[{"name":"SP-180285","title":"New WID on Enhancements to Framework for Live Uplink Streaming (E-FLUS)","source":"SA WG4","contact":"Paolino Usai","contact-id":3209,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Based on the discussion in the justification, the objective of this work item includes the following: - Recommend new QoS features including new QCI\/5QI values corresponding to new options in trading off video quality for media delivery latency. - Specify, as needed, means to leverage existing interfaces and contribute to evolving 5G interfaces that can be used by external content providers for requesting QoS support of service delivery in non-IMS deployment scenarios. - Specify the necessary control plane functionality to support downstream media distribution, via 3GPP MBMS or PSS networks, by the network-based FLUS sink which had previously received the uplink media content from the FLUS source.  - Define or leverage definitions of network-based media processing functions (e.g., video stitching, media transcoding and content reformatting), and enablers (e.g. network APIs), such that the remote source can make use of such functions. Also define the necessary system metadata","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12920,"status":"approved","reservation_date":"2018-05-08 09:05:24","uploaded":"2018-05-28 09:00:24","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180285.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180286","title":"New WID on Alternative EVS implementation using updated fixed-point basic operators (Alt_FX_EVS)","source":"SA WG4","contact":"Paolino Usai","contact-id":3209,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objectives of the WI are to: 1. Develop and standardize an alternative fixed-point implementation of EVS using the extended set of fixed-point basic operators defined in TR 26.973. This alternative implementation shall be validated according to the procedure in clause 5.3 of TR 26.973. As specified in clause 5.3.3, the following 4 configurations will be tested: a) Ref_fxd encoder - Ref_fxd decoder b) CuT encoder - CuT decoder c) Ref_fxd encoder - CuT decoder d) CuT encoder - Ref_fxd decoder Ref_fxd_encoder and Ref_fxd_decoder refer to the current fixed-point code (TS 26.442) and CuT_encoder and CuT_decoder refer to the alternative implementation of EVS. The alternative implementation shall not perform worse than the current fixed-point code, i.e. the configurations b), c) and d) shall not perform worse than the configuration a) for any condition. NOTE: In case further modifications to the proposed extended basic operators are agreed during the updates to Recommendation I","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12930,"status":"approved","reservation_date":"2018-05-08 09:05:24","uploaded":"2018-05-28 09:00:24","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180286.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180287","title":"New WID on Addition of HLG HDR to TV Video Profiles (HLG_HDR)","source":"SA WG4","contact":"Paolino Usai","contact-id":3209,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work item is to define the relevant extensions to support High Dynamic Range in 3GPP TV Video Profiles, based on Hybrid Log Gamma (HLG), which is specified by ITU-R in ITU-R Recommendation BT.2100.  Specifically, the following objectives are addressed: 1. Add an HDR video profile for 3GPP PSS and MBMS User Services based on HLG, following the recommendation of the TR 26.949, which includes a. the elementary stream requirements and constraints for HEVC b. The transfer functions and color primaries 2. Enable usage of the HLG HDR profile in the 3GPP PSS and MBMS User Services There is the general aim to harmonize with broader industry consensus, in particular DVB.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12940,"status":"approved","reservation_date":"2018-05-08 09:05:25","uploaded":"2018-05-28 09:00:25","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180287.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180315","title":"New WID on Multi-device and Multi-identity (MuD)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective The objective of this work item is to add service requirements for the multi-device and multi-identity use cases as described above.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12950,"status":"approved","reservation_date":"2018-05-29 09:47:46","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180315.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180316","title":"Stage 1 CRs on MuD","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR pack","for":"Approval","abstract":"22.173 CR0118R3","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12960,"status":"approved","reservation_date":"2018-05-29 09:48:36","uploaded":"2018-05-31 08:41:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180316.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S1-181739","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.173,"crnumber":118,"crrevision":3.0,"crcategory":"B","crrelease":"Rel-16","crspecversion":"15.1.0","crtitle":"Multi-device requirements (MuD)"}],"crsinpacknumber":1},
{"name":"SP-180317","title":"New WID on Inter-RAT Mobility requirements for real time service (MOBRT)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Regarding the inter-RAT mobility, it is proposed to specify the mobility requirements for real-time service, considering time interruption, packet latency, and packet loss, etc. NOTE: The mobility effect on other kinds of services except real-time service may be also applied if needed.","secretary_remarks":"Revised to SP-180592.","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12970,"status":"revised","reservation_date":"2018-05-29 09:49:26","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"SP-180592","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180317.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180318","title":"Stage 1 CRs on MOBRT","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR pack","for":"Approval","abstract":"22.261 CR0253","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12990,"status":"approved","reservation_date":"2018-05-29 09:50:10","uploaded":"2018-05-31 08:41:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180318.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S1-181659","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.261,"crnumber":253,"crrevision":"","crcategory":"B","crrelease":"Rel-16","crspecversion":"16.3.0","crtitle":"Inter-RAT Mobility requirement for realtime service (MOBRT)"}],"crsinpacknumber":1},
{"name":"SP-180319","title":"New WID on LAN support in 5G (5GLAN)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work item is to develop Stage 1 normative service requirements for 5G system to support 5G LAN-type services. This work will consider the potential requirements identified and concluded in TR 22.821 and use them as the basis for developing stage 1 normative requirements.  This work item aims to update TS 22.261, with the following aspects addressed: - General service requirements to enable 5G LAN-type services (connections, support for IP and Ethernet, service continuity, discovery, \u2026) - 5GLAN creation and management - 5G Private Virtual Network - 5GLAN service authorization  - Mobility and service continuity for 5G LAN-type service - Ethernet enhancements - Indirect communication for 5G LAN-type service - Service exposure for 5G LAN-type service - Security, isolation and privacy  To avoid any possible overlap between 5G LAN and cyberCAV during the normative phase, this work item will focus on the generic functional requirements needed for 5G LAN type o","secretary_remarks":"Revised to SP-180593.","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13000,"status":"revised","reservation_date":"2018-05-29 09:50:58","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"SP-180593","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180319.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180320","title":"Stage 1 CRs on 5GLAN","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR pack","for":"Approval","abstract":"22.261 CR0101R3","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13020,"status":"approved","reservation_date":"2018-05-29 09:51:23","uploaded":"2018-05-31 08:41:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180320.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S1-181547","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.261,"crnumber":101,"crrevision":3.0,"crcategory":"B","crrelease":"Rel-16","crspecversion":"16.3.0","crtitle":"Inclusion of ethernet transport services in TS 22.261 (5GLAN)"}],"crsinpacknumber":1},
{"name":"SP-180322","title":"New WID on Enhancement of LTE for Efficient delivery of Streaming Service (eLSTR)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work is to specify normative service requirements for the efficient delivery of Streaming Service over LTE. The three scenarios for which service requirements will be specified are: - operator controlled Caching service delivery - service delivery via an optimized path, and - authorization and security","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13030,"status":"approved","reservation_date":"2018-05-29 09:52:57","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180322.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180323","title":"Stage 1 CRs on eLSTR","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR pack","for":"Approval","abstract":"22.278 CR0245R3; 22.115 CR0091R3","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13040,"status":"approved","reservation_date":"2018-05-29 09:53:30","uploaded":"2018-05-31 08:41:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180323.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S1-181750","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.278,"crnumber":245,"crrevision":3.0,"crcategory":"F","crrelease":"Rel-16","crspecversion":"15.2.0","crtitle":"Support of streaming services (eLSTR)"},{"crtdoc":"S1-181751","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.115,"crnumber":91,"crrevision":3.0,"crcategory":"B","crrelease":"Rel-16","crspecversion":"15.3.0","crtitle":"Charging for streaming services (eLSTR)"}],"crsinpacknumber":2},
{"name":"SP-180324","title":"New WID on Policy delivery to UE for background data transfer (PDBDT)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item is to specify service requirements for enhancement of the background data transfer. It is intended to specify a new aspect as follows: 5G core network to provide policies to a UE for the background data transfer.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13050,"status":"approved","reservation_date":"2018-05-29 09:54:19","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180324.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180325","title":"Stage 1 CRs on PDBDT","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR pack","for":"Approval","abstract":"22.261 CR0098R3","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13060,"status":"approved","reservation_date":"2018-05-29 09:54:47","uploaded":"2018-05-31 08:41:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180325.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S1-181671","crwgdecision":"agreed","crtsgdecision":"approved","crspec":22.261,"crnumber":98,"crrevision":3.0,"crcategory":"B","crrelease":"Rel-16","crspecversion":"16.3.0","crtitle":"Policy delivery to UE for background data transfer (PDBDT)"}],"crsinpacknumber":1},
{"name":"SP-180326","title":"New WID on Integration of Satellite Access in 5G (5GSAT)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objectives of this normative work are to specify the Stage 1 requirements for the integration of satellite access when considering the use cases as described in TR 22.822. The following use cases are to be addressed: - Roaming between terrestrial and satellite networks - Broadcast and multicast with a satellite overlay - Internet of Things with a satellite network - Temporary use of a satellite component - Optimal routing or steering over a satellite - Satellite trans-border service continuity - Global satellite overlay - Indirect connection through a 5G satellite access network - 5G Fixed Backhaul between NR and the 5G Core - 5G Moving Platform Backhaul - 5G to Premises - Off-shore Wind Farms  The new requirements that are to be introduced in a corresponding revision of TS 22.261 will be based on the results of the study FS_5GSAT specified in TR 22.822.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13070,"status":"approved","reservation_date":"2018-05-29 09:55:16","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180326.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180327","title":"New WID on Maritime Communication Services over 3GPP System (MARCOM)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The Objective: of this normative work is to specify the Stage 1 requirements to support maritime communication services over 3GPP system. This normative work is to specify the Stage 1 requirements that are - to enable existing 3GPP enabling technologies to be applicable to maritime domain - to support maritime communication services related to the general maritime usage - to support maritime communication services dedicated to authority-related usage on maritime safety  and traffic management  The requirements that are to be introduced in TS 22.XXX are based on the results of the study FS_MARCOM specified in TR 22.819.","secretary_remarks":"Revised to SP-180594.","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13080,"status":"revised","reservation_date":"2018-05-29 09:55:51","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"SP-180594","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180327.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180328","title":"New WID on User Identities and Authentication (UIA)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The goal of this work is to introduce normative requirements for an optional, user-centric authentication layer on top of the existing subscription authentication, supporting various authentication mechanisms and interactions with external authentication systems as well as a degree of confidence (i.e. a value that allows differentiated service policies depending on the reliability of the user identifier).  The new authentication layer shall not replace existing subscription credentials. The security and privacy of subscriber or end user data shall not be compromised. The requirements enable to provide user identities to human users, applications and devices. These can be used within the 3GPP system e.g. to provide customized services, access to services or network slices and enhanced charging. The identities can also be provided to external entities e.g. to enable authentication for systems and services outside 3GPP.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13100,"status":"approved","reservation_date":"2018-05-29 09:56:22","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180328.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180329","title":"New WID on 5G positioning services (5G_HYPOS)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work is to specify the stage 1 requirements to support positioning services in 5G. The output of this work will update the requirements relating to positioning in 3GPP TS 22.261, using the results and potential requirements identified in TR 22.872.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13110,"status":"approved","reservation_date":"2018-05-29 09:56:58","uploaded":"2018-05-31 12:33:39","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180329.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180378","title":"New WID on Enhancements to Functional architecture and information flows for Mission Critical Data","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: SA WG6 objectives are: 1) Develop and agree on Stage 2 technical solutions for the list of areas specified in the Justification section above. 2) Based on the agreement reached in 1) above, update the relevant Stage 2 Technical Specifications accordingly. 3) Coordinate with other relevant WGs to make sure they are aware the impacts in their development areas.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13120,"status":"approved","reservation_date":"2018-06-01 08:43:06","uploaded":"2018-06-07 07:36:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180378.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180379","title":"New WID on Enhanced Mission Critical System Migration and Interconnection","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The SA WG6 objectives are as follows: - Implement normative changes to existing MC service related stage-2 specifications to include additional procedures, information flows and configuration to complete the functionality described in the justification above.  Solutions may be based on those described in 3GPP TR 23.781. Existing, standardized mechanisms shall be utilized where possible and justified. SA WG6 should discuss the technical viability of the solutions with other working groups when necessary.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13130,"status":"approved","reservation_date":"2018-06-01 08:43:06","uploaded":"2018-06-07 07:36:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180379.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180380","title":"New WID on MBMS APIs for Mission Critical Services","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work item is to develop the normative stage 2 specification of MBMS APIs for mission critical services. The normative work will be based on the conclusions from TR 23.792. Additional solutions may be investigated and included. The objective includes: - Define the reference model where the MBMS APIs are applied to support multicast mission critical services. - Define the UE APIs providing the access to MBMS mission critical services for mission critical applications, as defined in TS 23.280, TS 23.379, TS 23.281 and TS 23.282.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13140,"status":"approved","reservation_date":"2018-06-01 08:43:06","uploaded":"2018-06-07 07:36:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180380.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180381","title":"New WID on Enhanced Mission Critical Communication Interworking with Land Mobile Radio Systems","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objectives include: 1.  Analyze the interworking architecture to identify those architectural aspects that have not been fully specified. This includes the items in clause 3 - Justification.  2.  For those requirements and architectural aspects identified above:  - Specify the MCPTT architectural requirements; - Specify enhancements to the stage 2 (architecture) for interworking at the application level; - Specify procedures, information flows, and configuration parameters as needed. This work item will build upon the stage 2 architecture developed for Release 15, and provide for backward compatibility. Stage 2 architecture for interworking is contained in 3GPP TS 23.283.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13150,"status":"approved","reservation_date":"2018-06-01 08:43:06","uploaded":"2018-06-07 07:36:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180381.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180382","title":"New WID on Enhanced Mission Critical Push-to-talk architecture phase 2","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objectives include: 1. Review and identify requirements from Stage 1, which are applicable to MCPTT, and have yet to be fully supported by the MCPTT functional architecture and information flows. This includes items (a) through (f) in clause 3 - Justification. 2.  Analyze the MCPTT architecture to identify those architectural aspects that have not been fully specified. This includes items (a) through (f) in clause 3 - Justification.  3.  For those architectural aspects identified in objectives (1) and (2):  - Specify the MCPTT architectural requirements, procedures, information flows, and configuration parameters as needed. This work item will build upon the stage 2 architecture developed for Release 15, and provide for backward compatibility. Stage 2 architecture for MCPTT is contained both in 3GPP TS 23.280 and 3GPP TS 23.379.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13160,"status":"approved","reservation_date":"2018-06-01 08:43:06","uploaded":"2018-06-07 07:36:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180382.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180391","title":"Charging for IMS over 5G System Architecture Phase 1","source":"SA WG5","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work item is to introduce specific new 5GS IP-CAN in IMS charging, in particular: - 5GS charging identifier for correlation; - P-Access-Network-Info header extensions for 5GS. Both IMS offline and online charging are covered and based on the existing charging architecture for IMS.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13170,"status":"approved","reservation_date":"2018-06-01 09:55:52","uploaded":"2018-06-06 10:44:30","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180391.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180426","title":"Rel-15 CRs on Charging for IMS over 5G System Architecture Phase 1 (5GS_Ph1_IMSCH)","source":"SA WG5","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"CR pack","for":"Approval","abstract":"32.260 CR0393R1; 32.299 CR0804R1; 32.240 CR0404R1; 32.298 CR0661R1","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13180,"status":"approved","reservation_date":"2018-06-01 09:56:53","uploaded":"2018-06-04 14:24:14","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"DUMMY"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180426.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S5-183568","crwgdecision":"agreed","crtsgdecision":"approved","crspec":32.26,"crnumber":393,"crrevision":1.0,"crcategory":"B","crrelease":"Rel-15","crspecversion":"14.4.0","crtitle":"Rel-15 CR TS 32.260  Introduce IMS over 5GS"},{"crtdoc":"S5-183569","crwgdecision":"agreed","crtsgdecision":"approved","crspec":32.299,"crnumber":804,"crrevision":1.0,"crcategory":"B","crrelease":"Rel-15","crspecversion":"15.2.0","crtitle":"Rel-15 CR TS 32.299  Introduce IMS over 5GS"},{"crtdoc":"S5-183570","crwgdecision":"agreed","crtsgdecision":"approved","crspec":32.24,"crnumber":404,"crrevision":1.0,"crcategory":"B","crrelease":"Rel-15","crspecversion":"15.1.0","crtitle":"Rel-15 CR TS 32.240  Introduce IMS over 5G"},{"crtdoc":"S5-183571","crwgdecision":"agreed","crtsgdecision":"approved","crspec":32.298,"crnumber":661,"crrevision":1.0,"crcategory":"B","crrelease":"Rel-15","crspecversion":"15.2.0","crtitle":"Rel-15 CR TS 32.298  Introduce IMS over 5GS"}],"crsinpacknumber":4},
{"name":"SP-180439","title":"Mission Critical Services Security Enhancements","source":"SA WG3","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item will address the SA WG3 normative security work for the mission critical architecture based on the output of SA WG6 as specified in TS 23.179, TS 23.280, TS 23.281 and TS 23.282 and 23.283 including: - Mission critical PTT, MCPTT functional architecture and information flows; - Mission critical data, MCData Functional architecture and information flows; - Mission critical Video, MCVideo Functional architecture and information flows; - Interconnect, mission critical interconnection between MCPTT systems, with a scope that includes the mission critical services of MCPTT, MCVideo and MCData; - Interworking, mission critical interworking between MC systems and LMR systems which includes MCPTT and MCData (SDS only) services. - Migration, mission critical migration between MCPTT systems, which includes the mission critical services of MCPTT, MCVideo and MCData; - MONASTERY, mission critical future railway architecture for MCPTT, MCData and MCVideo; - MBMS, usage of","secretary_remarks":"Revised to SP-180596.","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13190,"status":"revised","reservation_date":"2018-06-01 10:44:44","uploaded":"2018-06-05 14:34:59","revisionof":"","revisedto":"SP-180596","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180439.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180509","title":"New WID: 5GS Transfer of Policies for Background Data Transfer","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item standardizes architectural aspect for enhancement of the background data transfer as defined in stage 1:  It is intended to specify the following aspect: 1) The existing URSP framework will be used for delivery of policy information related to background data transfer from 5G core network to the UE. 2) The policy information content will define time window and location criteria that need to be met for background data transfer. 3) How and when the PCF activates\/disbributes the policies related with background data transfer to the UEs will be defined. 4) There is a single dedicated PDU Session that is used for background data transfer which is established and released based on the background data transfer policies. The policy should consider to avoid huge number of UE sending the data and or signalling to the network at  the same time.","secretary_remarks":"Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13210,"status":"approved","reservation_date":"2018-06-05 05:21:46","uploaded":"2018-06-06 07:38:01","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180509.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180592","title":"New WID on Inter-RAT Mobility requirements for real time service (MOBRT)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Regarding the inter-RAT mobility, it is proposed to specify the mobility requirements for real-time service, considering time interruption, packet latency, and packet loss, etc. NOTE: The mobility effect on other kinds of services except real-time service may be also applied if needed.","secretary_remarks":"Revision of SP-180317. Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":12980,"status":"approved","reservation_date":"2018-06-15 18:06:01","uploaded":"2018-06-16 00:07:54","revisionof":"SP-180317","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180592.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180593","title":"New WID on LAN support in 5G (5GLAN)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this work item is to develop Stage 1 normative service requirements for 5G system to support 5G LAN-type services. This work will consider the potential requirements identified and concluded in TR 22.821 and use them as the basis for developing stage 1 normative requirements.  This work item aims to update TS 22.261, with the following aspects addressed: - General service requirements to enable 5G LAN-type services (connections, support for IP and Ethernet, service continuity, discovery, \u2026) - 5GLAN creation and management - 5G Private Virtual Network - 5GLAN service authorization  - Mobility and service continuity for 5G LAN-type service - Ethernet enhancements - Indirect communication for 5G LAN-type service - Service exposure for 5G LAN-type service - Security, isolation and privacy  To avoid any possible overlap between 5G LAN and cyberCAV during the normative phase, this work item will focus on the generic functional requirements needed for 5G LAN type o","secretary_remarks":"Revision of SP-180319. Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13010,"status":"approved","reservation_date":"2018-06-15 18:06:01","uploaded":"2018-06-16 00:07:54","revisionof":"SP-180319","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180593.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180594","title":"New WID on Maritime Communication Services over 3GPP System (MARCOM)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The Objective: of this normative work is to specify the Stage 1 requirements to support maritime communication services over 3GPP system. This normative work is to specify the Stage 1 requirements that are - to enable existing 3GPP enabling technologies to be applicable to maritime domain - to support maritime communication services related to the general maritime usage - to support maritime communication services dedicated to authority-related usage on maritime safety  and traffic management  The requirements that are to be introduced in TS 22.XXX are based on the results of the study FS_MARCOM specified in TR 22.819.","secretary_remarks":"Revision of SP-180327.. Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13090,"status":"approved","reservation_date":"2018-06-15 18:06:01","uploaded":"2018-06-16 00:07:54","revisionof":"SP-180327","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180594.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180596","title":"Mission Critical Services Security Enhancements","source":"SA WG3","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item will address the SA WG3 normative security work for the mission critical architecture based on the output of SA WG6 as specified in TS 23.179, TS 23.280, TS 23.281 and TS 23.282 and 23.283 including: - Mission critical PTT, MCPTT functional architecture and information flows; - Mission critical data, MCData Functional architecture and information flows; - Mission critical Video, MCVideo Functional architecture and information flows; - Interconnect, mission critical interconnection between MCPTT systems, with a scope that includes the mission critical services of MCPTT, MCVideo and MCData; - Interworking, mission critical interworking between MC systems and LMR systems which includes MCPTT and MCData (SDS only) services. - Migration, mission critical migration between MCPTT systems, which includes the mission critical services of MCPTT, MCVideo and MCData; - MONASTERY, mission critical future railway architecture for MCPTT, MCData and MCVideo; - MBMS, usage of","secretary_remarks":"Revision of SP-180439.. Approved","agenda_item_sort_order":196,"ainumber":"18","ainame":"Proposed New WIDs (not part of an existing feature)","tdoc_agenda_sort_order":13200,"status":"approved","reservation_date":"2018-06-15 18:06:01","uploaded":"2018-06-16 00:07:54","revisionof":"SP-180439","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_80\/Docs\/SP-180596.zip","group":"SP","meeting":"SP-80","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]