[{"name":"C3-151101","title":"Diameter overload control over S15","source":"ZTE, China Telecom","contact":"Xiaoyun Zhou","contact-id":38525,"tdoctype":"CR","for":"Decision","abstract":"Support the Diameter overload control over S15","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4090,"status":"merged","reservation_date":"2015-05-14 08:05:49","uploaded":"2015-05-18 03:07:04","revisionof":"","revisedto":"","release":"Rel-13","crspec":29.212,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":1314.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151101.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151102","title":"Diameter overload control over S9","source":"ZTE, China Telecom","contact":"Xiaoyun Zhou","contact-id":38525,"tdoctype":"CR","for":"Decision","abstract":"Support the Diameter overload control over S9","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4100,"status":"merged","reservation_date":"2015-05-14 08:05:49","uploaded":"2015-05-18 03:07:05","revisionof":"","revisedto":"","release":"Rel-13","crspec":29.215,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":377.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151102.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151103","title":"Diameter overload control over S9a","source":"ZTE, China Telecom","contact":"Xiaoyun Zhou","contact-id":38525,"tdoctype":"CR","for":"Decision","abstract":"Support the Diameter overload control over S9a","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4110,"status":"merged","reservation_date":"2015-05-14 08:05:49","uploaded":"2015-05-18 03:07:05","revisionof":"","revisedto":"","release":"Rel-13","crspec":29.215,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":378.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151103.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151104","title":"Diameter overload control over Sy","source":"ZTE, China Telecom","contact":"Xiaoyun Zhou","contact-id":38525,"tdoctype":"CR","for":"Decision","abstract":"Support the Diameter overload control over Sy","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4120,"status":"revised","reservation_date":"2015-05-14 08:05:50","uploaded":"2015-05-18 03:07:05","revisionof":"","revisedto":"C3-151248","release":"Rel-13","crspec":29.219,"crspecversion":"13.0.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":32.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151104.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151105","title":"Diameter overload control over Np","source":"ZTE, China Telecom","contact":"Xiaoyun Zhou","contact-id":38525,"tdoctype":"pCR","for":"Decision","abstract":"Support the Diameter overload control over Np","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4130,"status":"revised","reservation_date":"2015-05-14 08:05:50","uploaded":"2015-05-18 03:07:05","revisionof":"","revisedto":"C3-151249","release":"Rel-13","crspec":29.217,"crspecversion":"","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151105.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151144","title":"Diameter overload control over S9a interface","source":"Huawei","contact":"Yizhuang Wu","contact-id":61155,"tdoctype":"CR","for":"Decision","abstract":"Diameter overload control procedure over the S9a interface is added.","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4150,"status":"revised","reservation_date":"2015-05-15 11:31:39","uploaded":"2015-05-18 10:35:01","revisionof":"","revisedto":"C3-151247","release":"Rel-13","crspec":29.215,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":380.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151144.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151145","title":"Diameter overload control over S15 interface","source":"Huawei","contact":"Yizhuang Wu","contact-id":61155,"tdoctype":"CR","for":"Decision","abstract":"Diameter overload control procedure over the S15 interface is added","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4160,"status":"revised","reservation_date":"2015-05-15 11:31:39","uploaded":"2015-05-18 10:35:01","revisionof":"","revisedto":"C3-151245","release":"Rel-13","crspec":29.212,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":1325.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151145.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151146","title":"Diameter overload control over Sy interface","source":"Huawei","contact":"Yizhuang Wu","contact-id":61155,"tdoctype":"CR","for":"Decision","abstract":"Diameter overload control procedure over the Sy interface is added.","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4170,"status":"merged","reservation_date":"2015-05-15 11:31:39","uploaded":"2015-05-18 10:35:01","revisionof":"","revisedto":"","release":"Rel-13","crspec":29.219,"crspecversion":"13.0.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":33.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151146.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151147","title":"Adding access specific description for EPC-based untrusted non-3gpp access","source":"Huawei","contact":"Yizhuang Wu","contact-id":61155,"tdoctype":"CR","for":"Decision","abstract":"For consistency with stage 2, access specific description for EPC-based untrusted non-3gpp access is added.","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4270,"status":"merged","reservation_date":"2015-05-15 11:31:39","uploaded":"2015-05-18 10:35:01","revisionof":"","revisedto":"","release":"Rel-13","crspec":29.212,"crspecversion":"13.1.0","workitem":[{"winame":"TEI13"},{"winame":"SAES-St3-PCC"}],"crnumber":1326.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151147.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151245","title":"Diameter overload control over S15 interface","source":"Huawei","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR","for":"Decision","abstract":"Revision of C3-151145","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4180,"status":"agreed","reservation_date":"2015-07-24 07:56:06","uploaded":"2015-07-24 07:43:06","revisionof":"C3-151145","revisedto":"","release":"Rel-13","crspec":29.212,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":1325.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-150360","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151245.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151246","title":"Diameter overload control over S9","source":"ZTE, China Telecom, Huawei, Orange","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR","for":"Decision","abstract":"Merge of C3-151102 and of C3-151143","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4190,"status":"agreed","reservation_date":"2015-07-24 07:56:06","uploaded":"2015-07-24 07:43:07","revisionof":"C3-151143","revisedto":"","release":"Rel-13","crspec":29.215,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":377.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-150360","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151246.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151247","title":"Diameter overload control over S9a interface","source":"Huawei","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR","for":"Decision","abstract":"Merge of C3-151103 and C3-151144","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4200,"status":"agreed","reservation_date":"2015-07-24 07:56:06","uploaded":"2015-07-24 07:43:08","revisionof":"C3-151144","revisedto":"","release":"Rel-13","crspec":29.215,"crspecversion":"13.1.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":380.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-150360","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151247.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151248","title":"Diameter overload control over Sy","source":"ZTE","contact":"Alain Sultan","contact-id":10343,"tdoctype":"CR","for":"Decision","abstract":"Merge of C3-151104 and C3-151146.","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4210,"status":"agreed","reservation_date":"2015-07-24 07:56:07","uploaded":"2015-07-24 07:43:10","revisionof":"C3-151104","revisedto":"","release":"Rel-13","crspec":29.219,"crspecversion":"13.0.0","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":32.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-150360","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151248.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151249","title":"Diameter overload control over Np","source":"ZTE, China Telecom, Huaiwei, Orange","contact":"Alain Sultan","contact-id":10343,"tdoctype":"other","for":"Decision","abstract":"Revision of C3-151105","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4220,"status":"agreed","reservation_date":"2015-07-23 15:40:54","uploaded":"2015-07-23 15:39:30","revisionof":"C3-151105","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"cDOCME_PCC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151249.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151300","title":"Draft LS to SA5 on Diameter control overload over Sy","source":"Huawei","contact":"Alain Sultan","contact-id":10343,"tdoctype":"LS out","for":"Decision","abstract":"To inform SA5 that CT3 has agreed to support the Diameter overload control over Sy interface, impacting the behaviour of the OCS.","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4230,"status":"revised","reservation_date":"2015-07-23 15:41:15","uploaded":"2015-07-23 15:39:57","revisionof":"","revisedto":"C3-151396","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151300.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C3-151396","title":"Draft LS to SA5 on Diameter control overload over Sy","source":"Huawei","contact":"Alain Sultan","contact-id":10343,"tdoctype":"LS out","for":"Decision","abstract":"Revision of C3-151300","secretary_remarks":"","agenda_item_sort_order":222,"ainumber":"13.11","ainame":"Continuation of the Overload Control for PCC based Diameter applications [cDOCME_PCC]","tdoc_agenda_sort_order":4240,"status":"agreed","reservation_date":"2015-07-23 15:41:37","uploaded":"2015-07-23 15:40:20","revisionof":"C3-151300","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG3_interworking_ex-CN3\/TSGC3_81_Sanya\/Docs\/C3-151396.zip","group":"C3","meeting":"C3-81","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]