[{"name":"R3-174324","title":"Further Discussion and Stage2 pCR for SN Initiated SN Modification Procedure","source":"ZTE Corporation","contact":"Li Yang","contact-id":43509,"tdoctype":"pCR","for":"","abstract":"pCR, Rel-15,NR_newRAT","secretary_remarks":"","agenda_item_sort_order":68,"ainumber":"10.8.2.5","ainame":"Change between NGEN-DC DRB Options (Bearer Type Change)","tdoc_agenda_sort_order":43240,"status":"available","reservation_date":"2017-11-14 03:29:55","uploaded":"2017-11-17 05:35:37","revisionof":"","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"1.1.1","workitem":[{"winame":"NR_newRAT"},{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_98\/Docs\/R3-174324.zip","group":"R3","meeting":"R3-98","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174325","title":"Stage3 pCR for SN Initiated SN Modification Procedure","source":"ZTE Corporation","contact":"Li Yang","contact-id":43509,"tdoctype":"pCR","for":"","abstract":"pCR, Rel-15,NR_newRAT","secretary_remarks":"","agenda_item_sort_order":68,"ainumber":"10.8.2.5","ainame":"Change between NGEN-DC DRB Options (Bearer Type Change)","tdoc_agenda_sort_order":43250,"status":"available","reservation_date":"2017-11-14 03:33:25","uploaded":"2017-11-17 05:35:37","revisionof":"","revisedto":"","release":"Rel-15","crspec":38.423,"crspecversion":"0.4.0","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_98\/Docs\/R3-174325.zip","group":"R3","meeting":"R3-98","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]