[{"name":"S4-232017","title":"FS_FGS Permanent document","source":"Dolby Laboratories Inc.","contact":"Brian Lee","contact-id":104890,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"15.6","ainame":"FS_FGS (Feasibility Study on Film Grain synthesis)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2023-11-16 16:56:22","uploaded":"2023-11-17 22:21:14","revisionof":"S4-231495","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GVideo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG4_CODEC\/TSGS4_126_Chicago\/Docs\/S4-232017.zip","group":"S4","meeting":"S4-126","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S4-232018","title":"[FS_FGS] Time and Work Plan","source":"Dolby Laboratories Inc.","contact":"Brian Lee","contact-id":104890,"tdoctype":"Work Plan","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":98,"ainumber":"15.6","ainame":"FS_FGS (Feasibility Study on Film Grain synthesis)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2023-11-16 16:59:15","uploaded":"2023-11-17 22:21:14","revisionof":"S4-231660","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GVideo"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG4_CODEC\/TSGS4_126_Chicago\/Docs\/S4-232018.zip","group":"S4","meeting":"S4-126","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]