[{"name":"R3-173475","title":"Introduction of EN-DC in 36.425","source":"ZTE Corporation","contact":"Li Yang","contact-id":43509,"tdoctype":"draftCR","for":"Agreement","abstract":"DraftCR, Rel-15,NR_newRAT\n(R3-172679)","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34750,"status":"not pursued","reservation_date":"2017-09-25 06:29:13","uploaded":"2017-09-30 05:20:36","revisionof":"","revisedto":"","release":"Rel-15","crspec":36.425,"crspecversion":"14.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173475.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173494","title":"Completion of the RRC tunnelling in MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"pCR","for":"Agreement","abstract":"In this paper, we have analysed the RRC transfer procedure and identified missing elements. Based on this, we propose:\n1.\tIn order to handle UL MCG split SRBs, the RRC Transfer procedure shall be enabled from SN towards MN.\n2.\tIn order to support on the","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34940,"status":"revised","reservation_date":"2017-09-25 13:05:26","uploaded":"2017-09-28 19:25:52","revisionof":"","revisedto":"R3-174132","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173494.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173495","title":"Completion of the RRC tunnelling in MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"other","for":"Endorsement","abstract":"A TP for BL CR\nAt RAN3 meeting #97, a mechanism to enable DL RRC tunneling for MCG split SRBs has been added to the baseline solutions for MR-DC. As explained in [1], this mechanism is incomplete. This TP provides changes to X2AP corresponding to the pro","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34950,"status":"revised","reservation_date":"2017-09-25 13:05:26","uploaded":"2017-09-28 19:25:52","revisionof":"","revisedto":"R3-174133","release":"Rel-15","crspec":36.423,"crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173495.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173497","title":"S-RLF handling for MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"pCR","for":"Agreement","abstract":"In this discussion paper, we have discussed the need for the network to prioritize the actions of MN and SN just after SCG RLF. \n1)\tOnce the old SN receives the SCG failure information, it shall process it and autonomously decide one of the following:","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34970,"status":"not pursued","reservation_date":"2017-09-25 13:05:26","uploaded":"2017-09-28 19:25:53","revisionof":"","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173497.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173498","title":"S-RLF handling for MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"other","for":"Endorsement","abstract":"A TP for BL CR","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34980,"status":"withdrawn","reservation_date":"2017-09-25 13:05:26","uploaded":"2017-09-28 19:25:53","revisionof":"","revisedto":"","release":"Rel-15","crspec":36.423,"crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173498.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173500","title":"RLC mode control","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"other","for":"Endorsement","abstract":"A TP for BL CR\nBoth for bearers mapped on RLC AM and RLC UM, the PDCP transmitter should ensure that not more than the reordering window of PDUs are in flight.\nNow that RAN2 has agreed to support split bearers mapped on RLC UM, this contribution discuss","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35000,"status":"not pursued","reservation_date":"2017-09-25 13:05:26","uploaded":"2017-09-28 19:25:53","revisionof":"","revisedto":"","release":"Rel-15","crspec":36.423,"crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173500.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173529","title":"Consideration on the Remaining issues of EN-DC Operation related aspects in TS 37.340","source":"ZTE","contact":"ZIJIANG MA","contact-id":34281,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35290,"status":"withdrawn","reservation_date":"2017-09-26 10:36:14","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173530","title":"TP 36.300 for counter check","source":"ZTE","contact":"ZIJIANG MA","contact-id":34281,"tdoctype":"draftCR","for":"Agreement","abstract":"In RAN2#99 meeting, counter check procedure is agreed, i.e., the similar counter check procedure in MR-DC will be used as that in LTE DC.\nAgreements for EN-DC and NG-EN-DC and NE-DC\n1: \tThe counter check procedure should be triggered by MN and SN indepe","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35300,"status":"revised","reservation_date":"2017-09-26 10:55:02","uploaded":"2017-09-29 08:58:16","revisionof":"","revisedto":"R3-174138","release":"Rel-15","crspec":36.3,"crspecversion":"14.4.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173530.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173531","title":"TP 38.300 for counter check","source":"ZTE","contact":"ZIJIANG MA","contact-id":34281,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35310,"status":"not pursued","reservation_date":"2017-09-26 10:56:57","uploaded":"2017-09-29 08:58:16","revisionof":"","revisedto":"","release":"Rel-15","crspec":38.3,"crspecversion":"1.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173531.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173543","title":"Documentation of option 3 in the F1 specifications and other specifications","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"discussion","for":"Decision","abstract":"At the last meeting R3-172714 started to address the areas that needed to be modified to correctly address option 3 in general but in particular. in the F1 specifications. That discussion got bogged down in a terminology discussion because it took the rou","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35430,"status":"noted","reservation_date":"2017-09-26 18:09:47","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173543.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173545","title":"Documentation of option 3 in in 38.470","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35450,"status":"revised","reservation_date":"2017-09-26 18:17:30","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174126","release":"Rel-15","crspec":38.47,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173545.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173546","title":"Documentation of option 3 in in 38.471","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35460,"status":"revised","reservation_date":"2017-09-26 18:19:06","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174127","release":"Rel-15","crspec":38.471,"crspecversion":"0.2.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173546.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173547","title":"Documentation of option 3 in in 38.472","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35470,"status":"revised","reservation_date":"2017-09-26 18:20:51","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174128","release":"Rel-15","crspec":38.472,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173547.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173548","title":"Documentation of option 3 in in 38.473","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35480,"status":"revised","reservation_date":"2017-09-26 18:23:20","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174129","release":"Rel-15","crspec":38.473,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173548.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173549","title":"Documentation of option 3 in in 38.474","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35490,"status":"revised","reservation_date":"2017-09-26 18:24:38","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174130","release":"Rel-15","crspec":38.474,"crspecversion":"0.1.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173549.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173550","title":"Documentation of option 3 in in 38.475","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35500,"status":"revised","reservation_date":"2017-09-26 18:25:54","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174131","release":"Rel-15","crspec":38.475,"crspecversion":"0.2.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173550.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173551","title":"Documentation of option 3 in in 38.401","source":"Interdigital Asia LLC","contact":"James Miller","contact-id":18834,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35510,"status":"revised","reservation_date":"2017-09-26 18:30:12","uploaded":"2017-09-29 18:15:07","revisionof":"","revisedto":"R3-174125","release":"Rel-15","crspec":38.401,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173551.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173587","title":"LS on single Tx switched UL","source":"3GPP RAN, Qualcomm","contact":"Issam Toufik","contact-id":53262,"tdoctype":"LS in","for":"Discussion","abstract":"RAN has discussed the issue of simultaneous dual Tx vs. single Tx for LTE-NR dual connectivity and endorsed the attached documents RP-172064, RP-172085. RAN agreed that all the RAN WGs should complete their tasks by December 2017 to allow the feature to b","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35870,"status":"noted","reservation_date":"2017-09-27 04:51:47","uploaded":"2017-09-27 05:08:32","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG4, RAN WG2","Cc":"RAN WG1, RAN WG3","lsoriginalls":"RP-172100","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173587.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173602","title":"Discussion on SCG Change","source":"CATT","contact":"Aijuan Liu","contact-id":43714,"tdoctype":"pCR","for":"Agreement","abstract":"In previous RAN2\/3 meetings, the concept \u201cSCG change\u201d in EN-DC has been introduced to stage 2 specification. However, there are some RAN3 related remaining issues for SCG change to be further discussed. This contribution focuses on these issues and accord","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":36020,"status":"revised","reservation_date":"2017-09-27 07:14:16","uploaded":"2017-09-30 02:00:22","revisionof":"","revisedto":"R3-174136","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.1","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173602.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173603","title":"TP for 36.423 on SCG Change","source":"CATT","contact":"Aijuan Liu","contact-id":43714,"tdoctype":"draftCR","for":"Agreement","abstract":"This contribution provides a stage3 TP on SCG change.","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":36030,"status":"revised","reservation_date":"2017-09-27 07:14:16","uploaded":"2017-09-30 02:00:22","revisionof":"","revisedto":"R3-174137","release":"Rel-15","crspec":36.423,"crspecversion":"14.4.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173603.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173709","title":"Further considerations for Xn\/X2 support for a case of a single TX operation with LTE\/NR dual connectivity","source":"Nokia, Nokia Shanghai Bell","contact":"Krzysztof Kordybach","contact-id":68359,"tdoctype":"discussion","for":"Discussion","abstract":"Discussion related to the LS from RAN on single TX UL (R3-173587 \/ RP-172100)\nAt RAN3 #97, it was decided that the X2\/Xn support for single-UL UEs shall be considered only when the basic framework for the solution is decided in RAN2. Since the discussion","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":37090,"status":"noted","reservation_date":"2017-09-28 10:50:04","uploaded":"2017-09-28 19:25:52","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173709.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173876","title":"X2AP Procedures Affected by NR Cell ID Length and Variable Length gNB ID","source":"VODAFONE Group Plc","contact":"Manook Soghomonian","contact-id":74776,"tdoctype":"discussion","for":"Decision","abstract":"Based on the brief analysis presented in this contribution, we believe that having different Cell ID length between LTE and NR cells could cause conflict in control signalling and difficulties in deployment.\nRAN3 is kindly asked to discuss this problem a","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":38760,"status":"noted","reservation_date":"2017-09-29 11:18:46","uploaded":"2017-09-29 14:27:18","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173876.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173909","title":"Corrections to BL CR for EN-DC","source":"Huawei, Nokia, Nokia Shanghai Bell, ZTE, Intel Corporation","contact":"Liwei Qiu","contact-id":45572,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":39090,"status":"agreed","reservation_date":"2017-09-29 15:06:00","uploaded":"2017-09-30 06:47:30","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173909.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173910","title":"Transport of RRC message for EN-DC","source":"Huawei","contact":"Liwei Qiu","contact-id":45572,"tdoctype":"other","for":"Approval","abstract":"In RAN3 #97 meeting, a new X2AP procedure was agreed to support MCG split SRB transmission, i.e., RRC Transfer. In this contribution, we will discuss the feasibility to reuse this procedure to support the NR measurement report via MeNB when there is no SC","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":39100,"status":"noted","reservation_date":"2017-09-29 15:06:00","uploaded":"2017-09-30 06:47:30","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173910.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-173917","title":"QoS and Slice for Option 7","source":"Huawei","contact":"Liwei Qiu","contact-id":45572,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":39170,"status":"withdrawn","reservation_date":"2017-09-29 15:06:00","uploaded":"2017-09-30 06:47:30","revisionof":"","revisedto":"","release":"Rel-15","crspec":38.423,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-173917.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174125","title":"Documentation of option 3 in in 38.401","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"At the last meeting R3-172714 started to address the areas that needed to be modified to correctly address option 3 in general but in particular. in the F1 specifications. That discussion got bogged down in a terminology discussion because it took the rou","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35511,"status":"agreed","reservation_date":"2017-10-17 12:51:14","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173551","revisedto":"","release":"Rel-15","crspec":38.401,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174125.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174126","title":"Documentation of option 3 in in 38.470","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35451,"status":"agreed","reservation_date":"2017-10-17 12:51:14","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173545","revisedto":"","release":"Rel-15","crspec":38.47,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174126.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174127","title":"Documentation of option 3 in in 38.471","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35461,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173546","revisedto":"","release":"Rel-15","crspec":38.471,"crspecversion":"0.2.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174127.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174128","title":"Documentation of option 3 in in 38.472","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35471,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173547","revisedto":"","release":"Rel-15","crspec":38.472,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174128.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174129","title":"Documentation of option 3 in in 38.473","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35481,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173548","revisedto":"","release":"Rel-15","crspec":38.473,"crspecversion":"0.3.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174129.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174130","title":"Documentation of option 3 in in 38.474","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35491,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173549","revisedto":"","release":"Rel-15","crspec":38.474,"crspecversion":"0.1.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174130.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174131","title":"Documentation of option 3 in in 38.475","source":"Interdigital Asia LLC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35501,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173550","revisedto":"","release":"Rel-15","crspec":38.475,"crspecversion":"0.2.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174131.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174132","title":"Completion of the RRC tunnelling in MR-DC","source":"Nokia, Nokia Shanghai Bell, ZTE","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"At RAN3 meeting #97-bis, it was discussed how to handle following aspects related to the RRC Transfer procedure:\n\u2022\tUL transfer of RRC messages via SgNB for MCG split SRBs\n\u2022\tDL and UL transfer of the NR RRC messages to\/from the UE in case the SCG SRB is","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34941,"status":"agreed","reservation_date":"2017-10-17 12:51:15","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173494","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174132.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174133","title":"Completion of the RRC tunnelling in MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34951,"status":"revised","reservation_date":"2017-10-17 12:51:16","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173495","revisedto":"R3-174204","release":"Rel-15","crspec":36.423,"crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174133.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174136","title":"Discussion on SCG Change","source":"CATT","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":36021,"status":"agreed","reservation_date":"2017-10-17 12:51:17","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173602","revisedto":"","release":"Rel-15","crspec":37.34,"crspecversion":"1.0.1","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174136.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174137","title":"TP for 36.423 on SCG Change","source":"CATT","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draftCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":36031,"status":"agreed","reservation_date":"2017-10-17 12:51:17","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173603","revisedto":"","release":"Rel-15","crspec":36.423,"crspecversion":"14.4.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174137.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174138","title":"TP 36.300 for counter check","source":"ZTE","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draftCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35301,"status":"revised","reservation_date":"2017-10-17 12:51:17","uploaded":"2017-10-17 12:57:55","revisionof":"R3-173530","revisedto":"R3-174206","release":"Rel-15","crspec":36.3,"crspecversion":"14.4.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174138.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174139","title":"Way forward for enabling delta signalling","source":"Nokia, Nokia Shanghai Bell","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Discussion","abstract":"At RAN3 meeting #97-bis, it was discussed how to address the request from RAN2 to enable delta signaling in MN-initiated SN change.\nThis paper summarises the offline discussion and proposes a way forward.\nFollowing agreements are made:\n1)\tTaking into a","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":413900,"status":"noted","reservation_date":"2017-10-17 12:51:17","uploaded":"2017-10-17 12:57:55","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174139.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174204","title":"Completion of the RRC tunnelling in MR-DC","source":"Nokia, Nokia Shanghai Bell","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":34952,"status":"endorsed","reservation_date":"2017-10-17 12:51:31","uploaded":"2017-10-17 12:57:55","revisionof":"R3-174133","revisedto":"","release":"Rel-15","crspec":36.423,"crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174204.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R3-174206","title":"TP 36.300 for counter check","source":"ZTE","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draftCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":55,"ainumber":"10.8.1.2","ainame":"General","tdoc_agenda_sort_order":35302,"status":"agreed","reservation_date":"2017-10-17 12:51:31","uploaded":"2017-10-17 12:57:55","revisionof":"R3-174138","revisedto":"","release":"Rel-15","crspec":36.3,"crspecversion":"14.4.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG3_Iu\/TSGR3_97bis\/Docs\/R3-174206.zip","group":"R3","meeting":"R3-97","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]