Approval","abstract":"Functional description and procedure of AGW reallocation","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14570,"status":"not treated","reservation_date":"2024-03-10 12:30:45","uploaded":"2024-10-04 17:12:54","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"SA WG3","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410124.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410125","title":"Functional descriptions of UE-satellite-UE communications","source":"Vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 3 new clauses are added. activation of UE-SAT-UE mobility support of UE-SAT-UE communication AGW reallocation","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14540,"status":"not treated","reservation_date":"2024-03-10 12:30:45","uploaded":"2024-10-04 17:12:54","revisionof":"","revisedto":"S2-2411883, S2-2411888","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1476.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410125.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"AY.3(new), AY.4(new), AY.5(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410126","title":"Procedures of UE-satellite-UE communications","source":"Vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 4 new clauses regarding procedures: A new clause to depict AGW reallocation procedures A new clause to depict how to reuse the AGW reallocation procedure in the activation of UE-SAT-UE communication A new clause to depict how to reuse the AGW reallocation procedure in satellite change with UE-SAT-UE continues A new clause to depict how to reuse AGW reallocation procedure in satellite change with UE-SAT-UE terminates","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14640,"status":"not treated","reservation_date":"2024-03-10 12:30:46","uploaded":"2024-10-04 17:12:54","revisionof":"","revisedto":"S2-2411884, S2-2411889","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1477.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410126.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"AY.6.1 (new), AY.6.2.1 (new), AY.6.2.2 (new), AY.6.3(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410127","title":"Discussion paper on mobility support","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"discussion","for":"Discussion","abstract":"Restrict scopes of mobility supports","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14710,"status":"not treated","reservation_date":"2024-03-10 12:30:47","uploaded":"2024-10-04 17:12:54","revisionof":"","revisedto":"S2-2411881","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410127.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410139","title":"Support of satellite access with regenerative payload","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support of regenerative based satellite access","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14910,"status":"not treated","reservation_date":"2024-03-10 13:57:59","uploaded":"2024-10-04 13:25:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3822.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410139.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 4.13.1, 4.13.x(new), 5.5.1.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410140","title":"Support of satellite access with regenerative payload","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support of regenerative based satellite access.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14870,"status":"not treated","reservation_date":"2024-03-10 13:58:00","uploaded":"2024-10-04 13:25:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5725.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410140.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.x(new), 5.7.4, 6.2.1, 6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410141","title":"[DRAFT] LS on E-UTRAN satellite access supporting regenerative payload","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"LS on E-UTRAN satellite access supporting regenerative payload","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14770,"status":"not treated","reservation_date":"2024-03-10 13:58:01","uploaded":"2024-10-04 13:25:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410141.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410142","title":"Introduction of Store and Forward feature in EPC","source":"Xiaomi, [Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo]","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2409403. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14090,"status":"not treated","reservation_date":"2024-03-10 13:58:01","uploaded":"2024-10-04 13:28:18","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410142.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410143","title":"Procedures for Store and Forward Satellite Operations","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14220,"status":"not treated","reservation_date":"2024-03-10 13:58:02","uploaded":"2024-10-04 13:28:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3823.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410143.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.7.1 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410144","title":"[DRAFT] Reply LS on SA WG3 relay to LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Xiaomi","contact":"Yuxin MAO","contact-id":91413,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on SA WG3 relay to LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2409605. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14000,"status":"not treated","reservation_date":"2024-03-10 13:58:04","uploaded":"2024-10-04 13:28:18","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"SA WG3-LI, RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410144.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410195","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon, China Telecom, ETRI","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings.","secretary_remarks":"Revision of (unhandled) S2-2408675. Revised in parallel session to S2-2410627.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14790,"status":"revised","reservation_date":"2024-03-10 16:06:16","uploaded":"2024-10-04 20:50:06","revisionof":"S2-2408675","revisedto":"S2-2410627","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410195.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.11.1, 5.4.11.2, 5.4.11.x (new), 5.7.4, 6.2.1, 6.3.5","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410196","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: NOTE for intra-NG-RAN node handover is extended to reflect the above conclusion in TS 23.700-29.","secretary_remarks":"Revision of (unhandled) S2-2408676. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14930,"status":"not treated","reservation_date":"2024-03-10 16:06:19","uploaded":"2024-10-04 20:54:08","revisionof":"S2-2408676","revisedto":"S2-2411702","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":4994.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410196.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410208","title":"On how to illustrate the quick Delivery report (RP-ACK).","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"discussion","for":"Agreement","abstract":"This paper concludes that there is no need to capture any SMS-IWMSC functionality in the split-MME figure.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14250,"status":"not treated","reservation_date":"2024-03-10 17:52:47","uploaded":"2024-10-04 18:44:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410208.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410234","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, [Novamint, NEC, Tencent, CATT, Intel, Vivo], Sateliot, Qualcomm, LGE","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2409403. Wrong WI Code on CR! Revised in parallel session to S2-2410657.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14040,"status":"revised","reservation_date":"2024-04-10 04:10:30","uploaded":"2024-10-04 12:21:37","revisionof":"S2-2409403","revisedto":"S2-2410657","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410234.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410242","title":"Discussion on the handling of request time in S&F .","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"discussion","for":"Discussion","abstract":"This contribution discusses topics related to the timestamp information in provisional location update.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14010,"status":"noted","reservation_date":"2024-04-10 04:14:01","uploaded":"2024-10-04 12:19:32","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410242.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410243","title":"Procedural changes for S&F support in EPC","source":"Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Attach, TAU, Service Request, Connection suspend and resume procedures are updated to support S&F feature in EPC.","secretary_remarks":"Revision of (unhandled) S2-2408077. No Clauses Affected indicated! Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14230,"status":"not treated","reservation_date":"2024-04-10 04:21:16","uploaded":"2024-10-04 12:18:20","revisionof":"S2-2408077","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3802.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410243.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410253","title":"Support of UE-Satellite-UE communication in IMS","source":"[NTT DOCOMO, CATT, Samsung, China Telecom], Nokia","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS.","secretary_remarks":"Revision of (postponed) S2-2409421. Wrong WI Code on CR! Merged into S2-2410622","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14550,"status":"merged","reservation_date":"2024-04-10 04:51:31","uploaded":"2024-10-04 12:03:21","revisionof":"S2-2409421","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":1428.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410253.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410308","title":"Support for Regenerative based satellite access","source":"ETRI","contact":"Yoohwa Kang","contact-id":63871,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: N2 and Handover procedures are updated to support regenerative based satellite access.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14940,"status":"not treated","reservation_date":"2024-04-10 06:35:38","uploaded":"2024-10-04 07:48:47","revisionof":"","revisedto":"S2-2411540","release":"Rel-19","crspec":"23.502","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5085.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410308.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.2.7.1, 4.9.1.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410313","title":"Architecture for UE-satellite-UE communicaitons","source":"Vivo, Thales, CATT, CSCN, Honor, Tencent, China Telecom, Samsung","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an architecture to describe the interfaces.","secretary_remarks":"Revision of (Endorsed) S2-2409408. Revised in parallel session to S2-2410622, merging S2-2410253","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14450,"status":"revised","reservation_date":"2024-04-10 06:58:30","uploaded":"2024-10-04 17:12:54","revisionof":"S2-2409408","revisedto":"S2-2410622","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1427.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410313.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.2.1.1(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410315","title":"Support of UE-satellite-UE communications when serving satellite changes","source":"Vivo, [Thales, CATT, CSCN, Honor, Tencent, NTT DOCOMO]","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a new clause to describe the feature of when UE's gNB onboarded serving satellite changes, basically: For Xn-HO, we document Method#2 For N2-HO, we assume there is no need to be informed with a notification from IMS. SMF needs to know the connectivity between gNB onboarded target satellite and UL CL\/L-PSA onboarded source satellite, if there is, it means it is Xn, it there is no, it means it is N2.","secretary_remarks":"Revision of (postponed) S2-2408851. Confirm Spec version used - CR states 19.0.0! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14720,"status":"not treated","reservation_date":"2024-04-10 07:10:16","uploaded":"2024-10-04 17:12:54","revisionof":"S2-2408851","revisedto":"S2-2411882","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5518.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410315.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410319","title":"Discussion on interaction between IMS subsystem and PCF for enabling UE-SAT-UE communication .","source":"NTT DOCOMO","contact":"Sushmit Bhattacharjee","contact-id":104795,"tdoctype":"discussion","for":"Approval","abstract":"Discussion on KI#3 about interaction between IMS subsystem and PCF for enabling UE-SAT-UE communication.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14480,"status":"noted","reservation_date":"2024-04-10 07:28:35","uploaded":"2024-10-04 07:36:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410319.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410348","title":"Introduction to Split MME architecture","source":"Samsung, Sateliot, NEC, China Telecom","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (Endorsed) S2-2409411. Revised in parallel session to S2-2410658.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14260,"status":"revised","reservation_date":"2024-04-10 07:56:01","uploaded":"2024-10-04 12:56:41","revisionof":"S2-2409411","revisedto":"S2-2410658","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410348.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.0(new), Y.1.1(new), Y.1.2(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410351","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of (Endorsed) S2-2409406. Revised in parallel session to S2-2410660.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14380,"status":"revised","reservation_date":"2024-04-10 08:01:03","uploaded":"2024-10-04 12:56:41","revisionof":"S2-2409406","revisedto":"S2-2410660","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410351.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"(new)5.6.1.X, (new)5.6.3.X","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410377","title":"Support of Regenerative-based satellite access","source":"Huawei, HiSilicon, OPPO","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to S1 connection management and note how CN functions can determine its use.","secretary_remarks":"Revision of (unhandled) S2-2408381. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14890,"status":"not treated","reservation_date":"2024-04-10 08:42:05","uploaded":"2024-10-04 12:38:36","revisionof":"S2-2408381","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3806.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410377.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"4.3.8.3, 4.4.2, 4.13.1, 4.13.2, 4.13.x (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410378","title":"QCI for regenerative satellite access description","source":"Huawei, HiSilicon, OPPO","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add note about different CN PDB for regenerative satellite access.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14920,"status":"not treated","reservation_date":"2024-04-10 08:42:06","uploaded":"2024-10-04 12:38:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.203","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1140.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410378.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.7.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410379","title":"Introduction of Store and Forward feature in EPC","source":"Huawei, HiSilicon, [Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of (postponed) S2-2409403. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14120,"status":"not treated","reservation_date":"2024-04-10 08:42:06","uploaded":"2024-10-04 12:38:36","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3801.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410379.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"3.1, 3.2, (new) 4.13.X, (new) 4.13.X.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410380","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revised in parallel session to S2-2410661.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14150,"status":"revised","reservation_date":"2024-04-10 08:42:07","uploaded":"2024-10-04 12:38:36","revisionof":"","revisedto":"S2-2410661","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410380.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.7.1 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410382","title":"Support of UE-SAT-UE communication via coordination between 5GC and IMS","source":"Huawei, HiSilicon, China Telecom","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Describe the coordination between 5GC and IMS to support UE-SAT-UE communication.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14700,"status":"not treated","reservation_date":"2024-04-10 08:42:10","uploaded":"2024-10-04 12:38:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5770.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410382.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.x.2 (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410383","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Functional description of P-CSCF for UE-SAT-UE communication. Call setup procedures of UE-SAT-UE communication which provide three different ways.","secretary_remarks":"Revised in parallel session to S2-2410624.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14580,"status":"revised","reservation_date":"2024-04-10 08:42:11","uploaded":"2024-10-04 12:38:36","revisionof":"","revisedto":"S2-2410624","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410383.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410384","title":"IMS-AGW relocation for UE-Sat-UE communication at change of satellite","source":"Huawei, HiSilicon, China Telecom","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an IMS-AGW relocation procedure for UE-Sat-UE communication.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14620,"status":"not treated","reservation_date":"2024-04-10 08:42:12","uploaded":"2024-10-04 12:38:36","revisionof":"","revisedto":"S2-2412013","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1493.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410384.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"AX.3.2 (new) ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410403","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"NTT DOCOMO, CATT, Samsung, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Revision of postponed) S2-2409421. Revised in parallel session to S2-2410623.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14500,"status":"revised","reservation_date":"2024-04-10 09:17:32","uploaded":"2024-10-04 09:32:55","revisionof":"S2-2409421","revisedto":"S2-2410623","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410403.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410404","title":"Support of UE-Satellite-UE communication in IMS - Procedure","source":"NTT DOCOMO","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to procedures.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14630,"status":"not treated","reservation_date":"2024-04-10 09:17:33","uploaded":"2024-10-04 09:32:55","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1494.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410404.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"Annex AX (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410409","title":"Support of Store and Forward Satellite Operation","source":"Huawei, HiSilicon, [Qualcomm Incorporated]","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of (postponed) S2-2409412. Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14360,"status":"not treated","reservation_date":"2024-04-10 09:42:25","uploaded":"2024-10-04 12:38:36","revisionof":"S2-2409412","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3815.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410409.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y (new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410418","title":"On the provisional Update Location Request.","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"discussion","for":"Agreement","abstract":"This paper concludes that the normative work should remain aligned with the conclusions in TR 23.700-29.","secretary_remarks":"Revised to S2-2410559","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14020,"status":"revised","reservation_date":"2024-04-10 10:01:44","uploaded":"2024-10-04 18:44:55","revisionof":"","revisedto":"S2-2410559","release":"Rel-19","crspec":"23.501","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410418.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410456","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Response to S2-2409605. Revised in parallel session to S2-2410656.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13930,"status":"revised","reservation_date":"2024-04-10 11:57:39","uploaded":"2024-10-04 16:52:54","revisionof":"","revisedto":"S2-2410656","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"RAN WG2, SA WG3-LI","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410456.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410457","title":"Additional aspects for S&F feature.","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"discussion","for":"Discussion","abstract":"SA WG2 has agreed conclusions for KI#2 i.e. for Store and Forward Satellite operation in the TR 23.700-29 and currently SA WG2 is in a process to agree normative text based on the agreed conclusions. This paper highlights additional aspects which needs to be considered to complete this feature.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14420,"status":"not treated","reservation_date":"2024-04-10 11:58:39","uploaded":"2024-10-04 12:14:30","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410457.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410460","title":"Additional aspects of S&F feature","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14430,"status":"not treated","reservation_date":"2024-04-10 12:02:41","uploaded":"2024-10-04 12:14:30","revisionof":"","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3825.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410460.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410473","title":"Updates to call flows for S&F feature","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14180,"status":"not treated","reservation_date":"2024-04-10 13:22:24","uploaded":"2024-10-04 13:26:49","revisionof":"","revisedto":"S2-2412076","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3826.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410473.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":true,"cn_affected":true,"clauses_affected":"5.3.2.1, 5.3.3.1, 5.3.3.2, 5.3.4.1, 5.3.8.3, 5.7.1, 5.11.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410549","title":"Discussion paper on AGW reallocation","source":"vivo","contact":"Amy Zhang","contact-id":105287,"tdoctype":"discussion","for":"Discussion","abstract":"Restrict scopes of mobility supports","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14490,"status":"noted","reservation_date":"2024-04-10 16:27:04","uploaded":"2024-10-04 17:12:54","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410549.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410554","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo], Google","contact":"Ellen C. Liao","contact-id":107199,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. 3. Clarification on this revision includes the following aspects (all marks in Blue color): Clarify definition of S&F operation mode about feederlink and service link Clarify a UE in S&F mode accesses services and networks in S&F mode operation follows the exisitng procedure. There is no need for registration process; Remove Editor's Note: Whether a UE operating in S&F mode should be handled as a 'registration mode' or as an operational condition for the UE is FFS. Reject cause can be exisiting or S&F reject cause code which is up to stage 3. Clarify UL delivery time and Editor's note","secretary_remarks":"Revision of (postponed) S2-2409403. Confirm CR Revision - CR states 4! Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14130,"status":"not treated","reservation_date":"2024-04-10 17:38:00","uploaded":"2024-10-04 19:12:17","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410554.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410556","title":"Introduction of S&F storage quota in the split MME architecture.","source":"NEC","contact":"Kundan Tiwari","contact-id":76330,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29. \/\/*************************************New Change *********************************\/ 2. It is proposed to implement S&F storage quota per UE in proposed split MME architecture. \/\/************************************New change ends*********\/","secretary_remarks":"Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14310,"status":"not treated","reservation_date":"2024-04-10 17:59:38","uploaded":"2024-10-04 18:12:13","revisionof":"","revisedto":"S2-2412057","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3829.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410556.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":true,"cn_affected":true,"clauses_affected":"Annex Y(new), Y.0(new), Y.1(new)","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410559","title":"On the provisional Update Location Request.","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"discussion","for":"Agreement","abstract":"This paper concludes that the normative work should remain aligned with the conclusions in TR 23.700-29.","secretary_remarks":"Revision of S2-2410418. Noted in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14030,"status":"noted","reservation_date":"2024-04-10 19:01:48","uploaded":"2024-10-04 19:05:59","revisionof":"S2-2410418","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410559.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410592","title":"Introduction of Store and Forward feature in EPC","source":"[Nokia, Novamint, NEC, Tencent, Sateliot, CATT, Intel, Vivo], Qualcomm","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation. For Rev 11: TR 23.700-29 clause 8.2 conclusions for KI#2 for a full CN onboard the satellite state that 'The UE attaches, transfers data (e.g. SMS, MO and MT data, etc.) and detaches from each satellite as required and as determined by the monitoring list'. Normative support for this detachment principle is needed which is added here and highlighted. Other changes in this revision of the CR are intended to align with changes in other revisions of this CR and are not intended to be applied to TS 23.401 if another revision is agreed.","secretary_remarks":"Revision of (postponed) S2-2409403. Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14140,"status":"not treated","reservation_date":"2024-04-10 21:26:27","uploaded":"2024-10-04 22:17:41","revisionof":"S2-2409403","revisedto":"","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":11.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410592.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410594","title":"Support of Store and Forward Satellite Operation","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of (postponed) S2-2409412. Wrong WI Code on CR! Revised in parallel session to S2-2410659.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14320,"status":"revised","reservation_date":"2024-04-10 21:35:06","uploaded":"2024-10-04 22:17:41","revisionof":"S2-2409412","revisedto":"S2-2410659","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3815.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410594.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410595","title":"UE determination for S&F mode operation or power saving","source":"Google","contact":"Ellen C. Liao","contact-id":107199,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The CR introduces the following aspects: Enhancement for the UE to determine whether to trigger power saving mechanism when the network in S&F operation mode. Enhancement for the Coverage Availability Information","secretary_remarks":"Wrong WI Code on CR! Not Handled","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14440,"status":"not treated","reservation_date":"2024-04-10 21:35:41","uploaded":"2024-10-04 21:37:51","revisionof":"","revisedto":"S2-2412317","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3831.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410595.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410622","title":"Architecture for UE-satellite-UE communicaitons","source":"Vivo, Thales, CATT, CSCN, Honor, Tencent, China Telecom, Samsung, Nokia","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an architecture to describe the interfaces.","secretary_remarks":"Revision of S2-2410313, merging S2-2410253. Revised in parallel session to S2-2410919.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14460,"status":"revised","reservation_date":"2024-10-15 06:46:46","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410313","revisedto":"S2-2410919","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1427.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410622.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410623","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"NTT DOCOMO, CATT, Samsung, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Revision of S2-2410403. Revised in parallel session to S2-2410920.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14510,"status":"revised","reservation_date":"2024-10-15 06:46:47","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410403","revisedto":"S2-2410920","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410623.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410624","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2410383. Revised in parallel session to S2-2410921.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14590,"status":"revised","reservation_date":"2024-10-15 06:46:48","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410383","revisedto":"S2-2410921","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410624.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410625","title":"Support of UE-Satellite-UE communication","source":"[CATT, vivo, NTT DOCOMO, CSCN, Thales, China Telecom, Nokia, OPPO, SAMSUNG], CATT, Huawei","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Add UE-Satellite-UE communication definition. 2\/ Add a new clause to describe the feature. 3\/ add a new annex to illustrate the architecture of supporting UE-satellite-UE communication,","secretary_remarks":"Revision of S2-2409845. Revised in parallel session to S2-2410922.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14660,"status":"revised","reservation_date":"2024-10-15 06:46:50","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2409845","revisedto":"S2-2410922","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5583.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410625.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410626","title":"[DRAFT] Reply LS on Support of Regenerative-based Satellite Access","source":"Qualcomm Technologies","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 would like to inform RAN WG3 that the conclusions for FS_5GSAT_Ph3 for 'KI#1: Support of Regenerative-based satellite access' in clause 8.1 of TR 23.700-29 apply to both E-UTRAN\/EPS and NG-RAN\/5GS and therefore the related RAN WG3 impacts are expec","secretary_remarks":"Revision of S2-2410082. Revised in parallel session to S2-2410918.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14750,"status":"revised","reservation_date":"2024-10-15 06:46:51","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410082","revisedto":"S2-2410918","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"},{"winame":" 5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, RAN","Cc":"RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410626.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410627","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon, China Telecom, ETRI","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings.","secretary_remarks":"Revision of S2-2410195. Revised in parallel session to S2-2410917.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14800,"status":"revised","reservation_date":"2024-10-15 06:46:51","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410195","revisedto":"S2-2410917","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410627.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410656","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Revision of S2-2410456. Revised in parallel session to S2-2410923.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13940,"status":"revised","reservation_date":"2024-10-15 06:47:10","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410456","revisedto":"S2-2410923","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"RAN WG2, SA WG3-LI","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410656.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410657","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, [Novamint, NEC, Tencent, CATT, Intel, Vivo], Sateliot, Qualcomm, LGE, OPPO","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of S2-2410234. Revised in parallel session to S2-2410924.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14050,"status":"revised","reservation_date":"2024-10-15 06:47:10","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410234","revisedto":"S2-2410924","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":12.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410657.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410658","title":"Introduction to Split MME architecture","source":"Samsung, Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410348. Revised in parallel session to S2-2410925.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14270,"status":"revised","reservation_date":"2024-10-15 06:47:11","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410348","revisedto":"S2-2410925","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410658.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410659","title":"Support of Store and Forward Satellite Operation","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of S2-2410594. Revised in parallel session to S2-2410926.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14330,"status":"revised","reservation_date":"2024-10-15 06:47:11","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410594","revisedto":"S2-2410926","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3815.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410659.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410660","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC, CATT","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410351. Revised in parallel session to S2-2410928.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14390,"status":"revised","reservation_date":"2024-10-15 06:47:11","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410351","revisedto":"S2-2410928","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410660.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410661","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2410380. Revised in parallel session to S2-2410927.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14160,"status":"revised","reservation_date":"2024-10-15 06:47:11","uploaded":"2024-10-20 10:31:11","revisionof":"S2-2410380","revisedto":"S2-2410927","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410661.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410917","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon, China Telecom, ETRI","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings.","secretary_remarks":"Revision of S2-2410627. Revised in parallel session to S2-2410992.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14810,"status":"revised","reservation_date":"2024-10-18 02:11:21","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410627","revisedto":"S2-2410992","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410917.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410918","title":"Reply LS on Support of Regenerative-based Satellite Access","source":"Qualcomm Technologies","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"LS out","for":"Approval","abstract":"Response to S2-2407410 (R3-243954). To: RAN WG3, TSG RAN. CC: RAN WG2","secretary_remarks":"Revision of S2-2410626. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14760,"status":"approved","reservation_date":"2024-10-18 02:11:38","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410626","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_NTN_Ph3-Core"},{"winame":" 5GSAT_Ph3_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2407410","lsto":"RAN WG3, TSG RAN","Cc":"RAN WG2","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410918.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410919","title":"Architecture for UE-satellite-UE communicaitons","source":"Vivo, Thales, CATT, CSCN, Honor, Tencent, China Telecom, Samsung, Nokia","contact":"Amy Zhang","contact-id":105287,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add an architecture to describe the interfaces.","secretary_remarks":"Revision of S2-2410622. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14470,"status":"agreed","reservation_date":"2024-10-18 02:11:38","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410622","revisedto":"","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1427.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410919.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410920","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"NTT DOCOMO, CATT, Samsung, China Telecom","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Revision of S2-2410623. Revised in parallel session to S2-2410986.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14520,"status":"revised","reservation_date":"2024-10-18 02:11:39","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410623","revisedto":"S2-2410986","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410920.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410921","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2410624. Revised in parallel session to S2-2410987.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14600,"status":"revised","reservation_date":"2024-10-18 02:11:41","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410624","revisedto":"S2-2410987","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410921.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410922","title":"Support of UE-Satellite-UE communication","source":"[CATT, vivo, NTT DOCOMO, CSCN, Thales, China Telecom, Nokia, OPPO, SAMSUNG], CATT, Huawei","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Add UE-Satellite-UE communication definition. 2\/ Add a new clause to describe the feature. 3\/ add a new annex to illustrate the architecture of supporting UE-satellite-UE communication,","secretary_remarks":"Revision of S2-2410625. Revised in parallel session to S2-2410988.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14670,"status":"revised","reservation_date":"2024-10-18 02:11:43","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410625","revisedto":"S2-2410988","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5583.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410922.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410923","title":"[DRAFT] Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"Sateliot","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","secretary_remarks":"Revision of S2-2410656. Revised to S2-2411250.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13950,"status":"revised","reservation_date":"2024-10-18 02:11:58","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410656","revisedto":"S2-2411250","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3","Cc":"RAN WG2, SA WG3-LI","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410923.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410924","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, Sateliot, Qualcomm, LGE, OPPO, SHARP, Google, CATT, [Novamint, NEC, Tencent, Intel, Vivo],","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of S2-2410657. Revised in parallel session to S2-2410989.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14060,"status":"revised","reservation_date":"2024-10-18 02:11:58","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410657","revisedto":"S2-2410989","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":13.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410924.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410925","title":"Introduction to Split MME architecture","source":"Samsung, Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO, SHARP, Nokia","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410658. Revised in parallel session to S2-2410990.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14280,"status":"revised","reservation_date":"2024-10-18 02:11:59","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410658","revisedto":"S2-2410990","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":8.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410925.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410926","title":"Support of Store and Forward Satellite Operation","source":"Qualcomm Incorporated","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of S2-2410659. Revised in parallel session to S2-2410991.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14340,"status":"revised","reservation_date":"2024-10-18 02:12:00","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410659","revisedto":"S2-2410991","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3815.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410926.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410927","title":"Procedures for Store and Forward Satellite Operations","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of the satellite S&F functionality, including capability negotiation, rejection causes and lists of satellites to monitor in the relevant procedures.","secretary_remarks":"Revision of S2-2410661. Postponed in parallel session","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14170,"status":"postponed","reservation_date":"2024-10-18 02:12:01","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410661","revisedto":"S2-2411449, S2-2411725, S2-2411814, S2-2412010, S2-2412103","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":3824.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410927.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410928","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC, CATT","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410660. Revised in parallel session to S2-2410985.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14400,"status":"revised","reservation_date":"2024-10-18 02:12:01","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410660","revisedto":"S2-2410985","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":6.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410928.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410985","title":"Monitoring event for S&F","source":"Samsung, Sateliot, China Telecom, NEC, CATT","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Monitoring event for S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410928. Agreed in parallel session. Block approved. Revised at S2-166 in S2-2411851","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14410,"status":"revised","reservation_date":"2024-10-18 02:14:54","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410928","revisedto":"S2-2411726, S2-2411851","release":"Rel-19","crspec":"23.682","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":495.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410985.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410986","title":"Support of UE-Satellite-UE communication in IMS - Functionality","source":"NTT DOCOMO, CATT, Samsung, China Telecom, Nokia","contact":"Atsushi Minokuchi","contact-id":26474,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of Support of UE-Satellite-UE communication in IMS with regards to functionality.","secretary_remarks":"Revision of S2-2410920. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14530,"status":"agreed","reservation_date":"2024-10-18 02:14:54","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410920","revisedto":"S2-2411952, S2-2411990, S2-2412223","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1428.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410986.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410987","title":"Call setup of UE-Satellite-UE communication in IMS with IMS-AGW on board","source":"Huawei, HiSilicon, NTT DOCOMO, China Telecom, CATT","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Addition of support of UE-Satellite-UE communication in IMS, including: Call setup procedures of UE-SAT-UE communication.","secretary_remarks":"Revision of S2-2410921. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14610,"status":"agreed","reservation_date":"2024-10-18 02:14:54","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410921","revisedto":"S2-2411464, S2-2412012","release":"Rel-19","crspec":"23.228","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":1492.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410987.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410988","title":"Support of UE-Satellite-UE communication","source":"CATT, vivo, NTT DOCOMO, CSCN, Thales, China Telecom, Nokia, OPPO, SAMSUNG, TNO, Huawei, HiSilicon","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1\/ Add UE-Satellite-UE communication definition. 2\/ Add a new clause to describe the feature.","secretary_remarks":"Revision of S2-2410922. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14680,"status":"agreed","reservation_date":"2024-10-18 02:14:55","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410922","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5583.0,"crrevision":7.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410988.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410989","title":"Introduction of Store and Forward feature in EPC","source":"Nokia, Sateliot, Qualcomm, LGE, Intel, OPPO, SHARP, Google, CATT, [Novamint, NEC, Tencent, Vivo],","contact":"Saubhagya Baliarsingh","contact-id":98717,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Introduction of Store and Forward Architectural options. 2. Generic principles of Store and Forward Satellite operation.","secretary_remarks":"Revision of S2-2410924. This CR was postponed.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14070,"status":"postponed","reservation_date":"2024-10-18 02:14:55","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410924","revisedto":"S2-2411448, S2-2411724, S2-2411813, S2-2411844, S2-2412009, S2-2412102, S2-2412296","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3801.0,"crrevision":14.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410989.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410990","title":"Introduction to Split MME architecture","source":"Samsung, Sateliot, NEC, China Telecom, Intel , Xiaomi, TNO, SHARP, Nokia","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: S&F feature is implemented based on the conclusions reached for KI#2 in TR 23.700-29.","secretary_remarks":"Revision of S2-2410925. Agreed in parallel session. Block approved. Revised at S2-166 in S2-2411856","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14290,"status":"revised","reservation_date":"2024-10-18 02:14:55","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410925","revisedto":"S2-2411422, S2-2411856, S2-2412267","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3800.0,"crrevision":9.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410990.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410991","title":"Support of Store and Forward Satellite Operation","source":"Qualcomm Incorporated, Huawei","contact":"Stephen Edge","contact-id":84641,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add support for the conclusions of TR 23.700-29 and objectives of the WI in SP-240628 related to store and forward satellite operation. Add an informative description in an Annex of the solution using a full CN (EPC) onboard a satellite.","secretary_remarks":"Revision of S2-2410926. Agreed in parallel session. Block approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14350,"status":"agreed","reservation_date":"2024-10-18 02:14:55","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410926","revisedto":"S2-2411421, S2-2412266","release":"Rel-19","crspec":"23.401","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":3815.0,"crrevision":10.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410991.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410992","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon, China Telecom, ETRI","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings.","secretary_remarks":"Revision of S2-2410917. Revised to S2-2411251.","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14820,"status":"revised","reservation_date":"2024-10-18 02:14:55","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410917","revisedto":"S2-2411251","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410992.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411250","title":"Reply LS on FS_5GSAT_Ph3_ARCH conclusions","source":"SA WG2","contact":"Ramon Ferrus","contact-id":86091,"tdoctype":"LS out","for":"Approval","abstract":"Response to S2-2409605 (S3-243533). To: SA WG3. CC: RAN WG2, SA WG3-LI.","secretary_remarks":"Revision of S2-2410923. This LS OUT was approved","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":13960,"status":"approved","reservation_date":"2024-10-20 09:22:58","uploaded":"2024-10-20 10:31:16","revisionof":"S2-2410923","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph3-ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-2409605","lsto":"SA WG3","Cc":"RAN WG2, SA WG3-LI","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2411250.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411251","title":"Support of Regenerative Payload with NG-RAN Node Onboard Satellite","source":"OPPO, Huawei, HiSilicon, China Telecom, ETRI, China Southern Power Grid, Samsung, Xiaomi","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduce the impact that regenerative-based satellite access brought to N2 connection management. Note that an NF can determine regenerative use, how RAN transitioning between NTN GWs can be handled, and different CN PDB that regenerative satellite access brings.","secretary_remarks":"Revision of S2-2410992. This CR was agreed","agenda_item_sort_order":113,"ainumber":"19.1.2","ainame":"Integration of satellite components in the 5G architecture Phase III (5GSAT_Ph3_ARCH)","tdoc_agenda_sort_order":14830,"status":"agreed","reservation_date":"2024-10-20 09:22:58","uploaded":"2024-10-20 10:31:16","revisionof":"S2-2410992","revisedto":"S2-2411676, S2-2411727, S2-2411817","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"5GSAT_Ph3_ARCH"}],"crnumber":5622.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"SP-241485","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2411251.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]